A robust fuzzy approach for constrained multi-product economic production quantity with imperfect items and rework process

ABSTRACT This paper aims to develop a robust multi-item EPQ formulation considering rework process and imperfect items. The mathematical model consists of two objective functions targeting minimization of total inventory costs and the total required warehouse space, respectively. Since, in real-world applications, parameters of the mathematical formulation are due to uncertainty, in this paper, Basic Chance Constraint Programming and Robust Fuzzy Chance Constraint Programming models are developed to handle uncertainties in both objective function and constraints. By solving examples, the superiority of the RFCCP over the BCCP model is showed and its ability to provide risk-averse solutions is ensured. Due to the nonlinearity of the RFCCP model and to provide the decision maker with the Pareto front, two algorithms, namely, Multi-Objective Grey Wolf Optimizer and Multi-Objective Water Cycle Algorithm, are used to optimize the decision variables. The performance of the algorithms is evaluated within different large-size test problems, using diversity, Spacing, number of non-dominated solutions and CPU-time. In the end, to investigate significant differences and to determine the best algorithm ANOVA test is implemented. In the end, we also offer new research directions, e.g. in terms of further ways of uncertainty modelling and risk management.

[1]  Soheyl Khalilpourazari,et al.  Multi-Objective Stochastic Fractal Search: a powerful algorithm for solving complex multi-objective optimization problems , 2019, Soft Computing.

[2]  Mir Saman Pishvaee,et al.  Novel robust fuzzy mathematical programming methods , 2016 .

[3]  Soheyl Khalilpourazari,et al.  Robust possibilistic programming for multi-item EOQ model with defective supply batches: Whale Optimization and Water Cycle Algorithms , 2019, Neural Computing and Applications.

[4]  Soheyl Khalilpourazari,et al.  Modeling and optimization of multi-item multi-constrained EOQ model for growing items , 2019, Knowl. Based Syst..

[5]  Soheyl Khalilpourazari,et al.  An efficient hybrid algorithm based on Water Cycle and Moth-Flame Optimization algorithms for solving numerical and constrained engineering optimization problems , 2017, Soft Computing.

[6]  Bhaba R. Sarker,et al.  Optimal manufacturing batch size with rework process at a single-stage production system , 2004, Comput. Ind. Eng..

[7]  Pradeep Jangir,et al.  Multi-objective ant lion optimizer: a multi-objective optimization algorithm for solving engineering problems , 2016, Applied Intelligence.

[8]  Soheyl Khalilpourazari,et al.  SCWOA: an efficient hybrid algorithm for parameter optimization of multi-pass milling process , 2018 .

[9]  Mosayeb Bornapour,et al.  Optimal coordinated design of UPFC and PSS for improving power system performance by using multi-objective water cycle algorithm , 2016 .

[10]  M. Pishvaee,et al.  A robust fuzzy possibilistic AHP approach for partner selection in international strategic alliance , 2018 .

[11]  Soheyl Khalilpourazari,et al.  Multi-objective optimization of multi-item EOQ model with partial backordering and defective batches and stochastic constraints using MOWCA and MOGWO , 2020, Oper. Res..

[12]  Ali Ghodratnama,et al.  Solving a deterministic multi product single machine EPQ model withpartial backordering, scrapped products and rework , 2018 .

[13]  Chun-Tao Chang,et al.  The EOQ with defective items and partially permissible delay in payments linked to order quantity derived algebraically , 2012, Central Eur. J. Oper. Res..

[14]  S. Papachristos,et al.  Economic ordering quantity models for items with imperfect quality , 2006 .

[15]  Vivek K. Patel,et al.  A multi-objective improved teaching-learning based optimization algorithm (MO-ITLBO) , 2016, Inf. Sci..

[16]  Mir Saman Pishvaee,et al.  A fuzzy robust programming approach to multi-objective portfolio optimisation problem under uncertainty , 2018, Int. J. Math. Oper. Res..

[17]  Tien-Yu Lin,et al.  An economic order quantity with imperfect quality and quantity discounts , 2010 .

[18]  H. Wee,et al.  An integrated production-inventory model with imperfect production processes and Weibull distribution deterioration under inflation , 2007 .

[19]  Reza Iravani,et al.  An interactive operation management of a micro-grid with multiple distributed generations using multi-objective uniform water cycle algorithm , 2016 .

