Hydrothermal Optimisation by Refinement of Step-Loading Schedules
暂无分享,去创建一个
Abstract A method is presented for the daily scheduling of hydrothermal power systems. Initially, hydro plant is committed by a step-loading schedule. Subsequently optimal load flow computations to schedule thermal generation and VAr allocation alternate with a gradient or Newton search to improve the hydro schedule. Realistic constraints are included.
[1] I Gusti Made Mantera. Optimal load scheduling of hydroelectric power stations. , 1972 .
[2] Robert J. Ringlee,et al. Susquehanna River Short-Range Hydrothermal Co-ordination , 1963 .
[3] William F. Tinney,et al. Optimal Power Flow Solutions , 1968 .