Research and Teaching Opportunities in Project Management
暂无分享,去创建一个
[1] D. Mihaljek,et al. Project evaluation and uncertainty in practice : a statistical analysis of rate-of-return divergences of 1,015 World Bank projects , 1992 .
[2] Mario Vanhoucke,et al. An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances , 2014, Eur. J. Oper. Res..
[3] Salah E. Elmaghraby. On criticality and sensitivity in activity networks , 2000, Eur. J. Oper. Res..
[4] Thomas Mengel,et al. Outcome-based project management education for emerging leaders – A case study of teaching and learning project management , 2008 .
[5] Mario Vanhoucke,et al. A simulation and evaluation of earned value metrics to forecast the project duration , 2005, J. Oper. Res. Soc..
[6] J. George,et al. Work Interrupted: A Closer Look at the Role of Interruptions in Organizational Life , 2003 .
[7] A. Shtub,et al. A branch and bound algorithm for scheduling projects to maximize net present value: The case of time dependent, contingent cash flows , 1997 .
[8] Willy Herroelen,et al. Dynamic order acceptance and capacity planning on a single bottleneck resource , 2007 .
[9] Manouchehr Tabatabaei,et al. Online Teaching and Learning Project Management , 2014 .
[10] Tyson R. Browning,et al. A random generator of resource-constrained multi-project network problems , 2010, J. Sched..
[11] Shlomo Globerson. Impact of various work-breakdown structures on project conceptualization , 1994 .
[12] Kenneth G. Cooper. Your Project's Real Price Tag , 2003 .
[13] S. Selcuk Erenguc,et al. A Branch and Bound Procedure for the Resource Constrained Project Scheduling Problem with Discounted Cash Flows , 1996 .
[14] Graham K. Rand. Critical chain: the theory of constraints applied to project management , 2000 .
[15] A. Samli,et al. Counteracting Global Industrial Espionage: A Damage Control Strategy , 2003 .
[16] Muhittin Oral,et al. Project evaluation and selection in a network of collaboration: A consensual disaggregation multi-criterion approach , 2001, Eur. J. Oper. Res..
[17] D. S. Remer,et al. A Compendium and Comparison of 25 Project Evaluation Techniques. Part 1: Net Present Value and Rate of Return Methods , 1995 .
[18] Paul S. Adler,et al. From project to process management: an empirically-based framework for analyzing product development time , 1995 .
[19] J. Patterson,et al. Scheduling a Project to Maximize Its Present Value: A Zero-One Programming Approach , 1977 .
[20] Dimitris Bertsimas,et al. Persistence in discrete optimization under data uncertainty , 2006, Math. Program..
[21] Stephen C. Graves,et al. Technology portfolio management: optimizing interdependent projects over multiple time periods , 2001, IEEE Trans. Engineering Management.
[22] Kieran Conboy,et al. Agility from First Principles: Reconstructing the Concept of Agility in Information Systems Development , 2009, Inf. Syst. Res..
[23] Walter O. Rom,et al. An investigation of buffer sizing techniques in critical chain scheduling , 2006, Eur. J. Oper. Res..
[24] Yossi Lichtenstein,et al. Real Options in Information Technology Risk Management: An Empirical Validation of Risk-Option Relationships , 2006, MIS Q..
[25] Anton J. Kleywegt,et al. The Dynamic and Stochastic Knapsack Problem , 1998, Oper. Res..
[26] Avraham Shtub,et al. Work Breakdown Structure , 2007 .
[27] Karen Ayas. Professional project management: a shift towards learning and a knowledge creating structure , 1996 .
[28] Sungkwon Woo,et al. Flexible Work Breakdown Structure for Integrated Cost and Schedule Control , 2004 .
[29] Alberto De Marco,et al. An Earned Schedule-based regression model to improve cost estimate at completion , 2014 .
[30] C. Prahalad,et al. Corporate imagination and expeditionary marketing. , 1991, Harvard business review.
[31] Yong Zhao,et al. Designing Domain Work Breakdown Structure (DWBS) Using Neural Networks , 2009, ISNN.
[32] M. Rabin. Risk Aversion and Expected Utility Theory: A Calibration Theorem , 2000 .
[33] Ali Yassine,et al. Complex Concurrent Engineering and the Design Structure Matrix Method , 2003, Concurr. Eng. Res. Appl..
