Praxis of Performance Measurement in Public-Private Partnerships: Moving beyond the Iron Triangle

An effective and efficient performance measurement is deemed to be pivotal for ensuring owners' and stakeholders' needs are being met throughout a project's lifecycle. To determine the nature of performance measurement in Australian public-private partnerships (PPPs), an interpretivist approach that utilized semistructured interviews was undertaken in the State of Western Australia. A total of 25 interviews were conducted with key stakeholders and it was revealed that there was a proclivity for performance measurements during design and construction to focus on traditional ex ante and ex post evaluations that were aligned to the conventional iron triangle: time, cost, and quality (TCQ). However, there was widespread consensus among the interviewees that the traditional TCQ approach was too simplistic to capture the inherent complexities associated with social infrastructure PPPs. In addressing this issue the analysis indicates that process-based lifecycle performance measurement that strategically places an emphasis on value for money (VfM) should be introduced into PPPs to replace traditional ex ante and ex post evaluations. It is suggested that this type of measurement can be integrated with a broader VfM assessment and a series of key performance indicators to enable the public and private sectors to improve their performance throughout a project's lifecycle. The empirical analysis provides the foundations for developing a performance measurement that can ensure assets are future proofed over their lifecycles.

[1]  P. Love,et al.  Life Cycle Critical Success Factors for Public-Private Partnership Infrastructure Projects , 2015 .

[2]  C. Perry,et al.  Qualitative Marketing Research , 2001 .

[3]  Mervyn K. Lewis,et al.  Are Public Private Partnerships value for money? , 2005 .

[4]  A. Neely The performance measurement revolution: why now and what next? , 1999 .

[5]  Andy Neely,et al.  Designing, implementing and updating performance measurement systems , 2000 .

[6]  Saad H.S. Al-Jibouri,et al.  Proposed System for Measuring Project Performance Using Process-Based Key Performance Indicators , 2012 .

[7]  Q. Shen,et al.  A review of studies on Public–Private Partnership projects in the construction industry , 2010 .

[8]  John E. Schaufelberger,et al.  ALTERNATE FINANCING STRATEGIES FOR BUILD-OPERATE-TRANSFER PROJECTS , 2003 .

[9]  Xueqing Zhang,et al.  CONCESSIONAIRE SELECTION: METHODS AND CRITERIA , 2004 .

[10]  Andy Neely,et al.  The success and failure of performance measurement initiatives: Perceptions of participating managers , 2002 .

[11]  N. Vajdic,et al.  Use of key performance indicators for PPP transport projects to meet stakeholders’ performance objectives , 2013 .

[12]  Samuel Labi,et al.  Contracting in highway maintenance and rehabilitation: Are spatial effects important? , 2010 .

[13]  David J. Edwards,et al.  Moving Beyond Optimism Bias and Strategic Misrepresentation: An Explanation for Social Infrastructure Project Cost Overruns , 2012, IEEE Transactions on Engineering Management.

[14]  Martine Buser,et al.  Emerging metagovernance as an institutional framework for public private partnership networks in Denmark , 2006 .

[15]  P. Love,et al.  Public-Private Partnerships: A Review of Theory and Practice of Performance Measurement , 2014 .

[16]  Peter E.D. Love,et al.  Impact of the Capital Market Collapse on Public-Private Partnership Infrastructure Projects , 2011 .

[17]  Y. Kwak,et al.  Towards a Comprehensive Understanding of Public Private Partnerships for Infrastructure Development , 2009 .

[18]  Christopher Findlay,et al.  Financing Public Infrastructure: Darrin Grimsey and Mervyn K Lewis, Public Private Partnerships: The Worldwide Revolution in Infrastructure Provision and Private Finance, Edward Elgar, Cheltenham, 2004 , 2005 .

[19]  Graeme Hodge,et al.  Public-private partnerships: the Australasian experience with physical infrastructure , 2005 .

[20]  M. Lewis,et al.  Evaluating the risks of public private partnerships for infrastructure projects , 2002 .

[21]  Peter E.D. Love,et al.  Triangulation in construction management research , 2002 .

[22]  Mohan M. Kumaraswamy,et al.  HONG KONG EXPERIENCE IN MANAGING BOT PROJECTS , 2001 .

[23]  R. Tiong,et al.  Framework for Critical Success Factors of BOT Projects in China , 2001 .

[24]  Steve Rowlinson,et al.  Critical success factors of the BOOT procurement system: reflections from the Stadium Australia case study , 2002 .

