Formalisation and use of competencies for industrial performance optimisation: A survey
暂无分享,去创建一个
[1] Heinz-Hermann Erbe. Learning for an Agile Manufacturing , 2003, APMS.
[2] Philippe Zarifian,et al. Le modèle de la compétence. Trajectoire historique, enjeux actuels et propositions , 2001 .
[3] X. Cai,et al. A genetic algorithm for scheduling staff of mixed skills under multi-criteria , 2000, Eur. J. Oper. Res..
[4] Giuseppe Berio,et al. Analysis and modeling of individual competencies: toward better management of human resources , 2006, IEEE Transactions on Systems, Man, and Cybernetics - Part A: Systems and Humans.
[5] G.A. Sazonova,et al. Management of technological changes and innovations as a core competence , 2004, 2004 IEEE International Engineering Management Conference (IEEE Cat. No.04CH37574).
[6] Donald J. Bowersox,et al. HOW TO MASTER CROSS-ENTERPRISE COLLABORATION , 2003 .
[7] Patrick Burlat,et al. Methodology to Analyze Organizational Trajectories of Smes Network , 2004 .
[8] Hamideh Afsarmanesh,et al. Further Developments in Virtual Enterprises , 1999, PRO-VE.
[9] Therani Madhusudan,et al. An agent-based approach for coordinating product design workflows , 2005, Comput. Ind..
[10] Kurt M. Bretthauer,et al. Real-time schedule adjustment decisions: a case study , 2003 .
[11] Ludwig Bstieler,et al. The Moderating Effect of Environmental Uncertainty on New Product Development and Time Efficiency , 2005 .
[12] Steven C. Michael,et al. Organizational Learning and New Product Introductions , 2004 .
[13] J. Kidd. Management Teams: Why They Succeed or Fail , 1982 .
[14] J. K. Cochran,et al. Optimal staffing for cyclically scheduled processes , 1997 .
[15] Jonathan F. Bard. Selecting the appropriate input data set when configuring a permanent workforce , 2004, Comput. Ind. Eng..
[16] Blanche Segrestin,et al. The role of design regimes in the coordination of competencies and the conditions for inter-firm cooperation , 2002 .
[17] Li Lin,et al. Modeling team member characteristics for the formation of a multifunctional team in concurrent engineering , 2004, IEEE Transactions on Engineering Management.
[18] Gur Mosheiov,et al. Scheduling problems with a learning effect , 2001, Eur. J. Oper. Res..
[19] Roelof J. van den Berg,et al. Supporting Partner Selection for Virtual Enterprises , 2000, DIISM.
[20] Andrew Lim,et al. Nurse rostering problems - a bibliographic survey , 2003, Eur. J. Oper. Res..
[21] Tianqiang Jia,et al. Vers une meilleure gestion des ressources d'un groupe autonome de fabrication , 1998 .
[22] Patrick Burlat,et al. Vers l'intégration des compétences dans le pilotage des performances de l'entreprise , 2002 .
[23] Siegfried P. Gudergan,et al. Resource-based view of the firm , 2008 .
[24] Andreas T. Ernst,et al. Staff scheduling and rostering: A review of applications, methods and models , 2004, Eur. J. Oper. Res..
[25] Patrick Pujo,et al. Fondements du Pilotage des Systèmes de Production , 2001 .
[26] Lucien Vincent,et al. A framework for organization network engineering and integration , 2005 .
[27] Patrick Burlat. GRECOPME II : GRoupements d'Entreprises COopérantes, Potentialités, Moyens, Evolutions , 2001 .
[28] S. Peillon,et al. Le pilotage des coopérations interentreprises : le cas des groupements de PME , 2001 .
[29] David A. Nembhard,et al. Task complexity effects on between-individual learning/forgetting variability , 2002 .
[30] Qingyu Zhang,et al. Manufacturing flexibility: Defining and analyzing relationships among competence, capability, and customer satisfaction , 2003 .
[31] Onur Behzat Tokdemir,et al. Effect of learning on line-of-balance scheduling , 2001 .
[32] Ying Zhu,et al. General issues on multi-agent system supporting the decisions in collaborative design , 2002, IEEE International Conference on Systems, Man and Cybernetics.
[33] Weiming Shen,et al. Editorial of the special issue on knowledge sharing in collaborative design environments , 2003, Comput. Ind..
[34] Gregory P. White. A meta‐analysis model of manufacturing capabilities , 1996 .
[35] Giovanni Miragliotta,et al. Complexity management and supply chain performance assessment. A field study and a conceptual framework , 2004 .
[36] L. Rajczi,et al. A portfolio approach to managing technological innovations , 1991, Technology Management : the New International Language.
[37] Gu Bei. On the Life Cycle of Enterprise , 2000 .
