Disassembly Line Balancing Optimization Method for High Efficiency and Low Carbon Emission

Disassembly is the first step in product recycling and remanufacturing. When disassembling large quantities of products, the disassembly efficiency is crucial for enterprises. Thus, disassembly line is the best choice for automated disassembly of disposal products. Disassembling products, especially complex structure of products, consume a lot of resources and energy and produce large amounts of carbon emissions. So, it is essential for disassembly line to work efficiently and environmentally. In this paper, the hybrid graph is proposed to express the direct and indirect constraint relationship among components. Then, the mathematical model of carbon emission is built by quantifying the carbon emissions in the process of product disassembly. Taking into account the basic disassembly time, direction change time and tool change time, the mathematical model of high efficiency is presented for optimizing disassembly time. Additionally, based on the traditional multi-objective disassembly line balancing problem (DLBP), a novel multi-objective optimization model of the DLBP with shortest disassembly time and minimum carbon emissions is proposed for improving disassembly efficiency and reducing the carbon emissions in the process of disassembly. Furthermore, genetic algorithm is presented for optimizing the disassembly sequence. Finally, an automobile engine is given as an example to confirm the practicality of the proposed model in solving the DLBP.

[1]  Yu-Te Wang,et al.  A decision support system to estimate the carbon emission and cost of product designs , 2012 .

[2]  Guangfu Liu,et al.  Nondestructive Surface Threshold Definition for Remanufacturing Disassembly of Interference Fit , 2018, International Journal of Precision Engineering and Manufacturing.

[3]  Surendra M. Gupta,et al.  A balancing method and genetic algorithm for disassembly line balancing , 2007, Eur. J. Oper. Res..

[4]  Mehmet Ali Ilgin The disassembly line: balancing and modeling, by S.M. McGovern and S.M. Gupta , 2011 .

[5]  Hai Hong Huang,et al.  Product Life Cycle Energy Consumption Analysis Method Considering Remanufacturing , 2011 .

[6]  Yi Wang,et al.  A Pareto improved artificial fish swarm algorithm for solving a multi-objective fuzzy disassembly line balancing problem , 2017, Expert Syst. Appl..

[7]  Jong-Oh Park,et al.  Optimal Disassembly Sequence Using Genetic Algorithms Considering Economic and Environmental Aspects , 2001 .

[8]  Yixiong Feng,et al.  A new multi-objective ant colony algorithm for solving the disassembly line balancing problem , 2010 .

[9]  J. F. Mason Euro Space Agency opens '02 with a bang , 2002 .

[10]  Ruggero G. Pensa,et al.  A privacy self-assessment framework for online social networks , 2017, Expert Syst. Appl..

[11]  Wen Qi,et al.  Organizational effectiveness evaluation model for construction projects based on fuzzy-analytic hierarchy processes , 2015 .

[12]  Askiner Gungor,et al.  Issues in environmentally conscious manufacturing and product recovery: a survey , 1999 .

[13]  Li Feng-sha Research on the calculation method of carbon emissions of coal industry and low carbon operation mode , 2013 .

[14]  He Xu,et al.  Life cycle assessment of end-of-life vehicle recycling processes in China—take Corolla taxis for example , 2016 .

[15]  Wan-Sik Woo,et al.  Remanufacturing: Trends and issues , 2017, International Journal of Precision Engineering and Manufacturing-Green Technology.

[16]  Yixiong Feng,et al.  Multi-objective disassembly line balancing via modified ant colony optimization algorithm , 2010, 2010 IEEE Fifth International Conference on Bio-Inspired Computing: Theories and Applications (BIC-TA).

[17]  Jian Chen,et al.  Hybrid graph disassembly model and sequence planning for product maintenance , 2006 .

[18]  M. Seitz A critical assessment of motives for product recovery: the case of engine remanufacturing , 2007 .

[19]  Askiner Gungor,et al.  A solution approach to the disassembly line balancing problem in the presence of task failures , 2001 .

[20]  Surendra M. Gupta,et al.  A tabu search algorithm for balancing a sequence-dependent disassembly line , 2014 .

[21]  Eren Özceylan,et al.  Resource Constrained Disassembly Line Balancing Problem , 2016 .

[22]  Mehmet Ali Ilgin,et al.  Environmentally conscious manufacturing and product recovery (ECMPRO): A review of the state of the art. , 2010, Journal of environmental management.

[23]  M. Matsumoto,et al.  Trends and research challenges in remanufacturing , 2016 .

[24]  P.S. Dillon,et al.  Salvageability becoming law , 1994, IEEE Spectrum.

[25]  Surendra M. Gupta,et al.  Ant colony optimization for disassembly sequencing with multiple objectives , 2006 .