ECONOMIC PRODUCTION QUANTITY IN REWORKABLE PRODUCTION SYSTEMS WITH INSPECTION ERRORS, SCRAPS AND BACKLOGGING
暂无分享,去创建一个
S Shadrokh | R Shamsi | A Haji | F Nourbakhsh
[1] Bhaba R. Sarker,et al. Optimal manufacturing batch size with rework process at a single-stage production system , 2004, Comput. Ind. Eng..
[2] Xin Zhang,et al. Joint lot sizing and inspection policy in an EOQ model with random yield , 1990 .
[3] Steven Nahmias,et al. Production and operations analysis -4/E , 2005 .
[4] M. K. Salameh,et al. Economic production quantity model for items with imperfect quality , 2000 .
[5] Steven Nahmias,et al. Production and operations analysis , 1992 .
[6] Paul H. Zipkin,et al. Foundations of Inventory Management , 2000 .
[7] Ronald L. Rardin,et al. Optimization in operations research , 1997 .
[8] Meir J. Rosenblatt,et al. Economic Production Cycles with Imperfect Production Processes , 1986 .
[9] L. Cárdenas-Barrón,et al. Note on: Economic production quantity model for items with imperfect quality – a practical approach , 2002 .
[10] Alireza Haji,et al. The effect of inspection errors on the optimal batch size in reworkable production systems with scraps , 2010 .