[34] Chen-Fu Chien,et al. A Portfolio-Evaluation Framework for Selecting R&D Projects , 2002 .
[35] Igor Averbakh,et al. Project scheduling under competition , 2005 .
[36] Cynthia S. Hood,et al. Teaching software project management using simulations , 2006, ITICSE '06.
[37] Xuan Vinh Doan,et al. On the Complexity of Nonoverlapping Multivariate Marginal Bounds for Probabilistic Combinatorial Optimization Problems , 2012, Oper. Res..
[38] John A. Muckstadt,et al. Stochastic Analysis of Cyclic Schedules , 1993, Oper. Res..
[39] Mario Vanhoucke,et al. Classification of articles and journals on project control and earned value management , 2015 .
[40] Joseph Y.-T. Leung,et al. The effects of multitasking on operations scheduling , 2015 .
[41] Rolf H. Möhring,et al. Resource-constrained project scheduling: Notation, classification, models, and methods , 1999, Eur. J. Oper. Res..
[42] A. Shtub,et al. Scheduling projects to maximize net present value — the case of time-dependent, contingent cash flows , 1997 .
[43] Rolf H. Möhring,et al. A Computational Study on Bounding the Makespan Distribution in Stochastic Project Networks , 2001, Ann. Oper. Res..
[44] Dimitris Bertsimas,et al. Probabilistic Combinatorial Optimization: Moments, Semidefinite Programming, and Asymptotic Bounds , 2004, SIAM J. Optim..
[45] Chen-Yu Chang. A critical analysis of recent advances in the techniques for the evaluation of renewable energy projects , 2013 .
[46] Barry W. Boehm,et al. Get Ready for Agile Methods, with Care , 2002, Computer.
[47] T. Kotnour. Organizational learning practices in the project management environment , 2000 .
[48] L. M. Naeni,et al. A fuzzy approach for the earned value management , 2011 .
[49] Jürgen Zimmermann,et al. A steepest ascent approach to maximizing the net present value of projects , 2001, Math. Methods Oper. Res..
[50] Richard J. Schonberger,et al. Why Projects Are “Always” Late: A Rationale Based on Manual Simulation of a PERT/CPM Network , 1981 .
[51] Öncü Hazır. A review of analytical models, approaches and decision support tools in project monitoring and control , 2015 .
[52] Michael R. Duffey,et al. Statistical dependence in risk analysis for project networks using Monte Carlo methods , 1999 .
[53] Joel Goh,et al. Total Cost Control in Project Management via Satisficing , 2013, Manag. Sci..
[54] Ofer Zwikael,et al. Prediction of project outcome The Application of statistical methods to earned value management and earned schedule performance indexes , 2009 .
[55] Tarek K. Abdel-Hamid,et al. Understanding the "90% syndrome" in software project management: A simulation-based case study , 1988, J. Syst. Softw..
[56] A. D. Henriksen,et al. A practical R&D project-selection scoring tool , 1999 .
[57] Herman Steyn. Project management applications of the theory of constraints beyond critical chain scheduling , 2002 .
[58] J. Dawson,et al. Learning in manufacturing organizations: what factors predict effectiveness? , 2002 .
[59] J. J. Martin. Distribution of the Time Through a Directed, Acyclic Network , 1965 .
[60] L. S. Shapley,et al. 17. A Value for n-Person Games , 1953 .
[61] Erik Demeulemeester,et al. A branch-and-bound procedure for the multiple resource-constrained project scheduling problem , 1992 .
[62] Kum Khiong Yang,et al. Scheduling a project to maximize its net present value: An integer programming approach , 1993 .
[63] A. Roy. Safety first and the holding of assetts , 1952 .
[64] Richard F. Deckro,et al. Project scheduling with work packages , 1992 .
[65] Salah E. Elmaghraby,et al. On the measurement of complexity in activity networks , 1980 .
[66] Rolf H. Möhring,et al. Scheduling under Uncertainty: Bounding the Makespan Distribution , 2001, Computational Discrete Mathematics.
[67] Vidyadhar G. Kulkarni,et al. Markov and Markov-Regenerative pert Networks , 1986, Oper. Res..
[68] R. Etgar. Scheduling project activities to maximize the net present value the case of linear time-dependent cash flows , 1999 .
