Railway Infrastructure Maintenance - A Survey of Planning Problems and Conducted Research

Railway infrastructure maintenance consumes very large budgets, is complicated to organize and has numerous challenging planning problems. Specifically, the coordination with train traffic operatio ...

[1]  James A Ruffing AN ANALYSIS OF THE SCHEDULING OF WORK WINDOWS FOR RAILROAD TRACK MAINTENANCE GANGS , 1993 .

[2]  Dennis Huisman,et al.  Scheduling preventive railway maintenance activities , 2004, 2004 IEEE International Conference on Systems, Man and Cybernetics (IEEE Cat. No.04CH37583).

[3]  GustavssonEmil,et al.  Preventive maintenance scheduling of multi-component systems with interval costs , 2014 .

[4]  Baohua Mao,et al.  A bi-objective maintenance scheduling for power feeding substations in electrified railways , 2014 .

[5]  Luis Ferreira,et al.  Rail Track Maintenance Planning: An Assessment Model , 2000 .

[6]  Luca Podofillini,et al.  Risk-informed optimisation of railway tracks inspection and maintenance procedures , 2006, Reliab. Eng. Syst. Saf..

[7]  Masashi Miwa Mathematical Programming Model Analysis for the Optimal Track Maintenance Schedule , 2002 .

[8]  Enrico Zio,et al.  A Multi-State Monte Carlo Simulation Model of a Railway Network system , 2005 .

[9]  Fan Peng,et al.  Scheduling of track inspection and maintenance activities in railroad networks , 2011 .

[10]  Michael F. Gorman,et al.  Formulation and Solution Approaches to the Rail Maintenance Production Gang Scheduling Problem , 2010 .

[11]  J I Aspebakken,et al.  SERVICE MAINTENANCE PLANNING ON HIGH DENSITY, HEAVY HAUL TRAFFIC ROUTES , 1991 .

[12]  Masashi Miwa,et al.  Mathematical modeling analyses for obtaining an optimal railway track maintenance schedule , 2006 .

[13]  Yanfeng Ouyang,et al.  Track maintenance production team scheduling in railroad networks , 2012 .

[14]  Per Hokstad,et al.  RAMS Management of Railway Tracks , 2008 .

[15]  Tomas Lidén Survey of railway maintenance activities from a planning perspective and literature review concerning the use of mathematical algorithms for solving such planning and scheduling problems , 2014 .

[16]  Robert J Willis,et al.  Minimum Cost Maintenance in Heavy Haul Rail Track , 1983 .

[17]  Luis Ferreira,et al.  Modelling rail track deterioration and maintenance: current practices and future needs , 1997 .

[18]  Andrew Higgins Scheduling of railway track maintenance activities and crews , 1998, J. Oper. Res. Soc..

[19]  Amie Albrecht Integrating railway track maintenance and train timetables , 2009 .

[20]  Paulo Fonseca Teixeira,et al.  Availability Approach to Optimizing Railway Track Renewal Operations , 2013 .

[21]  S.-Y. Lin,et al.  Optimal track class assignment for a railroad network , 2013, J. Oper. Res. Soc..

[22]  Joseph M. Sussman,et al.  Track maintenance scheduling and its interactions with operations: Dedicated and mixed high-speed rail (HSR) scenarios , 2010 .

[23]  Jianmin Zhao,et al.  Optimizing Policies of Railway Ballast Tamping and Renewal , 2006 .

[24]  Ravindra K. Ahuja,et al.  Iterative algorithms for the curfew planning problem , 2011, J. Oper. Res. Soc..

[25]  Yung-Cheng Lai,et al.  Comprehensive Decision Support Framework for Strategic Railway Capacity Planning , 2011 .

[26]  António Ramos Andrade,et al.  A Bayesian model to assess rail track geometry degradation through its life-cycle , 2012 .

[27]  A. R. Jenema An optimization model for a Train-Free-Period planning for ProRail based on the maintenance needs of the Dutch railway infrastructure , 2011 .

[28]  Natashia Boland,et al.  Mixed integer programming based maintenance scheduling for the Hunter Valley coal chain , 2013, J. Sched..

[29]  John D. Andrews,et al.  Optimal Scheduling of Track Maintenance on a Railway Network , 2013, Qual. Reliab. Eng. Int..

[30]  Erhan Kozan,et al.  Heuristic Techniques for Scheduling Railway Track Maintenance , 2002 .

[31]  Andreas Fischer,et al.  A railway maintenance scheduling problem with customer costs , 2015, EURO J. Transp. Logist..

