Simulation of wide area measurement system with optimal phasor measurement unit location

Traditional supervisory control and data acquisition (SCADA) measurements have been providing information regarding different power system parameters for decades. These measurements are typically taken once every 4 to 10 seconds offering a steady state view of the power system behaviour. However, for monitoring and control of large grid only steady state information may not be sufficient. Phasor measurement units (PMUs) provide dynamic view of the grid. Since PMUs are costly device, optimal placement of PMUs is a thrust areas of research in power system planning. This has been already investigated in previous research findings by different optimization technique. This paper extensively corroborates a simulation model of a wide area network with optimal PMU location. The purpose is to experimentally determine the ability of PMU to observe the entire network from its optimal location. The proposed methodology is implemented and investigated on IEEE six bus system using MATLAB/Simulink.

[1]  A.G. Phadke,et al.  Phasor measurement unit placement techniques for complete and incomplete observability , 2005, IEEE Transactions on Power Delivery.

[2]  T. Baldwin,et al.  Power system observability with minimal phasor measurement placement , 1993 .

[3]  Pathirikkat Gopakumar,et al.  Optimal placement of PMUs for the smart grid implementation in Indian power grid—A case study , 2013 .

[4]  E. Kyriakides,et al.  Optimal Placement of Phasor Measurement Units for Power System Observability , 2008, IEEE Transactions on Power Systems.

[5]  Jianhui Wang,et al.  Smart Transmission Grid: Vision and Framework , 2010, IEEE Transactions on Smart Grid.

[6]  Fangxing Li,et al.  Next-Generation Monitoring, Analysis, and Control for the Future Smart Control Center , 2010, IEEE Transactions on Smart Grid.

[7]  Osama A. Mohammed,et al.  Development of a Wide Area Measurement System for Smart Grid Applications , 2011 .

[8]  James Ross Altman,et al.  A Practical Comprehensive Approach to PMU Placement for Full Observability , 2008 .

[9]  Mohammed Eissa Moustafa,et al.  A Novel Wide Area Protection Classification Technique for Interconnected Power Grids Based on MATLAB Simulation , 2011 .

[10]  A. Abur,et al.  Observability analysis and measurement placement for systems with PMUs , 2004, IEEE PES Power Systems Conference and Exposition, 2004..

[11]  Dusmanta Kumar Mohanta,et al.  Communication Feasibility Analysis for Smart Grid With Phasor Measurement Units , 2013, IEEE Transactions on Industrial Informatics.

[12]  M. Fotuhi-Firuzabad,et al.  Optimal Placement of Phasor Measurement Units Using Immunity Genetic Algorithm , 2009, IEEE Transactions on Power Delivery.