Dynamic lot-sizing with rework of defective items and minimum lot-size constraints

In most production processes, defective items may result from an imperfect production system and the need of reworking them is inevitable in many production environments. Despite the great importance of rework in real-world manufacturing, the body of literature is very limited. This paper deals with the effects of defective items and rework on the Capacitated Lot-Sizing Problem (CLSP). We present a mixed-integer programming formulation of the CLSP with rework of defective items and minimum lot-size constraints on production lots. The formulation describes an imperfect production process that leads to a fraction of defective items that have to be reworked before they can be sold to customers. Detailed numerical experiments show that while the occurrence of defective items significantly increases the computational times, reasonably sized minimum lot-size constraints, besides their practical importance, can be a good strategy to accelerate the solution process.

[1]  Jian Yang,et al.  A concave‐cost production planning problem with remanufacturing options , 2005 .

[2]  R. Haji,et al.  Lot Sizing with Non-Zero Setup Times for Rework , 2006, 2006 International Conference on Service Systems and Service Management.

[3]  C. Suerie Campaign planning in time-indexed model formulations , 2003 .

[4]  Hai Jiang,et al.  A Lagrangian relaxation based approach for the capacitated lot sizing problem in closed-loop supply chain , 2012 .

[5]  Jian Yang,et al.  Economic Lot-Sizing with Remanufacturing Options , 2001 .

[6]  Hong-Dar Lin,et al.  Numerical method for determination of the optimal lot size for a manufacturing system with discontinuous issuing policy and rework , 2011 .

[7]  W. V. D. Heuvel,et al.  On the complexity of the economic lot-sizing problem with remanufacturing options , 2004 .

[8]  Simone Zanoni,et al.  Multi-product economic lot scheduling problem with manufacturing and remanufacturing using a basic period policy , 2012, Comput. Ind. Eng..

[9]  Haji Rasoul,et al.  OPTIMAL BATCH PRODUCTION FOR A SINGLE MACHINE SYSTEM WITH ACCUMULATED DEFECTIVES AND RANDOM RATE OF REWORK , 2010 .

[10]  Jiafu Tang,et al.  Capacitated dynamic lot sizing problems in closed-loop supply chain , 2009, Eur. J. Oper. Res..

[11]  P. A. Hayek,et al.  Production lot sizing with the reworking of imperfect quality items produced , 2001 .

[12]  Yongjian Li,et al.  Heuristic genetic algorithm for capacitated production planning problems with batch processing and remanufacturing , 2007 .

[13]  Stefan Voß,et al.  Integrating deterioration and lifetime constraints in production and supply chain planning: A survey , 2014, Eur. J. Oper. Res..

[14]  Heinrich Kuhn,et al.  Capacitated lot-sizing with extensions: a review , 2008, 4OR.

[15]  Singa Wang Chiu,et al.  Optimal production lot sizing with rework, scrap rate, and service level constraint , 2007, Math. Comput. Model..

[16]  Udo Buscher,et al.  Optimizing a production system with rework and equal sized batch shipments , 2007, Comput. Oper. Res..

[17]  F. Sahling A Column-Generation Approach for a Short-Term Production Planning Problem in Closed-Loop Supply Chains , 2013 .

[18]  N. Rachaniotis,et al.  Lot sizing in a production system with rework and product deterioration , 2005 .

[19]  William W. Trigeiro,et al.  Capacitated lot sizing with setup times , 1989 .

[20]  K. Richter,et al.  The reverse Wagner/Whitin model with variable manufacturing and remanufacturing cost , 2001 .

[21]  Ruud H. Teunter,et al.  Dynamic lot sizing with product returns and remanufacturing , 2006 .

[22]  Ruud H. Teunter,et al.  Economic Lot Scheduling Problem with Returns , 2006 .

[23]  Y. Chiu Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging , 2003 .

[24]  Ruud H. Teunter,et al.  Lot-sizing for a single-stage single-product production system with rework of perishable production defectives , 2003, OR Spectr..

[25]  Ruud H. Teunter,et al.  Multi-product economic lot scheduling problem with separate production lines for manufacturing and remanufacturing , 2008, Eur. J. Oper. Res..

[26]  Karl Inderfurth,et al.  Planning and control of rework in the process industries: A review , 2002 .

[27]  S Shadrokh,et al.  ECONOMIC PRODUCTION QUANTITY IN REWORKABLE PRODUCTION SYSTEMS WITH INSPECTION ERRORS, SCRAPS AND BACKLOGGING , 2009 .

[28]  Ou Tang,et al.  Heuristics for the economic lot scheduling problem with returns. [In special section on problems and models of inventories selected papers of the fourteenth International symposium on inventories] , 2009 .

[29]  C. T. Ng,et al.  Cost minimizing scheduling of work and rework processes on a single facility under deterioration of reworkables , 2007 .

[30]  David L. Woodruff,et al.  Introduction to Computational Optimization Models for Production Planning in a Supply Chain , 2003 .

[31]  Knut Richter,et al.  Remanufacturing planning for the reverse Wagner/Whitin models , 2000, Eur. J. Oper. Res..

[32]  Tobias Schulz,et al.  A new Silver–Meal based heuristic for the single-item dynamic lot sizing problem with returns and remanufacturing , 2011 .

[33]  Wilco van den Heuvel,et al.  Economic lot-sizing with remanufacturing: complexity and efficient formulations , 2010 .