Modeling Multi-Echelon Multi-Supplier Repairable Inventory Systems with Backorders

This paper considers an inventory system responsible for repairable equipments located at several operational sites, each in different area. When a failure occurs at the operational site, spare parts are required. We analyze a multiple-supplier inventory system that includes an internal repair shop that offers several modes of repair with different repair times and an external supplier of spare parts. The network model of the problem presented here efficiently solves the problem for deterministic demands that vary over time with backorders taken into account.

[1]  Jiangbo Zheng,et al.  A Modeling Framework for the Planning of Strategic Supply Chain Viewed from Complex Network , 2009 .

[2]  Kamran Moinzadeh,et al.  An Information Based Multiechelon Inventory System with Emergency Orders , 1997, Oper. Res..

[3]  A. van Harten,et al.  Using repair priorities to reduce stock investment in spare part networks , 2005, Eur. J. Oper. Res..

[4]  Yael Perlman,et al.  Centralized decision of internal transfer-prices with congestion externalities for two modes of repair with limited repair capacity , 2007, J. Oper. Res. Soc..

[5]  S. Gass,et al.  Linear Programming: Methods and Applications. , 1960 .

[6]  Awi Federgruen,et al.  Progressive Interval Heuristics for Multi-Item Capacitated Lot-Sizing Problems , 2007, Oper. Res..

[7]  Xiao Liu,et al.  A model and algorithm for out-sourcing planning , 2005, IEEE International Conference on e-Business Engineering (ICEBE'05).

[8]  Kamran Moinzadeh,et al.  ORDER EXPEDITION IN MULTI-ECHELON PRODUCTION/DISTRIBUTION SYSTEMS , 1994 .

[9]  Hau L. Lee,et al.  Material Management in Decentralized Supply Chains , 1993, Oper. Res..

[10]  J. Zhang,et al.  A Capacitated Production Planning with Outsourcing: A General Model and Its Algorithm , 2006, ICIC.

[11]  Patrik Alfredsson,et al.  Modeling emergency supply flexibility in a two-echelon inventory system , 1999 .

[12]  D. R. Fulkerson,et al.  Flows in Networks. , 1964 .

[13]  Ivo J. B. F. Adan,et al.  Reducing Costs of Spare Parts Supply Systems via Static Priorities , 2009, Asia Pac. J. Oper. Res..

[14]  David F. Pyke Priority repair and dispatch policies for reparable-item logistics systems , 1990 .

[15]  Andrei Sleptchenko,et al.  Effects of finite repair capacity in multi-echelon, multi-indenture service part supply systems , 2002 .

[16]  S. Minner Multiple-supplier inventory models in supply chain management: A review , 2003 .

[17]  W. Prager On the Caterer Problem , 1956 .

[18]  R. Ganeshan Managing supply chain inventories: A multiple retailer, one warehouse, multiple supplier model , 1999 .

[19]  Ivo Adan,et al.  A trade off between emergency repair and inventory investment , 1998 .

[20]  D. Bartholomew,et al.  Linear Programming: Methods and Applications , 1970 .

[21]  Beatriz Abdul-Jalbar,et al.  Single cycle policies for the one-warehouse N-retailer inventory/distribution system , 2006 .

[22]  Duncan J. Watts,et al.  Collective dynamics of ‘small-world’ networks , 1998, Nature.

[23]  Yael Perlman,et al.  Setting expediting repair policy in a multi-echelon repairable-item inventory system with limited repair capacity , 2001, J. Oper. Res. Soc..

[24]  Gary D. Scudder,et al.  Priority Scheduling Rules for Repairable Inventory Systems , 1982 .