Monitoring, control, and automation of large wind plants
暂无分享,去创建一个
General requirements for wind farm SCADA and supervisory control systems. Includes interfacing with the transmission system and wind farm balance of plant equipment, and monitoring and control requirements for individual wind turbine generators (WTGs). The current capabilities of GE's plant control system are also discussed.