RESEARCH ON OPERATIONAL RELIABILITY FOR HIGH VOLTAGE TRIGGERING SWITCH TUBE

High voltage triggering switch tube is the key component of pulse power device,which has two failure modes:triggering failure and self breakdown Operation of pulse power device would be seriously affected without solving these problems Approaches to solve the failures are introduced to improve the operational reliability of high voltage triggering switch tube in this paper