[25]  Mohan M. Kumaraswamy,et al.  Governmental role in BOT-led infrastructure development , 2001 .

[26]  M. A. Soomro,et al.  Roles of Private-Sector Partners in Transportation Public-Private Partnership Failures , 2015 .

[27]  A. Akintoye,et al.  Achieving best value in private finance initiative project procurement , 2003 .

[28]  A. Akintoye,et al.  Critical success factors for PPP/PFI projects in the UK construction industry , 2005 .

[29]  Peter E. D. Love,et al.  Construction business performance measurement: the SPM alternative , 2000, Bus. Process. Manag. J..

[30]  G. Hodge The risky business of public–private partnerships , 2004 .

[31]  ShouQing Wang,et al.  Evaluation and Management of Political Risks in China's BOT Projects , 2000 .

[32]  Peter E.D. Love,et al.  Future Proofing PPPs: Life-Cycle Performance Measurement and Building Information Modelling , 2015 .

[33]  R. Tiong CSFs in Competitive Tendering and Negotiation Model for BOT Projects , 1996 .

[34]  Keith R. Molenaar,et al.  Key performance indicators in public-private partnerships , 2011 .

[35]  Ghassan Aouad,et al.  Performance management in construction: a conceptual framework , 2001 .

[36]  Robert L. K. Tiong,et al.  Critical Success Factors for Tendering BOT Infrastructure Projects in China , 2002 .

[37]  A. Chan,et al.  Review of studies on the Critical Success Factors for Public–Private Partnership (PPP) projects from 1990 to 2013 , 2015 .

[38]  Samuel Labi,et al.  Influence of Highway Project Characteristics on Contract Type Selection: Empirical Assessment , 2010 .

[39]  P. Love,et al.  A benefits realization management building information modeling framework for asset owners , 2014 .

[40]  Michael Regan,et al.  Infrastructure Procurement: Learning from Private–Public Partnership Experiences ‘Down Under’ , 2011 .

[41]  Mildred E. Warner,et al.  Managing Markets for Public Service: The Role of Mixed Public–Private Delivery of City Services , 2008 .

[42]  O. Hart Incomplete Contracts and Public Ownership: Remarks, and an Application to Public-Private Partnerships , 2002 .

[43]  Hans Wilhelm Alfen,et al.  A comparison of Project Finance and the Forfeiting Model as financing forms for PPP projects in Germany , 2008 .

[44]  P. Lam,et al.  Critical Success Factors for PPPs in Infrastructure Developments: Chinese Perspective , 2010 .

[45]  S. Kvale Interviews : an introduction to qualitative research interviewing , 1996 .

[46]  Mark W. Lipsey,et al.  Evaluation: A Systematic Approach , 1979 .

[47]  Lenny Roth,et al.  Privatisation of prisons , 2004 .

[48]  Peter E.D. Love,et al.  Divergence or Congruence? A Path Model of Rework for Building and Civil Engineering Projects , 2009 .

[49]  Nutavoot Pongsiri Regulation and Public-Private Partnerships , 2002 .

[50]  Julie L. Ozanne,et al.  Alternative Ways of Seeking Knowledge in Consumer Research , 1988 .

[51]  Andy Neely,et al.  Performance measurement system design: developing and testing a process‐based approach , 2000 .

[52]  Yiannis Xenidis,et al.  THE LEGAL RISKS IN BUILD-OPERATE-TRANSFER PROJECTS , 2005 .

[53]  A. Neely The evolution of performance measurement research: Developments in the last decade and a research agenda for the next , 2005 .

[54]  Xiaohua Jin,et al.  Determinants of Efficient Risk Allocation in Privately Financed Public Infrastructure Projects in Australia , 2010 .

[55]  Peter E.D. Love,et al.  Ex-Ante Evaluation of Public-Private Partnerships: Macroeconomic Analysis , 2015 .

[56]  Iain Black,et al.  The presentation of interpretivist research , 2006 .

[57]  A. H. Nawawi,et al.  The Malaysian Private Finance Initiative and Value for Money , 2009 .

[58]  Zohar J. Herbsman,et al.  LANE RENTAL--INNOVATIVE WAY TO REDUCE ROAD CONSTRUCTION TIME , 1998 .

[59]  D. Silverman Interpreting Qualitative Data , 1993 .

[60]  Rod Gameson,et al.  Private finance initiative in use , 2009 .

[61]  Andy Neely,et al.  The Performance Prism: The Scorecard for Measuring and Managing Business Success , 2002 .

[62]  Peter E.D. Love,et al.  Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects , 2002 .

