A Two-Echelon Supply Chain Management With Setup Time and Cost Reduction, Quality Improvement and Variable Production Rate

This model investigates the variable production cost for a production house; under a two-echelon supply chain management where a single vendor and multi-retailers are involved. This production system goes through a long run system and generates an out-of-control state due to different issues and produces defective items. This model considers the reduction of the defective rate and setup cost through investment. A discrete investment for setup cost reduction and a continuous investment is considered to reduce the defective rate and to increase the quality of products. Setup and processing time are dependent on lead time in this model. The model is solved analytically to find the optimal values of the production rate, safety factors, optimum quantity, lead time length, investment for setup cost reduction, and the probability of the production process going out-of-control. An efficient algorithm is constructed to find the optimal solution numerically and sensitivity analysis is given to show the impact of different parameters. A case study and different cases are also given to validate the model.

[1]  Horng-Jinh Chang,et al.  An economic manufacturing quantity model for a two-stage assembly system with imperfect processes and variable production rate , 2012, Comput. Ind. Eng..

[2]  Milu Acharya,et al.  An Inventory Control for Non-instantaneous Deteriorating Items with Non-zero Lead Time and Partial Backlogging Under Joint Price and Time Dependent Demand , 2017 .

[3]  Shib Sankar Sana An EOQ model for stochastic demand for limited capacity of own warehouse , 2015, Ann. Oper. Res..

[4]  A. Banerjee A JOINT ECONOMIC-LOT-SIZE MODEL FOR PURCHASER AND VENDOR , 1986 .

[5]  Suresh Kumar Goyal,et al.  Economic ordering policy for deteriorating items over an infinite time horizon , 1987 .

[6]  Christoph H. Glock,et al.  The effect of forward integration on a single-vendor–multi-retailer supply chain under retailer competition , 2015 .

[7]  Biswajit Sarkar,et al.  Optimal batch quantity in a cleaner multi-stage lean production system with random defective rate , 2016 .

[8]  Jason Chao-Hsien Pan,et al.  A study of an integrated inventory with controllable lead time , 2002 .

[9]  G. Gallego,et al.  Distribution Free Procedures for Some Inventory Models , 1994 .

[10]  Jonathan Burton,et al.  Coordinated vs. independent inventory replenishment policies for a vendor and multiple buyers , 1994 .

[11]  Biswajit Sarkar,et al.  An integrated inventory model involving discrete setup cost reduction, variable safety factor, selling price dependent demand, and investment , 2019, RAIRO Oper. Res..

[12]  B. Sarkar,et al.  Supply Chain Model with Stochastic Lead Time, Trade-Credit Financing, and Transportation Discounts , 2017 .

[13]  Sarla Pareek,et al.  Inventory Model with Exponential Time-Dependent Demand Rate, Variable Deterioration, Shortages and Production Cost , 2017 .

[14]  Avijit Banerjee,et al.  A coordinated order-up-to inventory control policy for a single supplier and multiple buyers using electronic data interchange , 1994 .

[15]  B. Sarkar Supply Chain Coordination with Variable Backorder, Inspections, and Discount Policy for Fixed Lifetime Products , 2016 .

[16]  L. Ouyang,et al.  Mixture Inventory Model with Backorders and Lost Sales for Variable Lead Time , 1996 .

[17]  B. Sarkar,et al.  An economic production quantity model with random defective rate, rework process and backorders for a single stage production system , 2014 .

[18]  G. Gallego,et al.  The Distribution Free Newsboy Problem: Review and Extensions , 1993 .

[19]  B. Sarkar,et al.  Improved quality, setup cost reduction, and variable backorder costs in an imperfect production process , 2014 .

[20]  L. Cárdenas-Barrón,et al.  Learning and screening errors in an EPQ inventory model for supply chains with stochastic lead time demands , 2017, Int. J. Prod. Res..

[21]  L. Ouyang,et al.  Integrated vendor–buyer cooperative models with stochastic demand in controllable lead time , 2004 .

