Criticality Analysis in Activity-on-Node Networks with Minimal Time Lags
暂无分享,去创建一个
[1] Miklós Hajdu. Network Scheduling Techniques for Construction Project Management , 1996 .
[2] Erik Demeulemeester,et al. Resource-constrained project scheduling: A survey of recent developments , 1998, Comput. Oper. Res..
[3] Klaus Neumann,et al. Heuristics for the minimum project-duration problem with minimal and maximal time lags under fixed resource constraints , 1995, J. Intell. Manuf..
[4] J. D. Wiest,et al. Precedence diagramming method: Some unusual characteristics and their implications for project managers , 1981 .
[5] J. D. Wiest,et al. A management guide to PERT/CPM: With GERT/PDM/DCPM and other networks , 1977 .
[6] Rolf H. Möhring,et al. Scheduling project networks with resource constraints and time windows , 1988 .
[7] Bert De Reyck,et al. A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations , 1998, Eur. J. Oper. Res..
[8] S. Elmaghraby,et al. The Analysis of Activity Networks Under Generalized Precedence Relations GPRs , 1992 .