Dynamic lot-sizing with rework of defective items and minimum lot-size constraints
暂无分享,去创建一个
[1] Jian Yang,et al. A concave‐cost production planning problem with remanufacturing options , 2005 .
[2] R. Haji,et al. Lot Sizing with Non-Zero Setup Times for Rework , 2006, 2006 International Conference on Service Systems and Service Management.
[3] C. Suerie. Campaign planning in time-indexed model formulations , 2003 .
[4] Hai Jiang,et al. A Lagrangian relaxation based approach for the capacitated lot sizing problem in closed-loop supply chain , 2012 .
[5] Jian Yang,et al. Economic Lot-Sizing with Remanufacturing Options , 2001 .
[6] Hong-Dar Lin,et al. Numerical method for determination of the optimal lot size for a manufacturing system with discontinuous issuing policy and rework , 2011 .
[7] W. V. D. Heuvel,et al. On the complexity of the economic lot-sizing problem with remanufacturing options , 2004 .
[8] Simone Zanoni,et al. Multi-product economic lot scheduling problem with manufacturing and remanufacturing using a basic period policy , 2012, Comput. Ind. Eng..
[9] Haji Rasoul,et al. OPTIMAL BATCH PRODUCTION FOR A SINGLE MACHINE SYSTEM WITH ACCUMULATED DEFECTIVES AND RANDOM RATE OF REWORK , 2010 .
[10] Jiafu Tang,et al. Capacitated dynamic lot sizing problems in closed-loop supply chain , 2009, Eur. J. Oper. Res..
[11] P. A. Hayek,et al. Production lot sizing with the reworking of imperfect quality items produced , 2001 .
[12] Yongjian Li,et al. Heuristic genetic algorithm for capacitated production planning problems with batch processing and remanufacturing , 2007 .
[13] Stefan Voß,et al. Integrating deterioration and lifetime constraints in production and supply chain planning: A survey , 2014, Eur. J. Oper. Res..
[14] Heinrich Kuhn,et al. Capacitated lot-sizing with extensions: a review , 2008, 4OR.
[15] Singa Wang Chiu,et al. Optimal production lot sizing with rework, scrap rate, and service level constraint , 2007, Math. Comput. Model..
[16] Udo Buscher,et al. Optimizing a production system with rework and equal sized batch shipments , 2007, Comput. Oper. Res..
[17] F. Sahling. A Column-Generation Approach for a Short-Term Production Planning Problem in Closed-Loop Supply Chains , 2013 .
[18] N. Rachaniotis,et al. Lot sizing in a production system with rework and product deterioration , 2005 .
[19] William W. Trigeiro,et al. Capacitated lot sizing with setup times , 1989 .
[20] K. Richter,et al. The reverse Wagner/Whitin model with variable manufacturing and remanufacturing cost , 2001 .
[21] Ruud H. Teunter,et al. Dynamic lot sizing with product returns and remanufacturing , 2006 .
[22] Ruud H. Teunter,et al. Economic Lot Scheduling Problem with Returns , 2006 .
[23] Y. Chiu. Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging , 2003 .
[24] Ruud H. Teunter,et al. Lot-sizing for a single-stage single-product production system with rework of perishable production defectives , 2003, OR Spectr..
[25] Ruud H. Teunter,et al. Multi-product economic lot scheduling problem with separate production lines for manufacturing and remanufacturing , 2008, Eur. J. Oper. Res..
[26] Karl Inderfurth,et al. Planning and control of rework in the process industries: A review , 2002 .
[27] S Shadrokh,et al. ECONOMIC PRODUCTION QUANTITY IN REWORKABLE PRODUCTION SYSTEMS WITH INSPECTION ERRORS, SCRAPS AND BACKLOGGING , 2009 .
[28] Ou Tang,et al. Heuristics for the economic lot scheduling problem with returns. [In special section on problems and models of inventories selected papers of the fourteenth International symposium on inventories] , 2009 .
[29] C. T. Ng,et al. Cost minimizing scheduling of work and rework processes on a single facility under deterioration of reworkables , 2007 .
[30] David L. Woodruff,et al. Introduction to Computational Optimization Models for Production Planning in a Supply Chain , 2003 .
[31] Knut Richter,et al. Remanufacturing planning for the reverse Wagner/Whitin models , 2000, Eur. J. Oper. Res..
[32] Tobias Schulz,et al. A new Silver–Meal based heuristic for the single-item dynamic lot sizing problem with returns and remanufacturing , 2011 .
[33] Wilco van den Heuvel,et al. Economic lot-sizing with remanufacturing: complexity and efficient formulations , 2010 .