Robust transmission network expansion planning considering non-convex operational constraints
暂无分享,去创建一个
Raquel García-Bertrand | Luis Baringo | Álvaro García-Cerezo | L. Baringo | R. García-Bertrand | Álvaro García-Cerezo
[1] Raquel García-Bertrand,et al. Dynamic Robust Transmission Expansion Planning , 2015, IEEE Transactions on Power Systems.
[2] Luis Baringo,et al. Representative Days for Expansion Decisions in Power Systems , 2019, ArXiv.
[3] Michel-Alexandre Cardin,et al. Towards more resilient integrated power grid capacity expansion: A robust optimization approach with operational flexibility , 2018 .
[4] Paolo Pisciella,et al. A time consistent risk averse three-stage stochastic mixed integer optimization model for power generation capacity expansion , 2016 .
[5] R. A. Jabr,et al. Robust Transmission Network Expansion Planning With Uncertain Renewable Generation and Loads , 2013, IEEE Transactions on Power Systems.
[6] Andrew Angus,et al. Multi-stage stochastic optimization framework for power generation system planning integrating hybrid uncertainty modelling , 2019, Energy Economics.
[7] John R. Birge,et al. Introduction to Stochastic Programming , 1997 .
[8] Jianhui Wang,et al. Further Discussions on Sufficient Conditions for Exact Relaxation of Complementarity Constraints for Storage-Concerned Economic Dispatch , 2015, ArXiv.
[9] William D'haeseleer,et al. Unit commitment constraints in long-term planning models: Relevance, pitfalls and the role of assumptions on flexibility , 2020 .
[10] Antonio J. Conejo,et al. Investment in Electricity Generation and Transmission: Decision Making under Uncertainty , 2016 .
[11] Mohammad Shahidehpour,et al. The IEEE Reliability Test System-1996. A report prepared by the Reliability Test System Task Force of the Application of Probability Methods Subcommittee , 1999 .
[12] Raquel García-Bertrand,et al. Robust Transmission Network Expansion Planning in Energy Systems: Improving Computational Performance , 2015, Eur. J. Oper. Res..
[13] Antonio J. Conejo,et al. Optimization in Engineering , 2017 .
[14] Luis Baringo,et al. A Stochastic Adaptive Robust Optimization Approach for the Generation and Transmission Expansion Planning , 2018, IEEE Transactions on Power Systems.
[15] Antonio J. Conejo,et al. Robust transmission expansion planning , 2015, Eur. J. Oper. Res..
[16] Antonio J. Conejo,et al. Electric Energy Systems : Analysis and Operation , 2008 .
[17] Sant Arora,et al. Performance comparison of Transmission Network Expansion Planning under deterministic and uncertain conditions , 2011 .
[18] Antonio J. Conejo,et al. Coordinated Investment in Transmission and Storage Systems Representing Long- and Short-Term Uncertainty , 2018, IEEE Transactions on Power Systems.
[19] Raquel García-Bertrand,et al. Robust Transmission Network Expansion Planning Under Correlated Uncertainty , 2015, IEEE Transactions on Power Systems.
[20] Pierre Pinson,et al. Do unit commitment constraints affect generation expansion planning? A scalable stochastic model , 2020, Energy Systems.
[21] Antonio J. Conejo,et al. A two-stage stochastic optimization planning framework to decarbonize deeply electric power systems , 2019, Energy Economics.
[22] L. L. Garver,et al. Transmission Network Estimation Using Linear Programming , 1970 .
[23] Nima Amjady,et al. Robust Transmission and Energy Storage Expansion Planning in Wind Farm-Integrated Power Systems Considering Transmission Switching , 2016, IEEE Transactions on Sustainable Energy.
[24] Cesar A. Silva-Monroy,et al. Co-Planning of Investments in Transmission and Merchant Energy Storage , 2018, IEEE Transactions on Power Systems.
[25] Siyuan Wang,et al. Robust Co-Planning of Energy Storage and Transmission Line With Mixed Integer Recourse , 2019, IEEE Transactions on Power Systems.
[26] Natalia Alguacil,et al. On the Use of a Convex Model for Bulk Storage in MIP-Based Power System Operation and Planning , 2020, IEEE Transactions on Power Systems.
[27] V. J. Rayward-Smith,et al. Fuzzy Cluster Analysis: Methods for Classification, Data Analysis and Image Recognition , 1999 .
[28] Bryan Palmintier,et al. Impact of operational flexibility on electricity generation planning with renewable and carbon targets , 2016, 2016 IEEE Power and Energy Society General Meeting (PESGM).
[29] Antonio J. Conejo,et al. Correlated wind-power production and electric load scenarios for investment decisions , 2013 .
[30] Long Zhao,et al. Solving two-stage robust optimization problems using a column-and-constraint generation method , 2013, Oper. Res. Lett..
[31] Richard E. Rosenthal,et al. GAMS -- A User's Guide , 2004 .