Benchmarking design‐build procurement systems in construction
暂无分享,去创建一个
Albert P.C. Chan | Edmond W.M. Lam | Daniel W.M. Chan | Edmond W. M. Lam | A. Chan | Daniel W. M. Chan
[1] Steven McCabe,et al. Benchmarking in Construction , 2001 .
[2] Akintola Akintoye,et al. Design and build: a survey of architects' views , 1995 .
[3] Y. C. Kog,et al. Critical Success Factors for Different Project Objectives , 1999 .
[4] Jürgen Hauschildt,et al. Realistic Criteria for Project Manager Selection and Development , 2000 .
[5] Neil N. Eldin. Concurrent engineering: A schedule reduction tool , 1997 .
[6] J. K. Yates. Use of Design/Build in E/C Industry , 1995 .
[7] Peter E.D. Love,et al. Partnering research in construction , 2000 .
[8] Nick Retherford. FEATURE: Project Delivery and the U.S. Department of State , 1998 .
[9] S. Rowlinson. Procurement Systems: the View from Hong Kong , 1997 .
[10] A. K. Munns,et al. The role of project management in achieving project success , 1996 .
[11] Anthony D. Songer,et al. PROJECT CHARACTERISTICS FOR SUCCESSFUL PUBLIC-SECTOR DESIGN-BUILD , 1997 .
[12] Michael C. Loulakis,et al. Design-Build: Planning Through Development , 2000 .
[13] Albert P.C. Chan,et al. Framework of Success Criteria for Design/Build Projects , 2002 .
[14] M. K. Parfitt,et al. Checklist of critical success factors for building projects , 1993 .
[15] Chau Kwong Wing,et al. The ranking of construction management journals , 1997 .
[16] Albert P.C. Chan. Evaluation of enhanced design and build system a case study of a hospital project , 2000 .
[17] Albert P.C. Chan,et al. Exploring Critical Success Factors for Partnering in Construction Projects , 2004 .
[18] Peter E.D. Love,et al. Selecting a suitable procurement method for a building project , 1998 .
[19] Ewm Lam,et al. Study of design-build projects in Hong Kong , 2001 .
[20] P. Olomolaiye,et al. An evaluation of clients' needs and responsibilities in the construction process , 1995 .
[21] C. S Lim,et al. Criteria of project success: an exploratory re-examination , 1999 .
[22] Chimay J. Anumba,et al. Establishing and processing client requirements—a key aspect of concurrent engineering in construction , 2000 .
[23] Albert P.C. Chan,et al. A Benchmark Model for Construction Duration in Public Housing Developments , 2003 .
[24] A. Akintoye. Design and build: a survey of construction contractors’ views , 1994 .
[25] D. Okpala. Evaluation and selection of construction projects in Nigeria , 1991 .
[26] Keith R. Molenaar,et al. PUBLIC-SECTOR DESIGN/BUILD EVOLUTION AND PERFORMANCE , 1999 .
[27] George Pitagorsky. The Project Manager/Functional Manager Partnership , 1998 .
[28] Anthony Walker,et al. Evaluation of project outcomes , 1998 .