Design considerations for formwork in multistorey concrete buildings
暂无分享,去创建一个
[1] Jacob Field. Concrete Formwork Failures , 1975 .
[2] Wai-Fah Chen,et al. Effects of Fast Construction Rate on Deflections of R.C. Buildings , 1988 .
[3] Paul Grundy,et al. Construction Loads on Slabs with Shored Formwork in Multistory Buildings , 1963 .
[4] N. J. Gardner,et al. Comparison of Preshore and Reshore Procedures for Flat Slabs , 1986 .
[5] Mark D. Bowman,et al. Construction Load Analysis for Concrete Structures , 1985 .
[6] Wai-Fah Chen,et al. COMPUTERS IN CONCRETE CONSTRUCTION. ANALYSIS OF CONSTRUCTION LOADS ON SLABS AND SHORES BY PERSONAL COMPUTER , 1988 .
[7] Mark D. Bowman,et al. Shore-slab interaction in concrete buildings , 1986 .
[8] J. M. Shilstone. Evaluating Concrete Potential and Performance , 1988 .
[9] Fabian C. Hadipriono,et al. Analysis of Causes of Falsework Failures in Concrete Structures , 1986 .
[10] H. S. Lew. Safety during construction of concrete buildings : a status report , 1976 .
[11] N. J. Gardner. Shoring, Reshoring, and Safety , 1985 .