Railway Infrastructure Maintenance - A Survey of Planning Problems and Conducted Research
暂无分享,去创建一个
[1] James A Ruffing. AN ANALYSIS OF THE SCHEDULING OF WORK WINDOWS FOR RAILROAD TRACK MAINTENANCE GANGS , 1993 .
[2] Dennis Huisman,et al. Scheduling preventive railway maintenance activities , 2004, 2004 IEEE International Conference on Systems, Man and Cybernetics (IEEE Cat. No.04CH37583).
[3] GustavssonEmil,et al. Preventive maintenance scheduling of multi-component systems with interval costs , 2014 .
[4] Baohua Mao,et al. A bi-objective maintenance scheduling for power feeding substations in electrified railways , 2014 .
[5] Luis Ferreira,et al. Rail Track Maintenance Planning: An Assessment Model , 2000 .
[6] Luca Podofillini,et al. Risk-informed optimisation of railway tracks inspection and maintenance procedures , 2006, Reliab. Eng. Syst. Saf..
[7] Masashi Miwa. Mathematical Programming Model Analysis for the Optimal Track Maintenance Schedule , 2002 .
[8] Enrico Zio,et al. A Multi-State Monte Carlo Simulation Model of a Railway Network system , 2005 .
[9] Fan Peng,et al. Scheduling of track inspection and maintenance activities in railroad networks , 2011 .
[10] Michael F. Gorman,et al. Formulation and Solution Approaches to the Rail Maintenance Production Gang Scheduling Problem , 2010 .
[11] J I Aspebakken,et al. SERVICE MAINTENANCE PLANNING ON HIGH DENSITY, HEAVY HAUL TRAFFIC ROUTES , 1991 .
[12] Masashi Miwa,et al. Mathematical modeling analyses for obtaining an optimal railway track maintenance schedule , 2006 .
[13] Yanfeng Ouyang,et al. Track maintenance production team scheduling in railroad networks , 2012 .
[14] Per Hokstad,et al. RAMS Management of Railway Tracks , 2008 .
[15] Tomas Lidén. Survey of railway maintenance activities from a planning perspective and literature review concerning the use of mathematical algorithms for solving such planning and scheduling problems , 2014 .
[16] Robert J Willis,et al. Minimum Cost Maintenance in Heavy Haul Rail Track , 1983 .
[17] Luis Ferreira,et al. Modelling rail track deterioration and maintenance: current practices and future needs , 1997 .
[18] Andrew Higgins. Scheduling of railway track maintenance activities and crews , 1998, J. Oper. Res. Soc..
[19] Amie Albrecht. Integrating railway track maintenance and train timetables , 2009 .
[20] Paulo Fonseca Teixeira,et al. Availability Approach to Optimizing Railway Track Renewal Operations , 2013 .
[21] S.-Y. Lin,et al. Optimal track class assignment for a railroad network , 2013, J. Oper. Res. Soc..
[22] Joseph M. Sussman,et al. Track maintenance scheduling and its interactions with operations: Dedicated and mixed high-speed rail (HSR) scenarios , 2010 .
[23] Jianmin Zhao,et al. Optimizing Policies of Railway Ballast Tamping and Renewal , 2006 .
[24] Ravindra K. Ahuja,et al. Iterative algorithms for the curfew planning problem , 2011, J. Oper. Res. Soc..
[25] Yung-Cheng Lai,et al. Comprehensive Decision Support Framework for Strategic Railway Capacity Planning , 2011 .
[26] António Ramos Andrade,et al. A Bayesian model to assess rail track geometry degradation through its life-cycle , 2012 .
[27] A. R. Jenema. An optimization model for a Train-Free-Period planning for ProRail based on the maintenance needs of the Dutch railway infrastructure , 2011 .
[28] Natashia Boland,et al. Mixed integer programming based maintenance scheduling for the Hunter Valley coal chain , 2013, J. Sched..
[29] John D. Andrews,et al. Optimal Scheduling of Track Maintenance on a Railway Network , 2013, Qual. Reliab. Eng. Int..
[30] Erhan Kozan,et al. Heuristic Techniques for Scheduling Railway Track Maintenance , 2002 .
[31] Andreas Fischer,et al. A railway maintenance scheduling problem with customer costs , 2015, EURO J. Transp. Logist..
