A method for the evaluation of suppliers’ co-design effort

Abstract A framework for the analysis and measurement of the support given by the supplier to the buyer's new product development activities is described. Having consulted the literature on best practices in product development, 14 criteria were individuated. This assessment framework was implemented and tested in a major company in the Northwest of Italy, which operates in the sector of Industrial Automation. The case study points out advantages and limitations of the proposed instrument.

[1]  אסתר טולידנו,et al.  מקבלי דמי אבטלה בשנת 1988 , 1989 .

[2]  Seyed Hassan Ghodsypour,et al.  A decision support system for supplier selection using an integrated analytic hierarchy process and linear programming , 1998 .

[3]  דבי עובדיה,et al.  חונכות ילדי אסירים , 1989 .

[4]  Rajan R. Kamath,et al.  A Second Look at Japanese Product Development , 1995 .

[5]  Benita M. Beamon,et al.  Measuring supply chain performance , 1999 .

[6]  יעקב צדקה,et al.  משפחתונים לקשישים בטבריה , 1991 .

[7]  Gary W. Dickson,et al.  AN ANALYSIS OF VENDOR SELECTION SYSTEMS AND DECISIONS , 1966 .

[8]  Keki R. Bhote Strategic supply management , 1989 .

[9]  W. M. Fruin The Japanese Enterprise System , 1994 .

[10]  T. Willis,et al.  Vendor Requirements and Evaluation in a Just‐In‐Time Environment , 1990 .

[11]  Leif Enarsson,et al.  Evaluation of suppliers: how to consider the environment , 1998 .

[12]  אסתר טולידנו,et al.  מקבלי דמי אבטלה בשנת 1993 , 1994 .

[13]  L. Ellram The Supplier Selection Decision in Strategic Partnerships , 1990 .

[14]  Hassan Abdalla Concurrent engineering for global manufacturing , 1999 .

[15]  John E. Ettlie,et al.  Integrated design and new product success , 1997 .

[16]  K. Clark Project scope and project performance: the effect of parts strategy and supplier involvement on product development , 1989 .

[17]  Laura M. Birou,et al.  International Purchasing: Benefits, Requirements, and Challenges , 1993 .

[18]  S. Dowlatshahi Purchasing's Role in a Concurrent Engineering Environment , 1992 .

[19]  Alberto De Toni,et al.  Operating Levels in Product and Process Design , 1991 .

[20]  אסתר טולידנו מקבלי דמי אבטלה בשנת 1989 , 1990 .

[21]  Edward N. Timmerman An Approach to Vendor Performance Evaluation , 1986 .

[22]  Lisa M. Ellram,et al.  A Structured Method for Applying Purchasing Cost Management Tools , 1996 .

[23]  M. Cusumano,et al.  Supplier relations and management: A survey of Japanese, Japanese-transplant, and U. S. auto plants , 1991 .

[24]  Guido Nassimbeni,et al.  Network structures and co‐ordination mechanisms: A taxonomy , 1998 .

[25]  B. G. Dale,et al.  The Role of Purchasing in Design: A Study in the British Defense Industry , 1993 .

[26]  S. Deshmukh,et al.  Vendor Selection Using Interpretive Structural Modelling (ISM) , 1994 .

[27]  Paul D. Cousins,et al.  Beyond vendor assessment: Relationship assessment programmes , 1996 .

[28]  A. Toni Buyer-supplier operational practices, sourcing policies and plant performances: Results of an empirical research , 1999 .

[29]  אסתר טולידנו,et al.  מקבלי דמי אבטלה בשנת 1987 , 1988 .

[30]  אסתר טולידנו מקבלי דמי אבטלה בשנת 1991 , 1992 .

[31]  C. O'Neal Concurrent Engineering with Early Supplier Involvement: A CrossFunctional Challenge , 1993 .

[32]  Christoph H. Loch,et al.  Measuring development performance in the electronics industry , 1996 .

[33]  Robert E. Gregory,et al.  Source Selection: A Matrix Approach , 1986 .

[34]  רבקה פריאור מקבלי דמי פגיעה, 1988 , 1990 .

[35]  W. Ouchi,et al.  JAPANESE-STYLE PARTNERSHIPS -- GIVING COMPANIES A COMPETITIVE EDGE. , 1993 .

[36]  A. Bonaccorsi,et al.  Strategic Partnerships in New Product Development: an Italian Case Study , 1994 .

[37]  רבקה פריאור,et al.  גמלאות נפגעי עבודה, 1989 , 1991 .

[38]  Alvin J. Williams,et al.  Purchasing's Role in Value Analysis: Lessons from Creative Problem Solving , 1992 .

[39]  Robert B. Handfield,et al.  Managing Component Life Cycles in Dynamic Technological Environments , 1994 .

[40]  דליה גורדון ותמר אליאב משפחות חד הוריות, 1991 , 1992 .

[41]  Paul Israel,et al.  The Sources of Innovation , 1990 .

[42]  תמר אליאב ולאה ענבר גמלאות אמהות 1990/91 , 1992 .

[43]  William R. Soukup,et al.  SUPPLIER SELECTION STRATEGIES , 1987 .

[44]  Barry Wilkinson,et al.  Buyer-supplier relations in the UK - automotive industry: Strategic implications of the Japanese manufacturing model , 1992 .

[45]  Vito Albino,et al.  FUZZY LOGIC IN VENDOR RATING: A COMPARISON BETWEEN A FUZZY LOGIC SYSTEM AND A NEURAL NETWORK , 1998 .

[46]  Alberto De Toni,et al.  Innovation in product development within the electronics industry , 1998 .

[47]  H. Maylor Concurrent new product development: an empirical assessment , 1997 .

[48]  Paul W. Briggs Vendor assessment for partners in supply , 1994 .

[49]  L. V. D. Wegen,et al.  Outranking methods in support of supplier selection , 1998 .

[50]  אסתר טולידנו,et al.  מקבלי דמי אבטלה בשנת 1990 , 1991 .

[51]  W. C. Benton,et al.  Vendor selection criteria and methods , 1991 .

[52]  A. Griffin PDMA Research on New Product Development Practices: Updating Trends and Benchmarking Best Practices , 1997 .

[53]  Michael Burda,et al.  Revolutionizing product development , 1993 .

[54]  דבי עובדיה,et al.  קו חירום לנשים מוכות , 1991 .