P-ACO Approach to Assignment Problem in FMSs

One of the most important problems in production planning of flexible manufacturing system (FMS) is machine tool selection and operation allocation problem that directly influences the production costs and times .In this paper minimizing machining cost, set-up cost and material handling cost as a multi-objective problem in flexible manufacturing systems environment are considered. We present a 0-1 integer linear programming model for the multiobjective machine tool selection and operation allocation problem and due to the large scale nature of the problem, solving the problem to obtain optimal solution in a reasonable time is infeasible, Paretoant colony optimization (P-ACO) approach for solving the multiobjective problem in reasonable time is developed. Experimental results indicate effectiveness of the proposed algorithm for solving the problem. Keywords—Flexible manufacturing system; Production planning; Machine tool selection; Operation allocation; Multiobjective optimization; Metaheuristic.

[1]  Richard F. Hartl,et al.  Pareto Ant Colony Optimization: A Metaheuristic Approach to Multiobjective Portfolio Selection , 2004, Ann. Oper. Res..

[2]  Sung Shick Kim,et al.  Operation sequence and tool selection in flexible manufacturing systems under dynamic tool allocation , 2003, Comput. Ind. Eng..

[3]  Manoj Kumar Tiwari,et al.  Modeling machine loading problem of FMSs and its solution methodology using a hybrid tabu search and , 2004 .

[4]  Marco Dorigo,et al.  Ant system: optimization by a colony of cooperating agents , 1996, IEEE Trans. Syst. Man Cybern. Part B.

[5]  Mansour E. Abou Gamila,et al.  A modeling technique for loading and scheduling problems in FMS , 2003 .

[6]  Marek B. Zaremba,et al.  Logistics models in flexible manufacturing , 2000 .

[7]  Kumbakonam R. Rajagopal,et al.  A heuristic based on multi-stage programming approach for machine-loading problem in a flexible manufacturing system , 2006 .

[8]  Shinn-Ying Ho,et al.  A novel approach to production planning of flexible manufacturing systems using an efficient multi-objective genetic algorithm , 2005 .

[9]  Marc Gravel,et al.  Scheduling continuous casting of aluminum using a multiple objective ant colony optimization metaheuristic , 2002, Eur. J. Oper. Res..

[10]  Nebil Buyurgan,et al.  Tool allocation in flexible manufacturing systems with tool alternatives , 2004 .

[11]  Benjamín Barán,et al.  A Multiobjective Ant Colony System for Vehicle Routing Problem with Time Windows , 2003, Applied Informatics.

[12]  Luca Maria Gambardella,et al.  A Multiple Ant Colony System for Vehicle Routing Problems with Time Windows , 1999 .