[69] Willy Herroelen,et al. Project scheduling under uncertainty: Survey and research potentials , 2005, Eur. J. Oper. Res..
[70] Christian Stummer,et al. Research and development project selection and resource allocation: a review of quantitative modelling approaches , 1999 .
[71] Giovanni Mummolo. Measuring uncertainty and criticality in network planning by PERT-path technique , 1997 .
[72] Marco Platzner,et al. Operating systems for reconfigurable embedded platforms: online scheduling of real-time tasks , 2004, IEEE Transactions on Computers.
[73] Melvyn Sim,et al. Distributionally Robust Optimization and Its Tractable Approximations , 2010, Oper. Res..
[74] C. William Ibbs,et al. SCHEDULE-BASED CONSTRUCTION INCENTIVES , 1989 .
[75] D. Malcolm,et al. Application of a Technique for Research and Development Program Evaluation , 1959 .
[76] R. Cooper,et al. Portfolio management for new product development: results of an industry practices study , 2001 .
[77] Daniel Gómez,et al. A rule for slack allocation proportional to the duration in a PERT network , 2008, Eur. J. Oper. Res..
[78] Nicholas G. Hall. Project management: Recent developments and research opportunities , 2012 .
[79] B. W. Ang,et al. A comparative analysis of R&D project evaluation methods , 2001 .
[80] Robert A. Russell,et al. A comparison of heuristics for scheduling projects with cash flows and resource restrictions , 1986 .
[81] Udechukwu Ojiako,et al. Learning and teaching challenges in project management , 2011 .
[82] Mario Vanhoucke,et al. Construction and evaluation framework for a real-life project database , 2015 .
[83] Mario Vanhoucke,et al. Using activity sensitivity and network topology information to monitor project time performance , 2010 .
[84] Fereidoun Ghasemzadeh,et al. An integrated framework for project portfolio selection , 1999 .
[85] Mary Czerwinski,et al. A diary study of task switching and interruptions , 2004, CHI.
[86] Erik Demeulemeester,et al. Progress payments in project scheduling problems , 2003, Eur. J. Oper. Res..
[87] Willy Herroelen,et al. Computational experience with an optimal procedure for the scheduling of activities to maximize the net present value of projects , 1993 .
[88] D. Gong,et al. Time-uncertainty analysis in project networks with a new merge-event time-estimation technique , 1993 .
[89] Hanif D. Sherali,et al. A Dynamic Network Interdiction Problem , 2010, Informatica.
[90] Terry Williams,et al. How Do Organizations Learn Lessons From Projects—And Do They? , 2008, IEEE Transactions on Engineering Management.
[91] Mohsan Tanveer,et al. Agile for large scale projects — A hybrid approach , 2015, 2015 National Software Engineering Conference (NSEC).
[92] Daji Gong,et al. Calculation of safe float use in risk-analysis-oriented network scheduling , 1995 .
[93] Khaled A El-Rayes,et al. Fast and Accurate Risk Evaluation for Scheduling Large-Scale Construction Projects , 2011, J. Comput. Civ. Eng..
[94] Jane N. Hagstrom,et al. Computational complexity of PERT problems , 1988, Networks.
[95] Young Hoon Kwak,et al. History, Practices, and Future of Earned Value Management in Government: Perspectives from NASA , 2012 .
[96] Minghe Sun,et al. Robust optimization for interactive multiobjective programming with imprecise information applied to R&D project portfolio selection , 2014, Eur. J. Oper. Res..
[97] A. Wang. Comparison of Real Asset Valuation Models: A Literature Review , 2010 .
[98] Yeng-Horng Perng,et al. Potential benefits for collaborating formwork subcontractors based on co-operative game theory , 2005 .
[99] Rainer Kolisch,et al. PSPLIB - A project scheduling problem library: OR Software - ORSEP Operations Research Software Exchange Program , 1997 .
[100] Martin J. Eppler,et al. Harvesting project knowledge: a review of project learning methods and success factors , 2003 .
[101] Craig A. Nelson,et al. A scoring model for flexible manufacturing systems project selection , 1986 .
[102] Juanjo Noguera,et al. Multitasking on reconfigurable architectures: microarchitecture support and dynamic scheduling , 2004, TECS.
[103] Zvi Drezner,et al. A Multivariate Approach to Estimating the Completion Time for PERT Networks , 1986 .
