Modeling of machine failures in a flexible manufacturing cell with two machines served by a robot

In this study, a stochastic model is developed to analyze performance measures of a flexible manufacturing cell (FMC) under different operational conditions, including machine failures and repairs. The FMC consists of two machines served by a robot for loading and loading purposes, and a pallet handling system. The model is based on Markov processes and determines closed-form solutions for the probabilities of system states that are used to calculate system performance measures, such as production output rate and utilizations of system components under different parametric conditions and equipment failures and repairs.

[1]  Ihsan Sabuncuoglu,et al.  Expert simulation systems—recent developments and applications in flexible manufacturing systems , 1989 .

[2]  Jim Hutchison,et al.  Scheduling approaches for random job shop flexible manufacturing systems , 1991 .

[3]  Kambiz Farahmand Using simulation to support implementation of flexible manufacturing cell , 2000, 2000 Winter Simulation Conference Proceedings (Cat. No.00CH37165).

[4]  Richard H. Choi,et al.  Evaluation of FMS parameters on overall system performance , 1988 .

[5]  K. Hitomi,et al.  Operations scheduling for work transportation by industrial robots in automated manufacturing systems , 1986 .

[6]  John J. Black,et al.  Simulation of complex manufacturing equipment reliability using object oriented methods , 1995 .

[7]  Amrik S. Sohal,et al.  A longitudinal study of a flexible manufacturing cell operation , 2001 .

[8]  Jinwoo Park,et al.  A Supervisory Control Approach for Execution Control of an FMC , 2001 .

[9]  Alessandro Agnetis,et al.  Part Batching and Scheduling in a Flexible Cell to Minimize Setup Costs , 2003, J. Sched..

[10]  David D. Bedworth,et al.  Design of a scheduling system for flexible manufacturing cells , 1990 .

[11]  Christos Koulamas A stochastic model for a machining cell with tool failure and tool replacement considerations , 1992, Comput. Oper. Res..

[12]  Randall P. Sadowski,et al.  Simulation with Arena , 1998 .

[13]  Mehmet Savsar,et al.  A stochastic model for the analysis of a two-machine flexible manufacturing cell , 2005, Comput. Ind. Eng..

[14]  David He,et al.  Analysis of sequential failures for assessment of reliability and safety of manufacturing systems , 2002, Reliab. Eng. Syst. Saf..

[15]  Fawaz Abdulmalek,et al.  SIMULATION OF TOOL CHANGE POLICIES IN A FLEXIBLE MANUFACTURING CELL , 2004 .

[16]  Mehmet Savsar Reliability analysis of a flexible manufacturing cell , 2000, Reliab. Eng. Syst. Saf..

[17]  Singiresu S Rao,et al.  Reliability analysis of complex systems using symbolic logic , 1993 .

[18]  B. Descotes-Genon,et al.  Analytical method to evaluate the dependability of manufacturing systems , 1997 .

[19]  Mehmet Savsar,et al.  Stochastic modelling and comparisons of two flexible manufacturing cells with single and double gripper robots , 1993 .