[38] Ahmed Al-Ashaab,et al. Knowledge web-based system architecture for collaborative product development , 2005, Comput. Ind..
[39] Bernard Grabot,et al. Short-term manpower management in manufacturing systems: new requirements and DSS prototyping , 2000 .
[40] Jan Van Damme,et al. Project scheduling under uncertainty survey and research potentials , 2002 .
[41] Paul M. Bobrowski,et al. An evaluation of labor assignment rules when workers are not perfectly interchangeable , 1993 .
[42] Vicky Manthou,et al. Virtual e-Chain (VeC) model for supply chain collaboration , 2004 .
[43] Valentina Plekhanova,et al. Partner Evaluation And Selection In Virtual Enterprises Using A Profile Theory Based Approach , 2003, PRO-VE.
[44] K. Dawson,et al. Core competency management in R&D organizations , 1991, Technology Management : the New International Language.
[45] J. Osterlund. Competence management by informatics in R&D: the corporate level , 1997 .
[46] Patrick Burlat,et al. Evaluating orders allocation within networks of firms , 2003 .
[47] Yves Pigneur,et al. Digital trade of human competencies , 1999, Proceedings of the 32nd Annual Hawaii International Conference on Systems Sciences. 1999. HICSS-32. Abstracts and CD-ROM of Full Papers.
[48] Jens Rasmussen,et al. Skills, rules, and knowledge; signals, signs, and symbols, and other distinctions in human performance models , 1983, IEEE Transactions on Systems, Man, and Cybernetics.
[49] Mounira Harzallah,et al. Modélisation des aspects organisationnels et des compétences pour la réorganisation d'entreprises industrielles , 2000 .
[50] Timothy J. Wilkinson,et al. Strategic alliances: Choose your partners , 1995 .
[51] F. J. Lloréns,et al. Flexibility of manufacturing systems, strategic change and performance , 2005 .
[52] M. Lewis. Success, failure and organisational competence:a case study of the new product development process , 2001 .
[53] Margarida Moz,et al. A genetic algorithm approach to a nurse rerostering problem , 2007, Comput. Oper. Res..
[54] Norbert Lartigu,et al. Knowledge and design , 2003 .
[55] Susan L. Kichuk,et al. The big five personality factors and team performance: implications for selecting successful product design teams , 1997 .
[56] Henry C. W. Lau,et al. Multi-agent modeling of dispersed manufacturing networks , 1999 .
[57] Maximilian von Zedtwitz,et al. Post-project reviews in R&D , 2003 .
[58] G. O'Connor,et al. Managing radical innovation: an overview of emergent strategy issues , 2002 .
[59] Gert Zülch,et al. Shaping the organization of order processing with the simulation tool FEMOS , 1996 .
[60] Gert Zülch,et al. Integrating Human Aspects in Production Management - IFIP TC5 / WG5.7 Proceedings of the International Conference on Human Aspects in Production Management 5-9 October 2003, Karlsruhe, Germany , 2005, APMS.
[61] Axel Tuma,et al. Configuration and coordination of virtual production networks , 1998 .
[62] Li Lin,et al. Decomposition of interdependent task group for concurrent engineering , 2003 .
[63] B. Grabot,et al. Fuzzy Logic in Team Design , 1995 .
[64] John W. Medcof,et al. Why too many alliances end in divorce , 1997 .
[65] Orsolya Szegheo,et al. Extended Enterprise Engineering—A Model-Based Framework , 2000, Concurr. Eng. Res. Appl..
[66] R. Narasimhan,et al. Exploring flexibility and execution competencies of manufacturing firms , 2004 .
[67] Luis M. Camarinha-Matos. New Collaborative Organizations And Their Research Needs , 2003, PRO-VE.
[68] Hendrik Jähn,et al. Optimizing the selection of partners in production networks , 2004 .
[69] Jonathan Trower,et al. A study of the impact of individual goals and team composition variables on team performance , 1996, Special Interest Group on Computer Personnel Research Annual Conference.
[70] Cheng Wu,et al. Ontology for modeling and analyzing of enterprise competence , 2001, 2001 IEEE International Conference on Systems, Man and Cybernetics. e-Systems and e-Man for Cybernetics in Cyberspace (Cat.No.01CH37236).
[71] D. DeCarolis,et al. Competencies and Imitability in the Pharmaceutical Industry: An Analysis of Their Relationship with Firm Performance , 2003 .
[72] Konstantin Kogan,et al. Dynamic approach to human resources planning for major professional companies with a peak-wise demand , 2003 .
[73] Natalia Juristo Juzgado,et al. Assigning people to roles in software projects , 2004, Softw. Pract. Exp..
[74] Margaret F. Shipley,et al. Utilizing fuzzy compatibility of skill sets for team selection in multi-phase projects , 2002 .
