Major obstacles to improving the performance of waste management in China's construction industry
暂无分享,去创建一个
[1] Vivian W. Y Tam,et al. An investigation of construction wastes: an empirical study in Shenzhen , 2008 .
[2] François Buyle-Bodin,et al. Building waste management in Bulgaria: challenges and opportunities. , 2003, Waste management.
[3] Vivian W. Y Tam,et al. Use of Prefabrication to Minimize Construction Waste - A Case Study Approach , 2005 .
[4] Akintola Akintoye,et al. Analysis of factors influencing project cost estimating practice , 2000 .
[5] J. Hair. Multivariate data analysis , 1972 .
[6] Bernadette O’Regan,et al. A model for assessing the economic viability of construction and demolition waste recycling—the case of Ireland , 2006 .
[7] Martin Loosemore,et al. A theory of waste behaviour in the construction industry , 2001 .
[8] Ali Touran,et al. An analysis of cost and duration for deconstruction and demolition of residential buildings in Massachusetts , 2005 .
[9] P. Graham,et al. Employee perceptions of the solid waste management system operating in a large Australian contracting organization: implications for company policy implementation , 2000 .
[10] Zhen Chen,et al. An application of bar-code system for reducing construction wastes , 2002 .
[11] Ann T. W. Yu,et al. On-site sorting of construction and demolition waste in Hong Kong , 2001 .
[12] J.L. Hao,et al. A simulation model using system dynamic method for construction and demolition waste management in Hong Kong , 2007 .
[13] Vassilios Karavezyris. Report: Treatment of commercial, construction and demolition waste in North Rhine-Westphalia: policy-making and operation options , 2007, Waste management & research : the journal of the International Solid Wastes and Public Cleansing Association, ISWA.
[14] M. J. Norušis,et al. SPSS 13.0 Guide to Data Analysis , 2000 .
[15] Vivian W Y Tam,et al. Cross-cultural comparison of concrete recycling decision-making and implementation in construction industry. , 2010, Waste management.
[16] Vivian W. Y Tam,et al. Controlling construction waste by implementing governmental ordinances in Hong Kong , 2007 .
[17] Vivian W. Y Tam,et al. Research on management measures for reducing construction waste , 2004 .
[18] Vivian W Y Tam,et al. On the effectiveness in implementing a waste-management-plan method in construction. , 2008, Waste management.
[19] Albert P.C. Chan,et al. Development of a partnering performance index (PPI) for construction projects in Hong Kong: a Delphi study , 2007 .
[20] George Ofori,et al. Building waste assessment score: design-based tool , 2004 .
[21] Weisheng Lu,et al. Exploring critical success factors for waste management in construction projects of China , 2010 .
[22] Andrew D.F. Price,et al. Architect and contractor attitudes to waste minimisation , 2006 .
[23] Nabil Kartam,et al. Environmental management of construction and demolition waste in Kuwait. , 2004, Waste management.
[24] Hjh Jos Brouwers,et al. Construction Waste: Quantification and Source Evaluation , 1996 .
[25] Vivian W. Y Tam,et al. Implementation of environmental management in the Hong Kong construction industry , 2002 .
[26] Jiayuan Wang,et al. Factors affecting contractors’ risk attitudes in construction projects: Case study from China , 2011 .
[27] E. R. Skoyles,et al. Materials wastage – a misuse of resources , 1976 .
[28] Vivian W. Y Tam,et al. Economic comparison of concrete recycling : a case study approach , 2008 .
[29] John Saunders,et al. Attitudes towards waste minimisation amongst labour only sub‐contractors , 2004 .
[30] Ann T. W. Yu,et al. Comparison of low‐waste building technologies adopted in public and private housing projects in Hong Kong , 2003 .
[31] Charles J. Kibert,et al. Strategies for successful construction and demolition waste recycling operations , 1997 .
[32] Chi Sun Poon,et al. Reducing building waste at construction sites in Hong Kong , 2004 .
[33] Y. Y. Ling,et al. Reusing timber formwork: importance of workmen’s efficiency and attitude , 2000 .
[34] A Craighill,et al. A lifecycle assessment and evaluation of construction and demolition waste , 1999 .
[35] Weisheng Lu,et al. Critical success factors for on-site sorting of construction waste: A china study , 2010 .
[36] Corrie Clark,et al. A Review of Construction and Demolition Debris Regulations in the United States , 2006 .
[37] Vivian W. Y Tam,et al. Waste reduction through incentives: a case study , 2008 .
[38] Dilanthi Amaratunga,et al. Attitudes and perceptions of construction workforce on construction waste in Sri Lanka , 2006 .
[39] C. M. Tam,et al. Mapping Approach for Examining Waste Management on Construction Sites , 2004 .
[40] Guinevere Gilbert,et al. Improving solid waste reduction and recycling performance using goal setting and feedback , 2001 .
[41] Rawshan Ara Begum,et al. Implementation of waste management and minimisation in the construction industry of Malaysia , 2007 .
[42] Chi Sun Poon,et al. Sustainable construction aspects of using prefabrication in dense urban environment: a Hong Kong case study , 2008 .
[43] M Osmani,et al. Architects' perspectives on construction waste reduction by design. , 2008, Waste management.
[44] Shabbir H Gheewala,et al. Estimation of construction waste generation and management in Thailand. , 2009, Waste management.