[32]  Xiang Liu,et al.  Optimization of ultrasonic rail-defect inspection for improving railway transportation safety and efficiency , 2014 .

[33]  D den Hertog,et al.  Optimal working zone division for safe track maintenance in The Netherlands. , 2005, Accident; analysis and prevention.

[34]  Dick den Hertog,et al.  The Netherlands Schedules Track Maintenance to Improve Track Workers' Safety , 2007, Interfaces.

[35]  Tin Kin Ho,et al.  Maintenance schedule optimisation for a railway power supply system , 2013 .

[36]  Yanfeng Ouyang,et al.  Optimal Clustering of Railroad Track Maintenance Jobs , 2014, Comput. Aided Civ. Infrastructure Eng..

[37]  E. Schnieder,et al.  Heuristic based track maintenance scheduling optimisation , 2011 .

[38]  Gabriella Budai-Balke Operations Research Models for Scheduling Railway Infrastructure Maintenance , 2002 .

[39]  Amie R. Albrecht,et al.  Rescheduling rail networks with maintenance disruptions using Problem Space Search , 2013, Comput. Oper. Res..

[40]  Ravindra K. Ahuja,et al.  Solving the Curfew Planning Problem , 2010, Transp. Sci..

[41]  Michael Burrow,et al.  A genetic-algorithm-based approach for scheduling the renewal of railway track components , 2009 .

[42]  Luís C. S. Ferreira,et al.  Planning Australian freight rail operations: An overview , 1997 .

[43]  Diego Klabjan,et al.  Strategic Gang Scheduling for Railroad Maintenance , 2012 .

[44]  Marc Antoni The ageing of signalling equipment and the impact on maintenance strategy , 2009, 2009 International Conference on Computers & Industrial Engineering.

[45]  Rui Calçada,et al.  Scheduling tamping through global optimization of maintenance costs , 2011 .

[46]  Luis Ferreira,et al.  MINIMISING COSTS IN SCHEDULING RAILWAY TRACK MAINTENANCE , 2000 .

[47]  Yanfeng Ouyang,et al.  A Heuristic Approach to the Railroad Track Maintenance Scheduling Problem , 2011, Comput. Aided Civ. Infrastructure Eng..

[48]  Hakan Guler,et al.  Decision Support System for Railway Track Maintenance and Renewal Management , 2013 .

[49]  P. Fonseca Teixeira,et al.  Biobjective Optimization Model for Maintenance and Renewal Decisions Related to Rail Track Geometry , 2011 .

[50]  Rui Calçada,et al.  Integer Programming to Optimize Tamping in Railway Tracks as Preventive Maintenance , 2012 .

[51]  Luis Ferreira,et al.  Minimising the Conflict Between Rail Operations and Infrastructure Maintenance , 2002 .

[52]  Michael Patriksson,et al.  Preventive maintenance scheduling of multi-component systems with interval costs , 2014, Comput. Ind. Eng..

[53]  Qing He,et al.  Track geometry defect rectification based on track deterioration modelling and derailment risk assessment , 2015, J. Oper. Res. Soc..

[54]  Natashia Boland,et al.  Scheduling arc maintenance jobs in a network to maximize total flow over time , 2014, Discret. Appl. Math..

[55]  Mark A. Turnquist,et al.  DYNAMIC MODEL FOR SCHEDULING MAINTENANCE OF TRANSPORTATION FACILITIES , 1985 .

[56]  Yanfeng Ouyang,et al.  Optimal routing and scheduling of periodic inspections in large-scale railroad networks , 2013, J. Rail Transp. Plan. Manag..

[57]  Kam-Pui Chow,et al.  Railway track possession assignment using constraint satisfaction , 1999 .

[58]  C. Meier-Hirmer Impact of preventive grinding on maintenance costs and determination of an optimal grinding cycle , 2008 .

[59]  Stephen Mayowa Famurewa Increased railway infrastructure capacity through improved maintenance practices , 2013 .

[60]  Michael Burrow,et al.  Reliability analysis and maintenance decision for railway sleepers using track condition information , 2007, J. Oper. Res. Soc..

[61]  Paulo Fonseca Teixeira,et al.  Optimisation model to schedule railway track renewal operations: a life-cycle cost approach , 2015 .

[62]  Cećılia Vale Application of a maintenance model for optimizing tamping on ballasted tracks: the influence of the model constraints , 2010 .

[63]  Sara Gestrelius,et al.  Maintaining tracks and traffic flow at the same time , 2013, J. Rail Transp. Plan. Manag..