[75] M. Torkkeli,et al. The contribution of technology selection to core competencies , 2002 .
[76] Sobah Abbas Petersen. An Agent-based Approach to Support the Formation of Virtual Enterprises , 2003 .
[77] Thomas Yew Sing Lee. The effect of workers with different capabilities on customer delay , 2004, Comput. Oper. Res..
[78] Caron H. St. John,et al. Environmental Uncertainty and Product-Process Life Cycles: A Multi-level Interpretation of Change Over Time , 2003 .
[79] Wayne L. Winston,et al. Introduction to mathematical programming , 1991 .
[80] J. Bard,et al. A column generation-based approach to solve the preference scheduling problem for nurses with downgrading , 2005 .
[81] Joaquim Júdice,et al. Workforce planning in a lotsizing mail processing problem , 2005, Comput. Oper. Res..
[82] Catherine Lackenby,et al. A Dynamic Model of Virtual Organisations: Formation and Development , 2002, PRO-VE.
[83] Emmanuel Caillaud,et al. Workload control of human resources to improve production management , 2001 .
[84] Henk Sol,et al. Proceedings of the ACM SIGCPR Conference , 1995 .
[85] Duncan Sanderson,et al. Coordinating joint design work: the role of communication and artefacts , 1998 .
[86] Jonathan F. Bard,et al. Staff scheduling at the United States Postal Service , 2003, Comput. Oper. Res..
[87] Xavier Boucher,et al. Coordination of Competencies Development within Networks of SMEs , 2005, PRO-VE.
[88] Herbert Moskowitz,et al. Human resource selection for software development projects using Taguchi's parameter design , 2003, Eur. J. Oper. Res..
[89] Steven T. Walsh,et al. The measurement of technical competencies , 2002 .
[90] J. Lillieskold,et al. Project management competence requirements when procuring complex systems , 2002, IEEE International Engineering Management Conference.
[91] James Sommerville,et al. Project teambuilding—the applicability of Belbin's team-role self-perception inventory , 1998 .
[92] Hamideh Afsarmanesh,et al. Processes and Foundations for Virtual Organizations, IFIP TC5/WG5.5 Fourth Working Conference on Virtual Enterprises (PRO-VE'03), October 29-31, 2003, Lugano, Switzerland , 2013, PRO-VE.
[93] Jean-François Boujut,et al. A co-operation framework for product–process integration in engineering design , 2002 .
[94] Sheldon R. Smith,et al. Delivery capability and firm performance in international operations , 1997 .
[95] Chang-Ho Lee,et al. Overview of entity-based integrated design product and process models , 1998 .
[96] Abderrahman El Mhamedi. Sur l'intégration des aspects humains dans la conduite multi-niveaux d'ateliers de production , 1990 .
[97] Christine Covès,et al. Analyse et estimation des performances de processus d'entreprise , 2000 .
[98] Hamideh Afsarmanesh,et al. Infrastructures for Virtual Enterprises: Networking Industrial Enterprises, IFIP TC5 WG5.3 / PRODNET Working Conference on Infrastructures for Virtual Enterprises (PRO-VE '99), October 27-28, 1999, Porto, Portugal , 1999, Working Conference on Virtual Enterprises.
[99] ARMEN Zzkarian,et al. Forming teams: an analytical approach , 1999 .
[100] Patrick Burlat,et al. Constructing a typology for networks of firms , 2003 .
[101] Andrew Kusiak,et al. Concurrent design: decomposition of design activities , 1990, [1990] Proceedings. Rensselaer's Second International Conference on Computer Integrated Manufacturing.
[102] John A. Buzacott,et al. The impact of worker differences on production system output , 2002 .
[103] Tobias Teich,et al. Automated negotiations of supply contracts for flexible production networks , 2004 .
[104] Wanda J. Orlikowski,et al. Knowing in practice: Enacting a collective capability in distributed organizing , 2002, STUDI ORGANIZZATIVI.
[105] B. Wernerfelt,et al. A Resource-Based View of the Firm , 1984 .
[106] Michael Dietzsch,et al. Information based, dynamic quality information system for non-hierarchic regional production networks , 2004 .
[107] Martin G. Helander,et al. Effect of operator competence on assessment of quality control in manufacturing , 1997 .
[108] Lionel Franchini. Aide à la décision pour la gestion des opérateurs en production : modélisation, planification et évaluation , 2000 .
[109] Eric Bonjour,et al. Models to Split Up and to Integrate Competencies Systems in Design Activities Management , 2004 .
[110] Aldo G. S. Ventre,et al. A fuzzy model of the evaluation process , 1996, Proceedings of IEEE 5th International Fuzzy Systems.
[111] Xiangtong Qi,et al. Generating labor requirements and rosters for mail handlers using simulation and optimization , 2006, Comput. Oper. Res..