Coordinating product, process, and supply chain decisions: A constraint satisfaction approach

The importance of coordinating product, process, and supply chain (PPSC) decisions has received much attention and popularity in academia and industry alike. This paper formulates PPSC coordination as a factory loading allocation problem (FLAP) from a constraint satisfaction perspective. A domain-based FLAP reference model is proposed for the conceptualization of a multi-site manufacturing supply chain, considering multiple domains, network structures, product characteristics, decision variables, along with various constraints. A decision propagation structure (DPS) incorporating with a connectionist approach is developed based on the concept of constraint heuristic search to facilitate the exploration of solution spaces. A case study in a multi-national company is presented to illustrate the FLAP framework, which implies practical insights into PPSC coordination.

[1]  R. Narasimhan,et al.  Effect of supply chain integration on the relationship between diversification and performance: evidence from Japanese and Korean firms , 2002 .

[2]  Hamid Noori,et al.  Dispersed network manufacturing: adapting SMEs to compete on the global scale , 2006 .

[3]  Michael E. Porter,et al.  Changing Patterns of International Competition , 1986 .

[4]  George Q. Huang,et al.  Towards integrated optimal configuration of platform products, manufacturing processes, and supply chains , 2005 .

[5]  R. Handfield,et al.  Involving Suppliers in New Product Development , 1999 .

[6]  Mark Ferguson,et al.  Evaluation of postponement structures to accommodate mass customization , 2005 .

[7]  Roger Jianxin Jiao,et al.  Concurrent Enterprising for Mass Customization , 2004, Concurr. Eng. Res. Appl..

[8]  You Xiao,et al.  A web‐based logistics management system for agile supply demand network design , 2006 .

[9]  Saurabh Gupta,et al.  INTEGRATED COMPONENT AND SUPPLIER SELECTION FOR A PRODUCT FAMILY , 1999 .

[10]  Henry C. W. Lau,et al.  Multi-agent modeling of dispersed manufacturing networks , 1999 .

[11]  Manoj K. Malhotra,et al.  Operations Management: Processes and Value Chains , 2004 .

[12]  Fabrizio Salvador,et al.  Coordinating product design, process design, and supply chain design decisions: Part B. Coordinating approaches, tradeoffs, and future research directions , 2005 .

[13]  George Q. Huang,et al.  Integrated Configuration of Platform Products and Supply Chains for Mass Customization: A Game-Theoretic Approach , 2007, IEEE Transactions on Engineering Management.

[14]  Norman M. Sadeh,et al.  Distributed constrained heuristic search , 1991, IEEE Trans. Syst. Man Cybern..

[15]  J. Cooper,et al.  Managing Variety in Automotive Logistics With the Rule of Three , 1994 .

[16]  Krzysztof R. Apt,et al.  Logic Programming , 1990, Handbook of Theoretical Computer Science, Volume B: Formal Models and Sematics.

[17]  Bart L. MacCarthy,et al.  Managing product variety in multinational corporation supply chains , 2006 .

[18]  Thomas L. Saaty,et al.  Knapsack allocation of multiple resources in benefit-cost analysis by way of the analytic hierarchy process , 1993 .

[19]  Edward P. K. Tsang,et al.  Foundations of constraint satisfaction , 1993, Computation in cognitive science.

[20]  Pascal Van Hentenryck,et al.  Solving a Cutting-Stock Problem in Constraint Logic Programming , 1988, ICLP/SLP.

[21]  Charles H. Fine Clockspeed: Winning Industry Control In The Age Of Temporary Advantage , 1998 .

[22]  Walter Eversheim,et al.  Simultaneous engineering approach to an integrated design and process planning , 1997, Eur. J. Oper. Res..

[23]  Sriram Thirumalai,et al.  Customer satisfaction with order fulfillment in retail supply chains: implications of product type in electronic B2C transactions , 2005 .

[24]  Jiyin Liu,et al.  Addressing the gap in scheduling research: a review of optimization and heuristic methods in production scheduling , 1993 .

[25]  Ngai Kheong Ng,et al.  A domain-based reference model for the conceptualization of factory loading allocation problems in multi-site manufacturing supply chains , 2004 .

[26]  Gianluca Spina,et al.  A model of co-design relationships: definitions and contingencies , 2002, Int. J. Technol. Manag..

[27]  Fabrizio Salvador,et al.  Modularity, product variety, production volume and component sourcing: Theorizing beyond generic prescriptions , 2002 .

[28]  Charles H. Fine,et al.  Modeling tradeoffs in three-dimensional concurrent engineering: a goal programming approach , 2005 .

[29]  T. Davis Effective supply chain management , 2020, Strategic Direction.

[30]  Nam P. Suh,et al.  principles in design , 1990 .

[31]  R. V. Hoek,et al.  Postponed manufacturing: a case study in the food supply chain , 1997 .

[32]  Charu Chandra,et al.  Mass Customization: A Supply Chain Approach , 2004 .

[33]  Christopher S. Tang,et al.  Modelling the Costs and Benefits of Delayed Product Differentiation , 1997 .

[34]  Roy M. Turner,et al.  A Constraint-Based Approach to Assigning System Components to Tasks , 2004, Applied Intelligence.

[35]  Sebastian K. Fixson,et al.  Product architecture assessment: a tool to link product, process, and supply chain design decisions , 2005 .

[36]  Hau L. Lee,et al.  Hewlett-Packard Gains Control of Inventory and Service through Design for Localization , 1993 .

[37]  Jennifer Blackhurst,et al.  PCDM: a decision support modeling methodology for supply chain, product and process design decisions , 2005 .

[38]  D. Macbeth Emergent strategy in managing cooperative supply chain change , 2002 .

[39]  Irvin J. Lustig,et al.  Constraint Programming and Its Relationship to Mathematical Programming , 2001 .

[40]  R. Handfield,et al.  Supplier integration into new product development: coordinating product, process and supply chain design , 2005 .

[41]  Pascal Van Hentenryck Constraint satisfaction in logic programming , 1989, Logic programming.

[42]  M. Primo,et al.  An exploratory study of the effects of supplier relationships on new product development outcomes , 2002 .

[43]  Vaidyanathan Jayaraman,et al.  Transportation, facility location and inventory issues in distribution network design: An investigation , 1998 .

[44]  Alexander V. Smirnov,et al.  Configuring of Supply Chain Networks Based on Constraint Satisfaction, Genetic and Fuzzy Game Theoretic Approaches , 2002, BASYS.

[45]  John B. Houlihan International supply chain management , 1985 .

[46]  A Volgenant,et al.  A core approach to the 0–1 equality knapsack problem , 1998, J. Oper. Res. Soc..

[47]  Bowon Kim,et al.  Configuring a manufacturing firm's supply network with multiple suppliers , 2002 .

[48]  Mark S. Fox,et al.  Resource configuration and allocation-a case study of constrained heuristic search , 1992, IEEE Expert.

[49]  Sally C. Brailsford,et al.  The progressive party problem: Integer linear programming and constraint programming compared , 1995, Constraints.