Design and operation of dynamic assembly lines using work-sharing
暂无分享,去创建一个
[1] Donald D. Eisenstein,et al. A Production Line that Balances Itself , 1996, Oper. Res..
[2] John O. McClain,et al. Self-buffering, self-balancing, self-flushing production lines , 1996 .
[3] 門田 安弘,et al. Toyota production system : practical approach to production management , 1983 .
[4] Diane P. Bischak. Performance of a manufacturing module with moving workers , 1996 .
[5] Ilker Baybars,et al. A survey of exact algorithms for the simple assembly line balancing , 1986 .
[6] Soumen Ghosh,et al. A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems , 1989 .
[7] Armin Scholl,et al. State-of-the-art exact and heuristic solution procedures for simple assembly line balancing , 2006, Eur. J. Oper. Res..
[8] H. Van Brussel,et al. Planning and Scheduling of Assembly Systems , 1990 .
[9] John O. McClain,et al. “On-the-fly” line balancing with very little WIP , 1992 .
[10] WALLACE J. HOPP,et al. Performance Opportunity for Workforce Agility in Collaborative and Noncollaborative Work Systems , 2001 .
[11] Wallace J. Hopp,et al. Agile workforce evaluation: a framework for cross-training and coordination , 2004 .
[12] Wallace J. Hopp,et al. Benefits of Skill Chaining in Serial Production Lines with Cross-Trained Workers , 2004, Manag. Sci..
[13] John O. McClain,et al. Management of Worksharing Systems , 2000, Manuf. Serv. Oper. Manag..