Comparison of Heuristic for Flow Shop Scheduling Problems with Sequence Dependent Setup Time
暂无分享,去创建一个
[1] M. Gholami,et al. Scheduling hybrid flow shop with sequence-dependent setup times and machines with random breakdowns , 2009 .
[2] Ravi Sethi,et al. The Complexity of Flowshop and Jobshop Scheduling , 1976, Math. Oper. Res..
[3] Chuen-Lung Chen,et al. An application of genetic algorithms for flow shop problems , 1995 .
[4] Inyong Ham,et al. A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem , 1983 .
[5] Poonam Garg,et al. A Comparison between Memetic algorithm and Genetic algorithm for the cryptanalysis of Simplified Data Encryption Standard algorithm , 2010, ArXiv.