Preventive Maintenance Prioritization by Fuzzy Logic for Seamless Hydro Power Generation

Preventive maintenance prioritization is one of the most important criteria for the electricity generation planners to minimize the down time and production costs. Break down of equipments increases costs and plant down time results in loss of business. This work focuses on prioritizing the preventive maintenance for seamless hydro power generation considering (24 × 7) client’s power demand using fuzzy logic. The main task involves prioritizing the maintenance work considering constraints of varied power demand and hydro turbine plant breakdown. Fuzzy logic is used to optimize the preventive maintenance prioritization under the main constraints. Manual fuzzy arithmetic is used to develop the model and MATLAB Fuzzy Inference System editor used to validate the same. This novel fuzzy logic approach of preventive maintenance prioritizing for hydro power generation is absent in renewable power generation and industrial engineering literatures due to its assessment complexity.

[1]  Tasneem Abbasi,et al.  Small hydro and the environmental implications of its extensive utilization , 2011 .

[2]  Sanjoy Kumar Paul,et al.  Selection of the optimal number of shifts in fuzzy environment: manufacturing company’s facility application , 2010 .

[3]  Walter Leal Filho,et al.  Environmental impacts typology: a methodological proposal , 2011 .

[4]  S. R. Ansari,et al.  Multi-criteria decision making using fuzzy logic approach for evaluating the manufacturing flexibility , 2010 .

[5]  Akio Kondo,et al.  Development of technology foresight: integration of technology roadmapping and the Delphi method , 2008 .

[6]  Lotfi A. Zadeh,et al.  The Concepts of a Linguistic Variable and its Application to Approximate Reasoning , 1975 .

[7]  Antonio Carlos Caetano Souza Assessment and statistics of Brazilian hydroelectric power plants: Dam areas versus installed and firm power , 2008 .

[8]  Bobby Schmidt,et al.  Fuzzy math , 2001 .

[9]  R. Venkata Rao,et al.  Material Selection Using a Novel Multiple Attribute Decision Making Method , 2011, Int. J. Manuf. Mater. Mech. Eng..

[10]  Lotfi A. Zadeh,et al.  The concept of a linguistic variable and its application to approximate reasoning-III , 1975, Inf. Sci..

[11]  Augusta Conchiglia,et al.  The Case of Ghana , 2021, Financialisation and Poverty Alleviation in Ghana.

[12]  Asis Mazumdar,et al.  SAFE AND EFFICIENT CONTROL OF HYDRO POWER PLANT BY FUZZY LOGIC , 2012 .

[13]  Haris Doukas,et al.  Hydro energy: techno-economic and social aspects within new climate regime , 2011 .

[14]  Lotfi A. Zadeh,et al.  Fuzzy logic = computing with words , 1996, IEEE Trans. Fuzzy Syst..

[15]  Madhusudana N. Rao Implementation of a small hydro power project in India: issues and lessons , 2011 .