Control Algorithm of Thyristor Dual Converter Power System for Railway Power Substations

A control algorithm of thyristor dual converter power system is proposed in this study for a railway power substation. The thyristor dual converter can use regenerative power without an additional system using control algorithm. An autonomous voltage and mode change method is also proposed to provide uninterrupted power to the railway. A 10 kW reduced model of the thyristor dual converter power system is built and tested to verify the validity of the proposed control algorithm.

[1]  Chung-Yuen Won,et al.  Regenerative Inverter System for DC Traction Substation with Voltage Drop Compensation Mode , 2008 .

[2]  Shui-Shong Lu,et al.  Microprocessor-Based Design of a Firing Circuit for Three-Phase Full-Wave Thyristor Dual Converter , 1982, IEEE Transactions on Industrial Electronics.

[3]  J. S. Oh,et al.  A novel control for four-quadrant operation of ITER VS converter , 2013, 2013 International Conference on Electrical Machines and Systems (ICEMS).

[4]  L.A. Schlabach,et al.  Analysis of discontinuous current in a 12 pulse thyristor DC motor drive , 1989, Conference Record of the IEEE Industry Applications Society Annual Meeting,.

[5]  Josep M. Guerrero,et al.  An Efficient Implementation of Generalized Delayed Signal Cancellation PLL , 2016, IEEE Transactions on Power Electronics.

[6]  Ziwen Yao,et al.  Fundamental phasor calculation with short delay , 2008, 2008 IEEE Power and Energy Society General Meeting - Conversion and Delivery of Electrical Energy in the 21st Century.