Capital Cost Assessment for Total Site Power Cogeneration

Industrial regions consume large amounts of energy. A lot of research effort is targeted at improving energy efficiency. Heat recovery on Total Site level can provide a considerably high potential for energy saving for industrial areas. It offers opportunities for heat recovery and cogeneration in addition to individual processes. This work deals with estimation of capital cost for power co-generation, evaluating the potential steam turbine placement for various steam pressure levels. The methodology uses the basic principles of Total Site Integration and adds estimation of capital cost for steam turbines with different capacity, inlet and outlet of steam pressure. It also allows evaluating the trade-off between capital cost and energy consumption for the Total Site Integration.

[1]  S. Ahmad,et al.  Total site heat integration using the utility system , 1994 .

[2]  Andreas Poullikkas Operating cost and water economy of mixed air steam turbines , 2005 .

[3]  Robin Smith,et al.  Top-level analysis of site utility systems , 2004 .

[4]  Robin Smith,et al.  Cogeneration targeting for site utility systems , 2012 .

[5]  Robin Smith,et al.  Chemical Process: Design and Integration , 2005 .

[6]  Luis Puigjaner,et al.  Targeting and design methodology for reduction of fuel, power and CO2 on total sites , 1997 .

[7]  John G. Brisson,et al.  Targeting the optimum steam system for power generation with increased flexibility in the steam powe , 2011 .

[8]  Zhigang Shang,et al.  A transhipment model for the optimisation of steam levels of total site utility system for multiperiod operation , 2004, Comput. Chem. Eng..

[9]  Jiří Jaromír Klemeš,et al.  Heat integration including heat exchangers, combined heat and power, heat pumps, separation processes and process control , 2012 .

[10]  Alberto Mirandola,et al.  On the operation strategy of steam power plants working at variable load: Technical and economic issues , 2012 .

[11]  Igor Bulatov,et al.  Sustainability in the Process Industry: Integration and Optimization , 2010 .

[12]  Peter Glavič,et al.  Process integration of a steam turbine , 2003 .

[13]  Jiří Jaromír Klemeš,et al.  Total Site targeting with process specific minimum temperature difference (ΔTmin) , 2012 .

[14]  Mikhail Sorin,et al.  A new thermodynamic model for shaftwork targeting on total sites , 2005 .

[15]  Stanislav Boldyryev,et al.  Capital Cost Targeting of Total Site Heat Recovery , 2012 .

[16]  Hiroyuki Kimura,et al.  R-Curve Concept and Its Application for Industrial Energy Management , 2000 .

[17]  P. S. Agachi,et al.  Integration of Process Site Utility Systems , 2007 .