[104] Gustavo Bergantiños,et al. How to Distribute Costs Associated with a Delayed Project , 2002, Ann. Oper. Res..
[105] Karen Ayas,et al. Integrating corporate learning with project management , 1997 .
[106] Richard C. Grinold,et al. The payment scheduling problem , 1972 .
[107] Ali H. Hassan,et al. Application of real options analysis for pharmaceutical R&D project valuation—Empirical results from a survey , 2006 .
[108] José Manuel Galán,et al. A new approach for project control under uncertainty. Going back to the basics , 2014 .
[109] Junguang Zhang,et al. Buffer sizing of critical chain based on attribute optimization , 2014, Concurr. Eng. Res. Appl..
[110] L L Lu,et al. Optimal project selection: Stochastic knapsack with finite time horizon , 1999, J. Oper. Res. Soc..
[111] Franco Caron,et al. A Bayesian Approach to Improve Estimate at Completion in Earned Value Management , 2013 .
[112] Barton Whaley. Toward a general theory of deception , 1982 .
[113] Bajis M. Dodin. Approximating the distribution functions in stochastic networks , 1985, Comput. Oper. Res..
[114] Bajis M. Dodin. Determining the K Most Critical Paths in PERT Networks , 1984, Oper. Res..
[115] Nan Ren,et al. Work Breakdown and Service Access in Cloud Manufacturing Environment based on Knowledge Sharing , 2013 .
[116] James E. Kelley,et al. Critical-path planning and scheduling , 1899, IRE-AIEE-ACM '59 (Eastern).
[117] A. W. Wortham,et al. A Statistical Theory for PERT Critical Path Analysis , 1966 .
[118] Vito Fragnelli,et al. Two Approaches to the Problem of Sharing Delay Costs in Joint Projects , 2002, Ann. Oper. Res..
[119] K. Lai,et al. An integrated real options evaluating model for information technology projects under multiple risks , 2009 .
[120] Jianchao Han,et al. A hybrid model for IT project with Scrum , 2011, Proceedings of 2011 IEEE International Conference on Service Operations, Logistics and Informatics.
[121] Erik Demeulemeester,et al. Resource-constrained project scheduling: A survey of recent developments , 1998, Comput. Oper. Res..
[122] Christine Strauss,et al. A Stochastic Branch-and-Bound Approach to Activity Crashing in Project Management , 2000, INFORMS J. Comput..
[123] T. D. Klastorin,et al. An effective methodology for the stochastic project compression problem , 2007 .
[124] Norman R. Baker,et al. Economic Models for R and D Project Selection in the Presence of Project Interactions , 1984 .
[125] Rainer Kolisch,et al. Selection and Scheduling of Pharmaceutical Research Projects , 2006 .
[126] Luk N. Van Wassenhove,et al. Limits to Concurrency , 1999 .
[127] Daniel Kuhn,et al. Robust resource allocations in temporal networks , 2012, Math. Program..
[128] Salah E. Elmaghraby,et al. The scheduling of activities to maximize the net present value of projects , 1990 .
[129] Sanjay Ranka,et al. Energy-aware dynamic slack allocation for real-time multitasking systems , 2012, Sustain. Comput. Informatics Syst..
[130] J. March. Exploration and exploitation in organizational learning , 1991, STUDI ORGANIZZATIVI.
[131] Morton D. Davis,et al. The kernel of a cooperative game , 1965 .
[132] Ilaria Giannoccaro,et al. Supply chain cooperation in industrial districts: A simulation analysis , 2007, Eur. J. Oper. Res..
[133] Melvyn Sim,et al. The Price of Robustness , 2004, Oper. Res..
[134] Joseph G. Szmerekovsky. The Impact of Contractor Behavior on the Client's Payment-Scheduling Problem , 2005, Manag. Sci..
[135] A. Jaffe,et al. The energy paradox and the diffusion of conservation technology , 1994 .
[136] Igor Averbakh,et al. Nash equilibria in competitive project scheduling , 2010, Eur. J. Oper. Res..
[137] Edward G. Anderson,et al. Putting It Together: How to Succeed in Distributed Product Development , 2011 .
[138] Rainer Kolisch,et al. Characterization and generation of a general class of resource-constrained project scheduling problems , 1995 .
[139] Erik Demeulemeester,et al. Maximizing the net present value of a project with linear time-dependent cash flows , 2001 .
