When does decentralized production of biogas and centralized upgrading and injection into the natural gas grid make sense
暂无分享,去创建一个
Antonius Broekhuis | W.J.T. van Gemert | J. Bekkering | E. J. Hengeveld | W. V. Gemert | A. Broekhuis | Jan Bekkering | E. Hengeveld | W. J. Gemert
[1] J. Bekkering,et al. Operational modeling of a sustainable gas supply chain , 2010 .
[2] M. Meuwissen,et al. Economic analysis of anaerobic digestion—A case of Green power biogas plant in The Netherlands , 2010 .
[3] Kay J. Damen. Reforming fossil fuel use : the merits, costs and risks of carbon dioxide capture and storage , 2007 .
[4] B. Jenkins. A comment on the optimal sizing of a biomass utilization facility under constant and variable cost scaling , 1997 .
[5] M. Berglund,et al. Assessment of energy performance in the life-cycle of biogas production , 2006 .
[6] J. Bekkering,et al. Optimisation of a green gas supply chain--a review. , 2010, Bioresource technology.
[7] R. Overend. The average haul distance and transportation work factors for biomass delivered to a central plant , 1982 .
[8] S. Ward,et al. Prospects for expanded utilization of biogas in Germany , 2010 .
[9] Martin Miltner,et al. Membrane biogas upgrading processes for the production of natural gas substitute , 2010 .
[10] T. D. Weidenaar,et al. Dutch gas distribution grid goes green: decision support tool for local biogas utilization , 2011 .
[11] Shane Ward,et al. Evaluation of energy efficiency of various biogas production and utilization pathways , 2010 .