Risk-Constrained Generation Asset Arbitrage in Power Systems

A competitive generating company (GENCO) can maximize its payoff by optimizing its generation assets. This paper considers the GENCO's arbitrage problem using stochastic price-based unit commitment while considering the associated risks. The GENCO may consider arbitrage opportunities in purchases from qualifying facilities (QFs) as well as simultaneous trades with spot markets for energy, ancillary services, fuel, and emission allowance. The tradeoff between maximizing expected payoffs and minimizing risks due to market price uncertainties is modeled explicitly by including the expected downside risk as a constraint. The downside risk is defined as the unfulfilled profit. The Monte Carlo simulation is applied to generate scenarios, and scenario reduction techniques are applied to reduce the number of scenarios while maintaining a good approximation of the exact solution. The proposed case studies illustrate the significance of arbitrage in multi-commodity markets and the importance of considering the uncertainty of market prices.

[1]  Linus Schrage,et al.  OR Practice - A Scenario Approach to Capacity Planning , 1989, Oper. Res..

[2]  J. Dupacová,et al.  Scenario reduction in stochastic programming: An approach using probability metrics , 2000 .

[3]  Jitka Dupacová,et al.  Scenarios for Multistage Stochastic Programs , 2000, Ann. Oper. Res..

[4]  Samer Takriti,et al.  Incorporating Fuel Constraints and Electricity Spot Prices into the Stochastic Unit Commitment Problem , 2000, Oper. Res..

[5]  Stein W. Wallace,et al.  Generating Scenario Trees for Multistage Decision Problems , 2001, Manag. Sci..

[6]  A. Tomasgard,et al.  Power generation planning and risk management in a liberalised market , 2001, 2001 IEEE Porto Power Tech Proceedings (Cat. No.01EX502).

[7]  Mohammad Shahidehpour,et al.  Market operations in electric power systems , 2002 .

[8]  S. Stoft Power System Economics: Designing Markets for Electricity , 2002 .

[9]  W. Ziemba,et al.  Hedging electricity portfolios via stochastic programming , 2002 .

[10]  Stein-Erik Fleten,et al.  Constructing forward price curves in electricity markets , 2003 .

[11]  N. Growe-Kuska,et al.  Scenario reduction and scenario tree construction for power management problems , 2003, 2003 IEEE Bologna Power Tech Conference Proceedings,.

[12]  R. Masiello,et al.  Managing market risk in energy , 2003 .

[13]  Chen-Ching Liu,et al.  Risk assessment in energy trading , 2003 .

[14]  Shabbir Ahmed,et al.  Mean-risk objectives in stochastic programming , 2004 .

[15]  M. Ventosa,et al.  Optimal offering strategies for generation companies operating in electricity spot markets , 2004, IEEE Transactions on Power Systems.

[16]  Mika Goto,et al.  Understanding Electricity Price Volatility within and Across Markets , 2004 .

[17]  A. Conejo,et al.  Multimarket optimal bidding for a power producer , 2005, IEEE Transactions on Power Systems.

[18]  M. Shahidehpour,et al.  Optimal Generation Asset Arbitrage In Electricity Markets , 2005 .

[19]  S. Granville,et al.  Strategic bidding under uncertainty: a binary expansion approach , 2005, IEEE Transactions on Power Systems.

[20]  M. Shahidehpour,et al.  Price-based unit commitment: a case of Lagrangian relaxation versus mixed integer programming , 2005, IEEE Transactions on Power Systems.

[21]  Zuyi Li,et al.  Risk-Constrained Bidding Strategy With Stochastic Unit Commitment , 2007, IEEE Transactions on Power Systems.