Introduction of a Digital Earthwork Construction Site

The concept of the “digital factory” has already been successfully implemented in the automotive and manufacturing industry. An adaption, following lean principles, to the construction site seems promising. Combining sensors, information technology, and approaches of Building information modeling (BIM) allows a cross-linking of construction machines and therefore offers a higher level of information transparency. This enables construction machines a faster way of discovering changes through the dynamics of the construction process (change of soil class, weather conditions, etc.). Higher transparency and reduced waste can lead not only to a higher utilization of one construction machine but also to a higher efficiency of the whole process chain by the related lean management methods. The collected information can also be used for a new and dynamic type of allocation of the construction machines based on a flexible Kanban system. An improved constructive cooperation and coordination (e.g. reduced waiting or unproductive times) ensures that potentials will be exploited and a value maximization achieved. This paper will show a theoretical model, based on expert interviews and stochastic simulations. It provides an estimation of the implementation cost and running expenses in comparison with the mentioned potential for optimization.

[1]  Christine Pasquire,et al.  Target value design: using collaboration and a lean approach to reduce construction cost , 2012 .

[2]  Fritz Gehbauer,et al.  Digital allocation of production factors in earth work construction , 2012 .

[3]  Chimay J. Anumba,et al.  Mobile ICT support for construction process improvement , 2006 .

[4]  Phillip S. Dunston,et al.  Identification of application areas for Augmented Reality in industrial construction based on technology suitability , 2008 .

[5]  Phillip S. Dunston,et al.  Factors in Productivity and Unit Cost for Advanced Machine Guidance , 2002 .

[6]  N. Dawood,et al.  CONSTRUCTION PLANNING PROCESS IMPROVEMENT USING INFORMATION TECHNOLOGY TOOLS , 2002 .

[7]  Baris Lostuvali,et al.  Lean Product Development at Cathedral Hill Hospital Project , 2012 .

[8]  Gregory Howell,et al.  Applying Last Planner in the Nigerian Construction Industry , 2012 .

[9]  Lauri Koskela,et al.  Visual management – A general overview , 2009 .

[10]  E. Brynjolfsson,et al.  Computing Productivity: Firm-Level Evidence , 2003, Review of Economics and Statistics.

[11]  Iris D. Tommelein,et al.  Improving Construction Work Flow – The Connective Role of Lookahead Planning , 2008 .

[12]  Umit Isikdag,et al.  Handbook of Research on Building Information Modeling and Construction Informatics: Concepts and Technologies , 2009 .

[13]  Charles M. Eastman,et al.  BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors , 2008 .

[14]  Christoph Runde,et al.  Augmented Reality for Construction Control , 2012, 2012 16th International Conference on Information Visualisation.

[15]  Gerhard Girmscheid,et al.  Leistungsermittlungshandbuch für Baumaschinen und Bauprozesse , 2010 .

[16]  Werner Stempfhuber 1D AND 3D SYSTEMS IN MACHINE AUTOMATION , 2006 .

[17]  Robert Owen,et al.  Interaction of Lean and Building Information Modeling in Construction , 2010 .

[18]  Jose L. Fernandez-Solis,et al.  The Idealization of an Integrated BIM, Lean, and Green Model (BLG) , 2010 .

[19]  Nashwan Dawood,et al.  Construction planning process improvement using information technology , 2000 .