Identification and illumination of popular misconceptions about project scheduling and time buffering in a resource-constrained environment

The lack of proper project planning is often cited as one of the main reasons why projects fail to be completed in time and within budget. In this paper, we identify and illuminate several possible misconceptions that go round in project management periodicals and in the mindset of practising project managers and that may hamper successful project planning. The misconceptions relate to the role of the critical path, the critical sequence (critical chain), active schedules, and the insertion of buffers in the baseline schedule as a protective mechanism against schedule distortions during project execution. The possible fallacies are illustrated using example schedules developed for an illustrative project.

[1]  Pilar Tormos,et al.  Tools for resource-constrained project scheduling and control: forward and backward slack analysis , 2001, J. Oper. Res. Soc..

[2]  Robert J Willis Critical path analysis and resource constrained project scheduling -- Theory and practice , 1985 .

[3]  Pilar Tormos,et al.  The Evolution of Software Quality in Project Scheduling , 1999 .

[4]  Willy Herroelen,et al.  An evaluation of microcomputer-based software packages for project management , 1990 .

[5]  Terry Williams Criticality in Stochastic Networks , 1992 .

[6]  Edward Yourdon,et al.  Death March , 1997 .

[7]  James Jerome O'Brien CPM IN CONSTRUCTION MANAGEMENT. SCHEDULING BY THE CRITICAL PATH METHOD , 1965 .

[8]  Robert C. Newbold,et al.  Project Management in the Fast Lane: Applying the Theory of Constraints , 1998 .

[9]  Lawrence P. Leach,et al.  Critical Chain Project Management , 2000 .

[10]  Erik Demeulemeester,et al.  Project scheduling : a research handbook , 2002 .

[11]  Neng-Hui Shih,et al.  ON THE PROJECT SCHEDULING UNDER RESOURCE CONSTRAINTS , 2006 .

[12]  Jerome D. Wiest Some Properties of Schedules for Large Projects with Limited Resources , 1964 .

[13]  Rema Padman,et al.  An integrated survey of deterministic project scheduling , 2001 .

[14]  Rolf H. Möhring,et al.  Resource-constrained project scheduling: Notation, classification, models, and methods , 1999, Eur. J. Oper. Res..

[15]  Michael T. Pich,et al.  Managing project uncertainty: from variation to chaos , 2002, IEEE Engineering Management Review.

[16]  Richard J. Schonberger,et al.  Why Projects Are “Always” Late: A Rationale Based on Manual Simulation of a PERT/CPM Network , 1981 .

[17]  W. Duncan A GUIDE TO THE PROJECT MANAGEMENT BODY OF KNOWLEDGE , 1996 .

[18]  Rainer Kolisch,et al.  Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem , 1995 .

[19]  Rainer Kolisch Resource Allocation Capabilities of Commercial Project Management Software Packages , 1999, Interfaces.

[20]  U Dave,et al.  Critical Chain , 1998, J. Oper. Res. Soc..

[21]  Robert J Willis,et al.  Resource Constrained Scheduling within Fixed Project Durations , 1993 .

[22]  J. D. Wiest,et al.  A management guide to PERT/CPM: With GERT/PDM/DCPM and other networks , 1977 .

[23]  Erik Demeulemeester,et al.  Resource-constrained project scheduling: A survey of recent developments , 1998, Comput. Oper. Res..

[24]  Jan Węglarz,et al.  Project scheduling : recent models, algorithms, and applications , 1999 .

[25]  Gündüz Ulusoy,et al.  A survey on the resource-constrained project scheduling problem , 1995 .

[26]  James M. Wilson,et al.  Gantt charts: A centenary appreciation , 2003, Eur. J. Oper. Res..

[27]  Bruce M. Woodworth,et al.  Identifying the critical sequence in a resource constrained project , 1988 .

[28]  A. R. Klingel,et al.  Bias in Pert Project Completion Time Calculations for a Real Network , 1966 .

[29]  Reha Uzsoy,et al.  Predictable scheduling of a job shop subject to breakdowns , 1998, IEEE Trans. Robotics Autom..

[30]  S. Keoki. Sears,et al.  Construction Project Management , 1972 .

[31]  John Bowers,et al.  Criticality in Resource Constrained Networks , 1995 .

[32]  Tzvi Raz,et al.  Effect of resource constraints on float calculations in project networks , 1996 .

[33]  Pei-Chann Chang,et al.  One-machine rescheduling heuristics with efficiency and stability as criteria , 1993, Comput. Oper. Res..

[34]  Willy Herroelen,et al.  Project scheduling under uncertainty: Survey and research potentials , 2005, Eur. J. Oper. Res..