Abstract Cuttings transport becomes critical important when horizontal directional drilling (HDD) technology has been used more often in long distance and large diameter oil and gas pipeline construction in rocks. Front reaming (FR) and one way drilling mud return (OWDMR) were not new in oil and gas well drilling, but they were rarely used in HDD industry compared to the traditional back reaming (BR) and two way drilling mud return (TWDMR). FR and OWDMR technologies, when they were used in HDD, were designed mainly for highly non-leveled HDD projects to overcome some difficulties such as the recycling of drilling mud. Along with these technologies is that the cuttings need to travel longer distance to the ground surface. In addition, the effect of the drill rod rotation on the cuttings transport does not exist because hole bottom mud motor is usually used in FR. To find a solution for this problem, the cuttings transport mechanism was analyzed based on the drilling mud hydraulics, and then, an equation of cuttings transport distance was derived. It found that the average drilling mud velocity in the annulus and the consistency index of drilling mud are the two most important factors related to the cuttings transport distance. To help with the cuttings transport, a new MMH drilling mud system, which provides a high consistency index and a low flow index, was used in rock HDD projects, instead of the common Bentonite-water drilling mud system.

[1]  Arild Saasen,et al.  Critical Fluid Velocities for Removing Cuttings Bed Inside Horizontal and Deviated Wells , 2010 .

[2]  Baosong Ma,et al.  The return of drilling fluid in large diameter horizontal directional drilling boreholes , 2016 .

[4]  Desmond Nguyen,et al.  A Three-Layer Hydraulic Program for Effective Cuttings Transport and Hole Cleaning in Highly Deviated and Horizontal Wells , 1998 .

[5]  J. J. Azar,et al.  Correlations of mud rheological properties with cuttings-transport performance in directional drilling , 1991 .

[6]  Keith K. Millheim,et al.  Applied Drilling Engineering , 1986 .

[7]  Mohammad Najafi,et al.  Maxi-HDD Pull Loads for Nonlevel Grade for Polyethylene Pipe , 2011 .

[8]  J. J. Azar,et al.  The Effects of Mud Rheology on Annular Hole Cleaning in Directional Wells , 1986 .

[9]  Biao Shu,et al.  Prediction of rotational torque and design of reaming program using horizontal directional drilling in rock strata , 2011 .

[10]  Biao Shu,et al.  Preparation and recycling of drilling mud in large scale Horizontal Directional Drilling projects in Mainland China , 2011 .

[11]  Biao Shu,et al.  Study of ground collapse induced by large-diameter horizontal directional drilling in a sand layer using numerical modeling , 2015 .

[12]  R. Sterling,et al.  Stability analysis of a borehole wall during horizontal directional drilling , 2007 .

[13]  Samuel T. Ariaratnam,et al.  Modeling of annular fluid pressures in horizontal boring , 2007 .

[14]  Preston L. Moore,et al.  Drilling Practices Manual , 1974 .

[15]  Baosong Ma,et al.  Analysis of formation fracturing for the Maxi-HDD Qin River crossing project in China , 2016 .