[22]  M. A. Hoque,et al.  Synchronization in the single-manufacturer multi-buyer integrated inventory supply chain , 2008, Eur. J. Oper. Res..

[23]  Kripa Shanker,et al.  Two-echelon supply chain inventory model with controllable lead time and service level constraint , 2009, Comput. Ind. Eng..

[24]  R. Uthayakumar,et al.  Reducing lost-sales rate in (T, R, L) inventory model with controllable lead time , 2010 .

[25]  K. S. Chaudhuri,et al.  An EMQ model in an imperfect production process , 2010, Int. J. Syst. Sci..

[26]  Ata Allah Taleizadeh,et al.  An improved solution to replenishment lot size problem with discontinuous issuing policy and rework, and the multi-delivery policy into economic production lot size problem with partial rework , 2012, Expert Syst. Appl..

[27]  Rehman Akhtar,et al.  Impact of random defective rate on lot size focusing work-in-process inventory in manufacturing system , 2017 .

[28]  Biswajit Sarkar,et al.  An improved way to calculate imperfect items during long-run production in an integrated inventory model with backorders , 2018 .

[29]  Leopoldo Eduardo Cárdenas-Barrón,et al.  Celebrating a century of the economic order quantity model in honor of Ford Whitman Harris , 2014 .

[30]  Bikash Koli Dey,et al.  Two-echelon supply chain model with manufacturing quality improvement and setup cost reduction , 2016 .

[31]  H. Wee,et al.  An integrated production-inventory model with imperfect production processes and Weibull distribution deterioration under inflation , 2007 .

[32]  Debjani Chakraborty,et al.  A Continuous Review Inventory Model with Fuzzy Service Level Constraint and Fuzzy Random Variable Parameters , 2017 .

[33]  Biswajit Sarkar,et al.  Integrated vendor-buyer supply chain model with vendor's setup cost reduction , 2013, Appl. Math. Comput..

[34]  Leopoldo Eduardo Cárdenas-Barrón,et al.  An improved solution to the replenishment policy for the EMQ model with rework and multiple shipments , 2013 .

[35]  K. S. Chaudhuri,et al.  A distribution-free newsvendor problem with nonlinear holding cost , 2015, Int. J. Syst. Sci..

[36]  Monami Das Roy,et al.  An integrated producer–buyer relationship in the environment of EMQ and JIT production systems , 2012 .

[37]  Tapan Kumar Roy,et al.  A Production: Inventory Model for Defective Items with Shortages Incorporating Inflation and Time Value of Money , 2017 .

[38]  Hui-Ming Wee,et al.  An alternative analysis and solution procedure for the EPQ model with rework process at a single-stage manufacturing system with planned backorders , 2013, Comput. Ind. Eng..

[39]  S. Goyal,et al.  An integrated inventory model involving manufacturing setup cost reduction in compound Poisson process , 2011 .

[40]  Umakanta Mishra,et al.  An EOQ Model with Time Dependent Weibull Deterioration, Quadratic Demand and Partial Backlogging , 2015, International Journal of Applied and Computational Mathematics.

[41]  C. Liao,et al.  An Analytical Determination of Lead Time with Normal Demand , 1991 .

[42]  Chandra K. Jaggi,et al.  A multi-retailer supply chain model with backorder and variable production cost , 2018, RAIRO Oper. Res..

[43]  Shib Sankar Sana,et al.  A mathematical model on EPQ for stochastic demand in an imperfect production system , 2013 .

[44]  Abraham Mehrez,et al.  Economic Production Lot Size Model with Variable Production Rate and Imperfect Quality , 1994 .

[45]  Sarada Prasad Sarmah,et al.  Coordination of a single-manufacturer/multi-buyer supply chain with credit option , 2008 .

[46]  Suresh Kumar Goyal,et al.  An integrated inventory model for a single supplier-single customer problem , 1977 .

[47]  Biswajit Sarkar,et al.  A production-inventory model with probabilistic deterioration in two-echelon supply chain management , 2013 .

[48]  Abdul Raouf,et al.  Inventory Models Involving Lead Time as a Decision Variable , 1994 .