[20]  Soheyl Khalilpourazari,et al.  Optimization of production time in the multi-pass milling process via a Robust Grey Wolf Optimizer , 2018, Neural Computing and Applications.

[21]  S. T. A. Niaki,et al.  Vendor Managed Inventory of a Single-vendor Multiple-retailer Single-warehouse Supply Chain under Stochastic Demands , 2014 .

[22]  Varun Punnathanam,et al.  Multi-objective optimal integration of biorefineries using NSGA-II and MOGWO , 2016, 2016 International Conference on Electrical, Electronics, and Optimization Techniques (ICEEOT).

[23]  Ahmed A. M. El-Gaafary,et al.  ENERGY MANAGEMENT WITH CAPACITOR PLACEMENT FOR ECONOMICS LOW CARBON EMISSIONS USING MODIFIED MULTI-OBJECTIVE GREY WOLF OPTIMIZER , 2015 .

[24]  Soheyl Khalilpourazari,et al.  A Robust Stochastic Fractal Search approach for optimization of the surface grinding process , 2018, Swarm Evol. Comput..

[25]  Shib Sankar Sana,et al.  An economic production quantity model with stochastic demand in an imperfect production system , 2011 .

[26]  Mir Saman Pishvaee,et al.  Robust possibilistic programming for socially responsible supply chain network design: A new approach , 2012, Fuzzy Sets Syst..

[27]  Adrijit Goswami,et al.  A fuzzy random EPQ model for imperfect quality items with possibility and necessity constraints , 2015, Appl. Soft Comput..

[28]  Mir Saman Pishvaee,et al.  Blood supply chain network design considering blood group compatibility under uncertainty , 2017, Int. J. Prod. Res..

[29]  Leopoldo Eduardo Cárdenas-Barrón Optimal manufacturing batch size with rework in a single-stage production system - A simple derivation , 2008, Comput. Ind. Eng..

[30]  MirjaliliSeyedali,et al.  Grasshopper optimization algorithm for multi-objective optimization problems , 2018 .

[31]  G. Ozdemir,et al.  An economic order quantity model with defective items and shortages , 2007 .

[32]  M. Mousazadeh,et al.  Health service network design: a robust possibilistic approach , 2018, Int. Trans. Oper. Res..

[33]  Arindum Mukhopadhyay,et al.  Economic production quantity models for imperfect items with pollution costs , 2014 .

[34]  S. K. Goyal,et al.  Economic ordering policy for an item with imperfect quality subject to the in-house inspection , 2007, Int. J. Syst. Sci..

[35]  Soheyl Khalilpourazari,et al.  Bi-objective optimization of multi-product EPQ model with backorders, rework process and random defective rate , 2016, 2016 12th International Conference on Industrial Engineering (ICIE).

[36]  R. H. Bhesdadiya,et al.  Optimal Power Flow Problem Solution Using Multi-objective Grey Wolf Optimizer Algorithm , 2018 .

[37]  Hui-Ming Wee,et al.  Multi-product production quantity model with repair failure and partial backordering , 2010, Comput. Ind. Eng..

[38]  Jonas C. P. Yu,et al.  Optimal inventory model for items with imperfect quality and shortage backordering , 2007 .

[39]  K. S. Chaudhuri,et al.  An economic order quantity model of imperfect quality items with partial backlogging , 2011, Int. J. Syst. Sci..

[40]  Yan-Chun Chen An optimal production and inspection strategy with preventive maintenance error and rework , 2013 .

[41]  Amir Abbas Najafi,et al.  A bi-objective model to optimize reliability and cost of system with a choice of redundancy strategies , 2012, Comput. Ind. Eng..

[42]  Maurice Bonney,et al.  An economic order quantity (EOQ) for items with imperfect quality and inspection errors , 2011 .

[43]  K. S. Chaudhuri,et al.  Optimal reliability, production lot size and safety stock in an imperfect production system , 2010, Int. J. Math. Oper. Res..

[44]  Andrew Lewis,et al.  Grey Wolf Optimizer , 2014, Adv. Eng. Softw..

[45]  Hui-Ming Wee,et al.  An alternative analysis and solution procedure for the EPQ model with rework process at a single-stage manufacturing system with planned backorders , 2013, Comput. Ind. Eng..

