Note---A Comparison of Capacity Planning Techniques in a Job Shop Control System
暂无分享,去创建一个
[1] Donald C Carroll,et al. Heuristic sequencing of single and multiple component jobs. , 1965 .
[2] C. T. Baker,et al. Simulation of a Simplified Job Shop , 1960 .
[3] Ludo Gelders,et al. Coordinating Aggregate and Detailed Scheduling in the One-Machine Job Shop: II - Computation and Structure , 1975, Oper. Res..
[4] Jeol Shwimer. Interaction Between Aggregate and Detailled Scheduling in a Job Shop , 1973 .
[5] John L. Colley,et al. Load Forecasting, Priority Sequencing, and Simulation in a Job Shop Control System , 1966 .
[6] S. Reiter. A System for Managing Job-Shop Production , 1966 .
[7] Earl LeGrande. The Development of a Factory Simulation System Using Actual Operating Data , 1963 .
[8] L. Gelders,et al. Coordinating Aggregate and Detailed Scheduling Decisions in the One-Machine Job Shop: Part I. Theory , 2015, Oper. Res..