[63]  Tahir M. Nisar,et al.  Risk Management in Public–Private Partnership Contracts , 2007 .

[64]  Robert L. K. Tiong,et al.  Evaluation and management of foreign exchange and revenue risks in China's BOT projects , 2000 .

[65]  T. Thorpe,et al.  KPIs: a critical appraisal of their use in construction , 2004 .

[66]  Naomi J. Brookes,et al.  A critical argument in favor of theoretical pluralism: Project failure and the many and varied limitations of project management , 2014 .

[67]  Ahmed M. Abdel Aziz,et al.  Successful Delivery of Public-Private Partnerships for Infrastructure Development , 2007 .

[68]  Alexander Galetovic,et al.  The Basic Public Finance of Public-Private Partnerships , 2007 .

[69]  Peter E.D. Love,et al.  Review of performance measurement: Implications for public–private partnerships , 2015 .

[70]  John F. Y. Yeung,et al.  Empirical Study of Risk Assessment and Allocation of Public-Private Partnership Projects in China , 2011 .

[71]  Xueqing Zhang,et al.  Financial Viability Analysis and Capital Structure Optimization in Privatized Public Infrastructure Projects , 2005 .

[72]  Albert P.C. Chan,et al.  Developing a Fuzzy Risk Allocation Model for PPP Projects in China , 2010 .

[73]  Stephen O. Ogunlana,et al.  Beyond the ‘iron triangle’: Stakeholder perception of key performance indicators (KPIs) for large-scale public sector development projects , 2010 .

[74]  Andrew D.F. Price,et al.  Performance Measurement in Construction , 2004 .

[75]  Graeme Hodge,et al.  The Challenge of Public–Private Partnerships , 2005 .

[76]  Xueqing Zhang,et al.  Criteria for Selecting the Private-Sector Partner in Public–Private Partnerships , 2005 .

[77]  Ming Xu,et al.  Comparative performance of PPPs and traditional procurement in Australia , 2007 .

[78]  Xiaohua Jin,et al.  Model for Efficient Risk Allocation in Privately Financed Public Infrastructure Projects Using Neuro-Fuzzy Techniques , 2011 .

[79]  Qiming Li,et al.  Selection of performance objectives and key performance indicators in public–private partnership projects to achieve value for money , 2009 .

[80]  P. Love,et al.  Conceptual Framework for the Performance Measurement of Public-Private Partnerships , 2015 .

[81]  Graeme Bowles,et al.  The private finance initiative: The procurement process in perspective , 2001 .

[82]  Samuel Labi,et al.  Analyzing the Duration and Prolongation of Performance-Based Contracts through Hazard-Based Duration and Zero-Inflated Random Parameters Poisson Models , 2009 .

[83]  David Baccarini,et al.  The Logical Framework Method for Defining Project Success , 1999 .

[84]  A. V. Thomas,et al.  Risk perception analysis of BOT road project participants in India , 2003 .

[85]  Xueqing Zhang,et al.  Improving Concessionaire Selection Protocols in Public/Private Partnered Infrastructure Projects , 2004 .

[86]  A. Akintoye,et al.  The allocation of risk in PPP/PFI construction projects in the UK , 2005 .

[87]  M. Lewis,et al.  Public Private Partnerships: The Worldwide Revolution in Infrastructure Provision and Project Finance , 2004 .

[88]  Marcus Jefferies Critical success factors of public private sector partnerships: A case study of the Sydney SuperDome , 2006 .

[89]  Steve Guanwei Jang A concessionaire selection decision model development andapplication for the PPP project procurement , 2011 .

[90]  K.A.K. Devapriya,et al.  Governance issues in financing of public–private partnership organisations in network infrastructure industries , 2006 .

[91]  Andy Neely,et al.  Performance measurement system design , 1995 .

[92]  Demos C. Angelides,et al.  The financial risks in build‐operate‐transfer projects , 2005 .

[93]  Mike,et al.  The Performance Prism , 2004 .

[94]  R. Tiong,et al.  Government support and risk‐return trade‐off in China's BOT power projects , 2000 .

[95]  R. Tiong,et al.  Analysis of political risks and opportunities in public private partnerships (PPP) in China and selected Asian countries , 2007 .

[96]  S. Levy Build, Operate, Transfer: Paving the Way for Tomorrow's Infrastructure , 2008 .

[97]  A. Neely,et al.  The performance prism in practice , 2001 .

[98]  P. Love,et al.  From justification to evaluation: Building information modeling for asset owners , 2013 .