[46]  Mohammad Mohammadi,et al.  Minimizing makespan in a single machine scheduling problem with deteriorating jobs and learning effects , 2017, ICSCA '17.

[47]  Hung-Chi Chang,et al.  An application of fuzzy sets theory to the EOQ model with imperfect quality items , 2004, Comput. Oper. Res..

[48]  W. M. Chan,et al.  A new EPQ model: integrating lower pricing, rework and reject situations , 2003 .

[49]  Y. Chiu Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging , 2003 .

[50]  Ardeshir Bahreininejad,et al.  Water cycle algorithm - A novel metaheuristic optimization method for solving constrained engineering optimization problems , 2012 .

[51]  Mohammad Mohammadi,et al.  Mixed robust possibilistic flexible chance constraint optimization model for emergency blood supply chain network design , 2019, Ann. Oper. Res..

[52]  Seyed Taghi Akhavan Niaki,et al.  Optimizing a bi-objective multi-product EPQ model with defective items, rework and limited orders: NSGA-II and MOPSO algorithms , 2013 .

[53]  Leandro dos Santos Coelho,et al.  Multi-objective grey wolf optimizer: A novel algorithm for multi-criterion optimization , 2016, Expert Syst. Appl..

[54]  Masoud Rabbani,et al.  Capacitated Windy Rural Postman Problem with Several Vehicles: A Hybrid Multi-Objective Simulated Annealing Algorithm , 2016 .

[55]  Soheyl Khalilpourazari,et al.  Optimization of time, cost and surface roughness in grinding process using a robust multi-objective dragonfly algorithm , 2018, Neural Computing and Applications.

[56]  Seyed Mohammad Mirjalili,et al.  Multi-Verse Optimizer: a nature-inspired algorithm for global optimization , 2015, Neural Computing and Applications.

[57]  Mir Saman Pishvaee,et al.  A novel robust optimization approach for an integrated municipal water distribution system design under uncertainty: A case study of Mashhad , 2018, Comput. Chem. Eng..

[58]  B. Maddah,et al.  Disaggregation and consolidation of imperfect quality shipments in an extended EPQ model , 2012 .

[59]  K. Skouri,et al.  An EOQ model with backorders and rejection of defective supply batches , 2014 .

[60]  Jia-Tzer Hsu,et al.  An EOQ model with imperfect quality items, inspection errors, shortage backordering, and sales returns , 2013 .

[61]  Jia-Tzer Hsu,et al.  Economic production quantity (EPQ) models under an imperfect production process with shortages backordered , 2016, Int. J. Syst. Sci..

[62]  Mir Saman Pishvaee,et al.  A robust fuzzy stochastic programming model for the design of a reliable green closed-loop supply chain network , 2017 .

[63]  M. Jaber,et al.  Economic order quantity model for items with imperfect quality with learning in inspection , 2010 .

[64]  Soheyl Khalilpourazari,et al.  Optimization of closed-loop Supply chain network design: A Water Cycle Algorithm approach , 2016, 2016 12th International Conference on Industrial Engineering (ICIE).

[65]  Ali Sadollah,et al.  Water cycle algorithm for solving constrained multi-objective optimization problems , 2015, Appl. Soft Comput..

[66]  B. Maddah,et al.  Economic order quantity for items with imperfect quality: Revisited , 2008 .

[67]  M. K. Salameh,et al.  Economic production quantity model for items with imperfect quality , 2000 .

[68]  Seyedali Mirjalili,et al.  Dragonfly algorithm: a new meta-heuristic optimization technique for solving single-objective, discrete, and multi-objective problems , 2015, Neural Computing and Applications.

[69]  Hossam Faris,et al.  Grasshopper optimization algorithm for multi-objective optimization problems , 2017, Applied Intelligence.

[70]  B. Sarkar,et al.  An economic production quantity model with random defective rate, rework process and backorders for a single stage production system , 2014 .

[71]  Trong-The Nguyen,et al.  Robot Path Planning Optimization Based on Multiobjective Grey Wolf Optimizer , 2016, ICGEC.

[72]  Leopoldo Eduardo Cárdenas-Barrón,et al.  Economic production quantity with rework process at a single-stage manufacturing system with planned backorders , 2009, Comput. Ind. Eng..