Comparative Study of Heuristics Algorithms in Solving Flexible Job Shop Scheduling Problem with Condition Based Maintenance

Purpose: This paper focuses on a classic optimization problem in operations research, the flexible job shop scheduling problem (FJSP), to discuss the method to deal with uncertainty in a manufacturing system. Design/methodology/approach: In this paper, condition based maintenance (CBM), a kind of preventive maintenance, is suggested to reduce unavailability of machines. Different to the simultaneous scheduling algorithm (SSA) used in the previous article (Neale & Cameron,1979), an inserting algorithm (IA) is applied, in which firstly a pre-schedule is obtained through heuristic algorithm and then maintenance tasks are inserted into the pre-schedule scheme. Findings: It is encouraging that a new better solution for an instance in benchmark of FJSP is obtained in this research. Moreover, factually SSA used in literature for solving normal FJSPPM (FJSP with PM) is not suitable for the dynamic FJSPPM. Through application in the benchmark of normal FJSPPM, it is found that although IA obtains inferior results compared to SSA used in literature, it performs much better in executing speed. Originality/value: Different to traditional scheduling of FJSP, uncertainty of machines is taken into account, which increases the complexity of the problem. An inserting algorithm (IA) is proposed to solve the dynamic scheduling problem. It is stated that the quality of the final result depends much on the quality of the pre-schedule obtained during the procedure of solving a normal FJSP. In order to find the best solution of FJSP, a comparative study of three heuristics is carried out, the integrated GA, ACO and ABC. In the comparative study, we find that GA performs best in the three heuristic algorithms. Meanwhile, a new better solution for an instance in benchmark of FJSP is obtained in this research.

[1]  C.-H. Lin,et al.  Minimizing makespan for two parallel machines with job limit on each availability interval , 2007, J. Oper. Res. Soc..

[2]  Sanjay B. Joshi,et al.  A genetic algorithm for job shop scheduling problems with alternate routing , 1998, SMC'98 Conference Proceedings. 1998 IEEE International Conference on Systems, Man, and Cybernetics (Cat. No.98CH36218).

[3]  Mitsuo Gen,et al.  Scheduling jobs and maintenances in flexible job shop with a hybrid genetic algorithm , 2006, J. Intell. Manuf..

[4]  Cheng Wang,et al.  Integrated production planning and control: a multi-objective optimization model , 2013 .

[5]  Mostafa Zandieh,et al.  Bi-objective optimization research on integrated fixed time interval preventive maintenance and production for scheduling flexible job-shop problem , 2011, Expert Syst. Appl..

[6]  Lionel Amodeo,et al.  Bi-Objective Ant Colony Optimization approach to optimize production and maintenance scheduling , 2010, Comput. Oper. Res..

[7]  Shengyao Wang,et al.  An effective artificial bee colony algorithm for the flexible job-shop scheduling problem , 2012 .

[8]  Christoph S. Thomalla Job shop scheduling with alternative process plans , 2001 .

[9]  Pierre Borne,et al.  Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems , 2002, IEEE Trans. Syst. Man Cybern. Part C.

[10]  Zhiming Wu,et al.  An effective hybrid optimization approach for multi-objective flexible job-shop scheduling problems , 2005, Comput. Ind. Eng..

[11]  Deming Lei,et al.  Fuzzy job shop scheduling problem with availability constraints , 2010, Comput. Ind. Eng..

[12]  Elsayed A. Elsayed,et al.  Job shop scheduling with alternative machines , 1990 .

[13]  Yahong Zheng,et al.  Supply chain management under availability & uncertainty constraints , 2012 .

[14]  N.M. Najid,et al.  A modified simulated annealing method for flexible job shop scheduling problem , 2002, IEEE International Conference on Systems, Man and Cybernetics.

[15]  Jianbo Yu,et al.  An effective heuristic for flexible job-shop scheduling problem with maintenance activities , 2010, Comput. Ind. Eng..

[16]  R. V. Williams,et al.  A guide to the condition monitoring of machinery , 1980 .

[17]  Ravi Sethi,et al.  The Complexity of Flowshop and Jobshop Scheduling , 1976, Math. Oper. Res..