[32] Xiang Liu,et al. Optimization of ultrasonic rail-defect inspection for improving railway transportation safety and efficiency , 2014 .
[33] D den Hertog,et al. Optimal working zone division for safe track maintenance in The Netherlands. , 2005, Accident; analysis and prevention.
[34] Dick den Hertog,et al. The Netherlands Schedules Track Maintenance to Improve Track Workers' Safety , 2007, Interfaces.
[35] Tin Kin Ho,et al. Maintenance schedule optimisation for a railway power supply system , 2013 .
[36] Yanfeng Ouyang,et al. Optimal Clustering of Railroad Track Maintenance Jobs , 2014, Comput. Aided Civ. Infrastructure Eng..
[37] E. Schnieder,et al. Heuristic based track maintenance scheduling optimisation , 2011 .
[38] Gabriella Budai-Balke. Operations Research Models for Scheduling Railway Infrastructure Maintenance , 2002 .
[39] Amie R. Albrecht,et al. Rescheduling rail networks with maintenance disruptions using Problem Space Search , 2013, Comput. Oper. Res..
[40] Ravindra K. Ahuja,et al. Solving the Curfew Planning Problem , 2010, Transp. Sci..
[41] Michael Burrow,et al. A genetic-algorithm-based approach for scheduling the renewal of railway track components , 2009 .
[42] Luís C. S. Ferreira,et al. Planning Australian freight rail operations: An overview , 1997 .
[43] Diego Klabjan,et al. Strategic Gang Scheduling for Railroad Maintenance , 2012 .
[44] Marc Antoni. The ageing of signalling equipment and the impact on maintenance strategy , 2009, 2009 International Conference on Computers & Industrial Engineering.
[45] Rui Calçada,et al. Scheduling tamping through global optimization of maintenance costs , 2011 .
[46] Luis Ferreira,et al. MINIMISING COSTS IN SCHEDULING RAILWAY TRACK MAINTENANCE , 2000 .
[47] Yanfeng Ouyang,et al. A Heuristic Approach to the Railroad Track Maintenance Scheduling Problem , 2011, Comput. Aided Civ. Infrastructure Eng..
[48] Hakan Guler,et al. Decision Support System for Railway Track Maintenance and Renewal Management , 2013 .
[49] P. Fonseca Teixeira,et al. Biobjective Optimization Model for Maintenance and Renewal Decisions Related to Rail Track Geometry , 2011 .
[50] Rui Calçada,et al. Integer Programming to Optimize Tamping in Railway Tracks as Preventive Maintenance , 2012 .
[51] Luis Ferreira,et al. Minimising the Conflict Between Rail Operations and Infrastructure Maintenance , 2002 .
[52] Michael Patriksson,et al. Preventive maintenance scheduling of multi-component systems with interval costs , 2014, Comput. Ind. Eng..
[53] Qing He,et al. Track geometry defect rectification based on track deterioration modelling and derailment risk assessment , 2015, J. Oper. Res. Soc..
[54] Natashia Boland,et al. Scheduling arc maintenance jobs in a network to maximize total flow over time , 2014, Discret. Appl. Math..
[55] Mark A. Turnquist,et al. DYNAMIC MODEL FOR SCHEDULING MAINTENANCE OF TRANSPORTATION FACILITIES , 1985 .
[56] Yanfeng Ouyang,et al. Optimal routing and scheduling of periodic inspections in large-scale railroad networks , 2013, J. Rail Transp. Plan. Manag..
[57] Kam-Pui Chow,et al. Railway track possession assignment using constraint satisfaction , 1999 .
[58] C. Meier-Hirmer. Impact of preventive grinding on maintenance costs and determination of an optimal grinding cycle , 2008 .
[59] Stephen Mayowa Famurewa. Increased railway infrastructure capacity through improved maintenance practices , 2013 .
[60] Michael Burrow,et al. Reliability analysis and maintenance decision for railway sleepers using track condition information , 2007, J. Oper. Res. Soc..
[61] Paulo Fonseca Teixeira,et al. Optimisation model to schedule railway track renewal operations: a life-cycle cost approach , 2015 .
[62] Cećılia Vale. Application of a maintenance model for optimizing tamping on ballasted tracks: the influence of the model constraints , 2010 .
[63] Sara Gestrelius,et al. Maintaining tracks and traffic flow at the same time , 2013, J. Rail Transp. Plan. Manag..