Comparison of DBR with CONWIP in a Production Line with Constant Processing Times
暂无分享,去创建一个
[1] Hayriye Ayhan,et al. Laplace Transform and Moments of Waiting Times in Poisson Driven (max,+) Linear Systems , 2001, Queueing Syst. Theory Appl..
[2] François Baccelli,et al. Expansions for steady-state characteristics of (max, +)-linear systems , 1998 .
[3] Hayriye Ayhan,et al. Tail probability of transient and stationary waiting times in (max, +)-linear systems , 2002, IEEE Trans. Autom. Control..
[4] Yuehwern Yih,et al. Generic kanban systems for dynamic environments , 1994 .
[5] D. C. Page,et al. Queuing network analysis approach for estimating the sizes of the time buffers in Theory of Constraints-controlled production systems , 2004 .
[6] T. Ye,et al. Determination of buffer sizes for drum–buffer–rope (DBR)-controlled production systems , 2008 .
[7] Hochang Lee,et al. Performance Evaluation of Kanban-Controlled Line Production Systems with Constant Processing Times , 2010 .
[8] John A. Muckstadt,et al. A comparison of alternative kanban control mechanisms. II. Experimental results , 1995 .
[9] Dong-Won Seo,et al. Comparison of CONWIP with Kanban in a Production Line with Constant Processing Times , 2011 .
[10] David L. Woodruff,et al. CONWIP: a pull alternative to kanban , 1990 .
[11] Zinovy D. Radovilsky. A quantitative approach to estimate the size of the time buffer in the theory of constraints , 1998 .
[12] F. Baccelli,et al. Taylor series expansions for Poisson-driven $(\max,+$)-linear systems , 1996 .
[13] B. Heidergott. Max-plus linear stochastic systems and perturbation analysis , 2006 .
[14] Heinrich Kuhn,et al. Analysis of production control systems kanban and CONWIP , 1996 .
[15] Michael A. Zazanis,et al. Push and Pull Production Systems: Issues and Comparisons , 1992, Oper. Res..
[16] John A. Muckstadt,et al. A comparison of alternative kanban control mechanisms. I. Background and structural results , 1995 .
[17] Larry M. Roderick,et al. A simulation study of CONWIP versus MRP at Westinghouse , 1994 .
[18] Shie-Gheun Koh,et al. Comparison of DBR with CONWIP in an unbalanced production line with three stations , 2004 .
[19] 신범철. A Comparative Analysis of Productivity Effects of R&D Investment between High-and Low-Tech Industries Using Dynamic Panel Data Model , 2010 .
[20] Volker Schmidt,et al. Transient and stationary waiting times in (max,+)-linear systems with Poisson input , 1997, Queueing Syst. Theory Appl..
[21] Wallace J. Hopp,et al. Characterizing the Output Process of a CONWIP Line with Deterministic Processing and Random Outages , 1993 .
[22] Yves Dallery,et al. Approximate analysis of production systems operated by a CONWIP/finite buffer hybrid control policy , 2000 .
[23] Wendell G. Gilland. A simulation study comparing performance of CONWIP and bottleneck-based release rules , 2002 .
[24] A. Huber,et al. Service-level performance of MRP, kanban, CONWIP and DBR due to parameter stability and environmental robustness , 2008 .
[25] C. Leake. Synchronization and Linearity: An Algebra for Discrete Event Systems , 1994 .