An object-oriented, constraint-based heuristic for a class of passenger-train scheduling problems
暂无分享,去创建一个
[1] Philippe Baptiste. Disjunctive constraints for manufacturing scheduling: Principles and extensions , 1996 .
[2] Pascal Van Hentenryck,et al. A Generic Arc-Consistency Algorithm and its Specializations , 1992, Artif. Intell..
[3] A. I. Mees,et al. Railway scheduling by network optimization , 1991 .
[4] C. Le Pape,et al. Three mechanisms for managing resource constraints in a library for constraint-based scheduling , 1995 .
[5] Malachy Carey,et al. A model and strategy for train pathing with choice of lines, platforms, and routes , 1994 .
[6] A. J. Taylor,et al. A Structured Model for Rail Line Simulation and Optimization , 1982 .
[7] X. Cai,et al. A fast heuristic for the train scheduling problem , 1994, Comput. Oper. Res..
[8] Claude Le Pape,et al. Implementation of resource constraints in ILOG SCHEDULE: a library for the development of constraint-based scheduling systems , 1994 .