[140] R. A. Brown. Probabilistic models of project management with design implications , 1978, IEEE Transactions on Engineering Management.
[141] Tzvi Raz,et al. Effective Sizing and Content Definition of Work Packages , 1998 .
[142] Anand Paul,et al. On path correlation and PERT bias , 2008, Eur. J. Oper. Res..
[143] Timothy J. Sturgeon,et al. Modular production networks: a new American model of industrial organization , 2002 .
[144] Han Reichgelt,et al. Teaching project management: an experiential approach , 2007 .
[145] Gerald G. Brown,et al. Interdicting a Nuclear-Weapons Project , 2009, Oper. Res..
[146] Chien-Hung Liu,et al. A New Approach to Determine the Critical Path in Stochastic Activity Network , 2014, 2014 International Symposium on Computer, Consumer and Control.
[147] R. Myerson. Incentive Compatibility and the Bargaining Problem , 1979 .
[148] H. Raghav Rao,et al. Security protection design for deception and real system regimes: A model and analysis , 2010, Eur. J. Oper. Res..
[149] Bertrand Meyer,et al. Agile vs. Structured Distributed Software Development: A Case Study , 2012, ICGSE.
[150] Christoph H. Loch,et al. On Uncertainty, Ambiguity, and Complexity in Project Management , 2002, Manag. Sci..
[151] Steven Pender,et al. Managing incomplete knowledge: Why risk management is not sufficient , 2001 .
[152] Edieal J. Pinker,et al. Technical Note - Managing a Secret Project , 2013, Oper. Res..
[153] Edieal J. Pinker,et al. On the complexity of project scheduling to minimize exposed time , 2014, Eur. J. Oper. Res..
[154] Zinovy D. Radovilsky. A quantitative approach to estimate the size of the time buffer in the theory of constraints , 1998 .
[155] G. Pisano. Which kind of collaboration is right for you , 2009 .
[156] Karen Ayas,et al. Project-Based Learning: Building Communities of Reflective Practitioners , 2001 .
[157] Dirk Biskup,et al. A state-of-the-art review on scheduling with learning effects , 2008, Eur. J. Oper. Res..
[158] Erik Demeulemeester,et al. On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints , 2001, Manag. Sci..
[159] Sadie Shinkins. Using computers to teach project management , 1995 .
[160] Adrien Presley,et al. R&D project selection using the analytic network process , 2002, IEEE Trans. Engineering Management.
[161] A. R. Klingel,et al. Bias in Pert Project Completion Time Calculations for a Real Network , 1966 .
[162] Tao Yao,et al. An overlapping-based process model for managing schedule and cost risk in product development , 2012, Concurr. Eng. Res. Appl..
[163] David N. Ford,et al. Real options in infrastructure projects: theory, practice and prospects , 2012 .
[164] Daniel Gómez,et al. A project game for PERT networks , 2007, Oper. Res. Lett..
[165] Robert J. Aumann,et al. An Economic Index of Riskiness , 2008, Journal of Political Economy.
[166] Lawrence P. Leach,et al. Critical Chain Project Management Improves Project Performance , 1999 .
[167] Christer Carlsson,et al. A fuzzy approach to R&D project portfolio selection , 2007, Int. J. Approx. Reason..
[168] D. J. A. Welsh. Letter to the Editor-Errors Introduced by a PERT Assumption , 1965 .
[169] Erik Demeulemeester,et al. RanGen: A Random Network Generator for Activity-on-the-Node Networks , 2003, J. Sched..
[170] Maarit Laanti,et al. Characteristics and Principles of Scaled Agile , 2014, XP Workshops.
[171] Mario Vanhoucke,et al. Empirical Evaluation of Earned Value Management Forecasting Accuracy for Time and Cost , 2015 .
[172] Joyce Fortune,et al. Current practice in project management — an empirical study , 2002 .
[173] B. Yum,et al. An uncertainty importance measure of activities in PERT networks , 1997 .
[174] Dimitri Golenko-Ginzburg,et al. High performance heuristic algorithm for controlling stochastic network projects , 1998 .
[175] Rita Gunther McGrath,et al. Crafting R&D Project Portfolios , 2002 .
[176] R. A. Bowman. Stochastic gradient-based time-cost tradeoffs in PERT networks using simulation , 1994, Ann. Oper. Res..
