WORK ACCELERATION STRATEGY DEVELOPMENT ON DESIGN-BUILD PROJECT TO IMPROVE RISK BASED QUALITY PERFORMANCE
暂无分享,去创建一个
[1] Albert P.C. Chan,et al. Determinants of Successful Design-Build Projects , 2008 .
[2] Bradley Benhart,et al. Design and Build: Perception of Project Owners and Contractors on Cost in Java, Indonesia , 2017 .
[3] Anthony D. Songer,et al. PROJECT CHARACTERISTICS FOR SUCCESSFUL PUBLIC-SECTOR DESIGN-BUILD , 1997 .
[4] Ap King,et al. Supply side short-circuiting in design and build projects , 2002 .
[5] Indrasurya B. Mochtar,et al. Pengembangan Metode Fast-Track untuk Mereduksi Waktu dan Biaya Pelaksanaan Proyek Studi Kasus Rumah Menengah di Malang, Jawa Timur , 2009 .
[6] Xiaoxiao Li,et al. Comparison of Cost and Time Performance of Design-Build and Design-Bid-Build Delivery Systems in Florida , 2013 .
[7] Emmanuel,et al. Impact of Risk on Performance of Design and Build Projects in Lagos State, Nigeria , 2012 .
[8] Keith R. Molenaar,et al. Project Administration for Design-Build Contracts: A Primer for Owners, Engineers, and Contractors , 2010 .
[9] Hamimah Adnan,et al. Success Factors of Design and Build Projects in Public Universities , 2012 .
[10] Victor Sanvido,et al. IMPLEMENTING A DESIGN/BuILD PREQUALIFICATION SYSTEM , 1995 .
[11] Edyta Plebankiewicz,et al. Design and Build Procurement System – Contractor Selection , 2012 .
[12] Keith R. Molenaar,et al. PUBLIC-SECTOR DESIGN/BUILD EVOLUTION AND PERFORMANCE , 1999 .