An ant colony system based decision support system for construction time-cost optimization
暂无分享,去创建一个
[1] Ali Kaveh,et al. Nondominated Archiving Multicolony Ant Algorithm in Time-Cost Trade-Off Optimization , 2009 .
[2] Luca Maria Gambardella,et al. Ant Algorithms for Discrete Optimization , 1999, Artificial Life.
[3] S. Thomas Ng,et al. Stochastic Time–Cost Optimization Model Incorporating Fuzzy Sets Theory and Nonreplaceable Front , 2005 .
[4] Hua Ke,et al. Optimization models and a GA-based algorithm for stochastic time-cost trade-off problem , 2009, Appl. Math. Comput..
[5] Hong Zhang,et al. Multi‐objective particle swarm optimization for construction time‐cost tradeoff problems , 2010 .
[6] S. Thomas Ng,et al. Optimizing Construction Time and Cost Using Ant Colony Optimization Approach , 2008 .
[7] Ka Chi Lam,et al. A conceptual case-based decision model for mitigating construction delays , 2000 .
[8] Donald E. Grierson,et al. Comparison among five evolutionary-based optimization algorithms , 2005, Adv. Eng. Informatics.
[9] Mohan M. Kumaraswamy,et al. Applying Pareto Ranking and Niche Formation to Genetic Algorithm-Based Multiobjective Time–Cost Optimization , 2005 .
[10] Edmundas Kazimieras Zavadskas,et al. Risk assessment of construction projects , 2010 .
[11] Zong Woo Geem,et al. Multiobjective Optimization of Time-Cost Trade-Off Using Harmony Search , 2010 .
[12] Marco Dorigo,et al. Distributed Optimization by Ant Colonies , 1992 .
[13] Hong Zhang,et al. Fuzzy-multi-objective particle swarm optimization for time―cost―quality tradeoff in construction , 2010 .
[14] Mohan M. Kumaraswamy,et al. Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization , 2004 .
[15] Chung-Wei Feng,et al. Using genetic algorithms to solve construction time-cost trade-off problems , 1997 .
[16] Peter E.D. Love,et al. Using improved genetic algorithms to facilitate time-cost optimization , 1997 .
[17] Zhuofu Wang,et al. Memetic Algorithm for Solving Construction Time-Cost Optimization , 2009, 2009 International Conference on Management and Service Science.
[18] Chung-Wei Feng,et al. Construction Time-Cost Trade-Off Analysis Using LP/IP Hybrid Method , 1995 .
[19] Oleg Kapliński,et al. Three phases of multifactor modelling of construction processes , 2006 .
[20] Yonggui Wang,et al. Knowledge Complexity, Learning Capability and Joint Venture Instability , 2009, 2009 International Conference on Management and Service Science.
[21] Mitsuo Gen,et al. Genetic algorithms and engineering optimization , 1999 .