Cooperative Multiobjective Decision Support for the Paper Industry
暂无分享,去创建一个
Alok Aggarwal | John Rachlin | Santhosh Kumaran | Frederick Y. Wu | Rama Akkiraju | Sesh Murthy | Ranga Jayaraman | Richard Goodwin | Pinar Keskinocak | Robert M. Fuhrer | M. C. Sturzenbecker | James Yeh | Robert Fuhrer | Martin C. Sturzenbecker | Robert Daigle | A. Aggarwal | R. Goodwin | S. Murthy | R. Akkiraju | P. Keskinocak | John Rachlin | Frederick Y. Wu | James Yeh | S. Kumaran | R. Jayaraman | Robert Daigle
[1] Ho Soo Lee,et al. Primary production scheduling at steelmaking industries , 1996, IBM J. Res. Dev..
[2] Christos Koulamas,et al. A heuristic for the single machine tardiness problem , 1993 .
[3] John F. Pierce. Some large-scale production scheduling problems in the paper industry , 1964 .
[4] John Rachlin,et al. Interactive Decision Support: Advantages of an Incomplete Utility Model , 1998 .
[5] A. I. Hinxman. The trim-loss and assortment problems: A survey , 1980 .
[6] Ralph E. Steuer. Multiple criteria optimization , 1986 .
[7] Raj Reddy. The Challenge of Artificial Intelligence , 1996, Computer.
[8] Marc Roubens,et al. Multiple criteria decision making , 1994 .
[9] Hartmut Stadtler,et al. A one-dimensional cutting stock problem in the aluminium industry and its solution , 1990 .
[10] S. Vajda,et al. Principles of Operations Research, with Applications to Managerial Decisions. , 1970 .
[11] Christopher J. Biermann,et al. Essentials of Pulping and Papermaking , 1993 .
[12] John H. Holland,et al. Adaptation in Natural and Artificial Systems: An Introductory Analysis with Applications to Biology, Control, and Artificial Intelligence , 1992 .
[13] Michael Pinedo,et al. Scheduling jobs on parallel machines with sequence-dependent setup times , 1997, Eur. J. Oper. Res..
[14] Katia Sycara,et al. Multiagent coordination in tightly coupled task scheduling , 1997 .
[15] Chris N. Potts,et al. A survey of algorithms for the single machine total weighted tardiness scheduling problem , 1990, Discret. Appl. Math..
[16] Pedro S. de Souza,et al. Asynchronous organizations for multi-algorithm problems , 1993, SAC '93.
[17] Constantine Goulimis. Optimal solutions for the cutting stock problem , 1990 .
[18] J. Soeiro Ferreira,et al. A two-phase roll cutting problem , 1990 .
[19] Masayuki Numao,et al. Cooperative scheduling and its application to steelmaking processes , 1991 .
[20] Victor R. Lesser,et al. The Hearsay-II Speech-Understanding System: Integrating Knowledge to Resolve Uncertainty , 1980, CSUR.
[21] R. S. Laundy,et al. Multiple Criteria Optimisation: Theory, Computation and Application , 1989 .
[22] Harald Dyckhoff,et al. A typology of cutting and packing problems , 1990 .
[23] Christos Koulamas,et al. The Total Tardiness Problem: Review and Extensions , 1994, Oper. Res..
[24] R. W. Haessler,et al. Cutting stock problems and solution procedures , 1991 .
[25] Colin D. Simpson,et al. Industrial Electronics , 1936, Nature.
[26] Stephen F. Smith,et al. An Integrated Framework for Generating and Revising Factory Schedules , 1990 .
[27] M. Shaw,et al. MADISON STREAMLINES BUSINESS PROCESSES WITH INTEGRATED INFORMATION SYSTEM , 1998 .
[28] R. Vahrenkamp,et al. Random search in the one-dimensional cutting stock problem , 1996 .
[29] S. Murthy,et al. Agent-Based Cooperative Scheduling , 1997 .
[30] B. Golden. Approaches to the Cutting Stock Problem , 1976 .
[31] G. L. Stanley. Third year of record sales expected for U.S. paper and related industries in 1996 , 1996 .
[32] Ralph E. Gomory,et al. A Linear Programming Approach to the Cutting Stock Problem---Part II , 1963 .
[33] Robert W. Haessler. Selection and design of heuristic procedures for solving roll trim problems , 1988 .
[34] R. W. Haessler. A new generation of paper machine trim programs , 1988 .
[35] R. W. Haessler. A Heuristic Programming Solution to a Nonlinear Cutting Stock Problem , 1971 .
[36] R. M. Russell,et al. A Heuristic Algorithm for Sequencing on One Machine to Minimize Total Tardiness , 1992 .
[37] Joseph Y.-T. Leung,et al. Minimizing Total Tardiness on One Machine is NP-Hard , 1990, Math. Oper. Res..
[38] Michael Pinedo,et al. A heuristic to minimize the total weighted tardiness with sequence-dependent setups , 1997 .
[39] Yih-Long Chang,et al. Heuristics for minimizing mean tardiness form parallel machines , 1991 .
[40] Norman Sadeh,et al. A Multi-Agent Framework for Modeling Supply Chain Dynamics , 1996 .
[41] Gerhard Wäscher. An LP-based approach to cutting stock problems with multiple objectives , 1990 .
[42] E. Polak,et al. On Multicriteria Optimization , 1976 .
[43] Frederick Y. Wu,et al. Multi Machine Scheduling: An Agent-Based Approach , 1998, AAAI/IAAI.
[44] Tad Hogg,et al. An Economics Approach to Hard Computational Problems , 1997, Science.
[45] Seshashayee Sankarshana Murthy. Synergy in cooperating agents: designing manipulators from task specifications , 1992 .
[46] Paolo Toth,et al. Knapsack Problems: Algorithms and Computer Implementations , 1990 .
[47] R. Gomory,et al. A Linear Programming Approach to the Cutting-Stock Problem , 1961 .