Transition and connection design of berths ~#5~~#7 with the existing structures at Mawan Port Area,Shenzhen Port

By analyzing and summarizing the technical principles,influential factors,main countermeasures,engineering advantages and disadvantages in transition and connection design of berths #5~#7 with the existing structures at Mawan Port Area,Shenzhen Port,critical issues including structure,geology,and supplementary borehole data,etc,are put forward to provide a reference for similar design.