Production lot sizing with process deterioration and machine breakdown

Abstract The paper presents a generalized economic manufacturing quantity model for an unreliable production system in which the production facility may shift from an ‘in-control’ state to an ‘out-of-control’ state at any random time (when it starts producing defective items) and may ultimately break down afterwards. If a machine breakdown occurs during a production run, then corrective repair is done; otherwise, preventive repair is performed at the end of the production run to enhance the system reliability. The proposed model is formulated assuming that the time to machine breakdown, corrective and preventive repair times follow arbitrary probability distributions. However, the criteria for the existence and uniqueness of the optimal production time are derived under general breakdown and uniform repair time (corrective and preventive) distributions. The optimal production run time is determined numerically and the joint effect of process deterioration, machine breakdowns and repairs (corrective and preventive) on the optimal decisions is investigated for a numerical example.

[1]  Viliam Makis,et al.  An EMQ model with inspections and random machine failures , 1998, J. Oper. Res. Soc..

[2]  Tadashi Dohi,et al.  Exact formulation of stochastic EMQ model for an unreliable production system , 2004, J. Oper. Res. Soc..

[3]  Sheng-Tsaing Tseng,et al.  Optimal Preventive Maintenance Policy for Deteriorating Production Systems , 1996 .

[4]  Viliam Makis Optimal lot sizing and inspection policy for an EMQ model with imperfect inspections , 1998 .

[5]  M A Rahim,et al.  Joint determination of production quantity, inspection schedule, and quality control for an imperfect process with deteriorating products , 2001, J. Oper. Res. Soc..

[6]  Mohamed Ben-Daya,et al.  Note: The economic manufacturing lot-sizing problem with imperfect production processes: Bounds and optimal solutions , 1998 .

[7]  Meir J. Rosenblatt,et al.  Simultaneous determination of production cycle and inspection schedules in a production system , 1987 .

[8]  Syed Naveed Khursheed,et al.  Integrating quality and maintenance decisions in a production-inventory model for deteriorating items , 2005 .

[9]  A. Seidmann,et al.  Production lot sizing with machine breakdowns , 1992 .

[10]  Liliane Pintelon,et al.  Production Batching with Machine Breakdowns and Safety Stocks , 1992, Oper. Res..

[11]  Ki Ling Cheung,et al.  Joint determination of preventive maintenance and safety stocks in an unreliable production environment , 1997 .

[12]  Sheng-Tsaing Tseng,et al.  Optimal production run length for products sold with warranty , 2000, Eur. J. Oper. Res..

[13]  Bin Liu,et al.  Analysis of a production-inventory system with machine breakdowns and shutdowns , 1999 .

[14]  Tadashi Dohi,et al.  Optimal control of preventive maintenance schedule and safety stocks in an unreliable manufacturing environment , 2001 .

[15]  Tonya Boone,et al.  The Impact of Imperfect Processes on Production Run Times , 2000, Decis. Sci..

[16]  Kun-Jen Chung Bounds for production lot sizing with machine breakdowns , 1997 .

[17]  Mandyam M. Srinivasan,et al.  Production-Inventory Systems with Preventive Maintenance , 1996 .

[18]  Morton J. M. Posner,et al.  Production-Inventory Systems with Unreliable Machines , 1994, Oper. Res..

[19]  C. H. Kim,et al.  An optimal production run length in deteriorating production processes , 1999 .

[20]  Meir J. Rosenblatt,et al.  Economic Production Cycles with Imperfect Production Processes , 1986 .

[21]  Stephen Wolfram,et al.  The Mathematica Book , 1996 .

[22]  T.C.E. Cheng,et al.  An Economic Order Quantity Model with Demand-Dependent Unit Production Cost and Imperfect Production Processes , 1991 .

[23]  S. Tseng,et al.  THE EFFECTS OF INSPECTION ERRORS TO THE IMPERFECT EMQ MODEL , 1994 .

[24]  Meir J. Rosenblatt,et al.  A Production and Maintenance Planning Model with Restoration Cost Dependent on Detection Delay , 1989 .

[25]  Evan L. Porteus Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction , 1986, Oper. Res..