Disassembly Line Balancing Optimization Method for High Efficiency and Low Carbon Emission
暂无分享,去创建一个
Qingdi Ke | Lei Zhang | Xikun Zhao | Wanfu Dong | Yanjiu Zhong | Qingdi Ke | Lei Zhang | Xikun Zhao | Wanfu Dong | Yan-jiu Zhong
[1] Yu-Te Wang,et al. A decision support system to estimate the carbon emission and cost of product designs , 2012 .
[2] Guangfu Liu,et al. Nondestructive Surface Threshold Definition for Remanufacturing Disassembly of Interference Fit , 2018, International Journal of Precision Engineering and Manufacturing.
[3] Surendra M. Gupta,et al. A balancing method and genetic algorithm for disassembly line balancing , 2007, Eur. J. Oper. Res..
[4] Mehmet Ali Ilgin. The disassembly line: balancing and modeling, by S.M. McGovern and S.M. Gupta , 2011 .
[5] Hai Hong Huang,et al. Product Life Cycle Energy Consumption Analysis Method Considering Remanufacturing , 2011 .
[6] Yi Wang,et al. A Pareto improved artificial fish swarm algorithm for solving a multi-objective fuzzy disassembly line balancing problem , 2017, Expert Syst. Appl..
[7] Jong-Oh Park,et al. Optimal Disassembly Sequence Using Genetic Algorithms Considering Economic and Environmental Aspects , 2001 .
[8] Yixiong Feng,et al. A new multi-objective ant colony algorithm for solving the disassembly line balancing problem , 2010 .
[9] J. F. Mason. Euro Space Agency opens '02 with a bang , 2002 .
[10] Ruggero G. Pensa,et al. A privacy self-assessment framework for online social networks , 2017, Expert Syst. Appl..
[11] Wen Qi,et al. Organizational effectiveness evaluation model for construction projects based on fuzzy-analytic hierarchy processes , 2015 .
[12] Askiner Gungor,et al. Issues in environmentally conscious manufacturing and product recovery: a survey , 1999 .
[13] Li Feng-sha. Research on the calculation method of carbon emissions of coal industry and low carbon operation mode , 2013 .
[14] He Xu,et al. Life cycle assessment of end-of-life vehicle recycling processes in China—take Corolla taxis for example , 2016 .
[15] Wan-Sik Woo,et al. Remanufacturing: Trends and issues , 2017, International Journal of Precision Engineering and Manufacturing-Green Technology.
[16] Yixiong Feng,et al. Multi-objective disassembly line balancing via modified ant colony optimization algorithm , 2010, 2010 IEEE Fifth International Conference on Bio-Inspired Computing: Theories and Applications (BIC-TA).
[17] Jian Chen,et al. Hybrid graph disassembly model and sequence planning for product maintenance , 2006 .
[18] M. Seitz. A critical assessment of motives for product recovery: the case of engine remanufacturing , 2007 .
[19] Askiner Gungor,et al. A solution approach to the disassembly line balancing problem in the presence of task failures , 2001 .
[20] Surendra M. Gupta,et al. A tabu search algorithm for balancing a sequence-dependent disassembly line , 2014 .
[21] Eren Özceylan,et al. Resource Constrained Disassembly Line Balancing Problem , 2016 .
[22] Mehmet Ali Ilgin,et al. Environmentally conscious manufacturing and product recovery (ECMPRO): A review of the state of the art. , 2010, Journal of environmental management.
[23] M. Matsumoto,et al. Trends and research challenges in remanufacturing , 2016 .
[24] P.S. Dillon,et al. Salvageability becoming law , 1994, IEEE Spectrum.
[25] Surendra M. Gupta,et al. Ant colony optimization for disassembly sequencing with multiple objectives , 2006 .