[177] Melvyn Sim,et al. Managing Underperformance Risk in Project Portfolio Selection , 2015, Oper. Res..
[178] Melvyn Sim,et al. Satisficing Measures for Analysis of Risky Positions , 2009, Manag. Sci..
[179] Mordechai I. Henig,et al. Risk Criteria in a Stochastic Knapsack Problem , 1990, Oper. Res..
[180] Robin S. Poston,et al. Designing an Academic Project Management Program: A Collaboration Between a University and a PMI Chapter , 2011, J. Inf. Syst. Educ..
[181] D. Sculli,et al. An approximate solution to the pert problem , 1991 .
[182] Fasheng Qiu,et al. The value of management flexibility—a real option approach to investment evaluation , 2003 .
[183] Christoph H. Loch,et al. Special Issue on Design and Development: Project Management Under Risk: Using the Real Options Approach to Evaluate Flexibility in R...D , 2001, Manag. Sci..
[184] Daniel A. Levinthal,et al. What Is Not A Real Option: Considering Boundaries for the Application of Real Options to Business Strategy , 2004 .
[185] Mario Vanhoucke,et al. An Overview of Project Data for Integrated Project Management and Control , 2016 .
[186] George Mangalaraj,et al. Challenges of migrating to agile methodologies , 2005, CACM.
[187] Laurie A. Williams,et al. Agile software development: it's about feedback and change , 2003, Computer.
[188] Nuno Gil,et al. The Effects of Schedule-driven Project Management in Multi-project Environments. , 2012 .
[189] S. Alireza Hashemi Golpayegani,et al. Designing work breakdown structures using modular neural networks , 2007, Decis. Support Syst..
[190] Bajis M. Dodin,et al. Approximating the Criticality Indices of the Activities in PERT Networks , 1985 .
[191] Andrew J. Sense,et al. Structuring the project environment for learning , 2007 .
[192] A. H. Russell. Cash Flows in Networks , 1970 .
[193] Cheryl Gaimon,et al. Managing Knowledge-Based Resource Capabilities Under Uncertainty , 2004, Manag. Sci..
[194] Xiaobo Li,et al. Distributionally Robust Mixed Integer Linear Programs: Persistency Models with Applications , 2013, Eur. J. Oper. Res..
[195] Ken Power,et al. A Model for Understanding When Scaling Agile Is Appropriate in Large Organizations , 2014, XP Workshops.
[196] Adolfo López-Paredes,et al. An extension of the EVM analysis for project monitoring: The Cost Control Index and the Schedule Control Index , 2011 .
[197] Robert G. Beaves,et al. The Case for a Generalized Net Present Value Formula , 1993 .
[198] D. Schmeidler. The Nucleolus of a Characteristic Function Game , 1969 .
[199] Mladen A. Vouk,et al. Defensive computer-security deception operations: processes, principles and techniques , 2006 .
[200] Lei Zhu. A simulation based real options approach for the investment evaluation of nuclear power , 2012, Comput. Ind. Eng..
[201] Jae-Ho Hyun,et al. Buyer-supplier relations in the European automobile component industry , 1994 .
[202] S. Rajagopalan,et al. Process Improvement, Quality, and Learning Effects , 1998 .
[203] R. Cooper,et al. New Problems, New Solutions: Making Portfolio Management More Effective , 2000 .
[204] Dimitri Golenko-Ginzburg,et al. Stochastic network project scheduling with non-consumable limited resources , 1997 .
[205] Terry Williams. Criticality in Stochastic Networks , 1992 .
[206] Mike Danilovic,et al. Bring your suppliers into your projects—Managing the design of work packages in product development , 2006 .
[207] Stephen C. Y. Lu,et al. Toward the Integration of Traditional and Agile Approaches , 2013, ArXiv.
[208] Stephen M. Hess,et al. Prioritizing Project Selection , 2009 .
[209] Weng-Ming Chu,et al. A new approximation algorithm for obtaining the probability distribution function for project completion time , 2007, Comput. Math. Appl..
[210] Torgeir Dingsøyr,et al. Towards Principles of Large-Scale Agile Development - A Summary of the Workshop at XP2014 and a Revised Research Agenda , 2014, XP Workshops.
[211] T. Raz,et al. A Critical Look at Critical Chain Project Management , 2003, IEEE Engineering Management Review.