Energy-efficient multi-objective scheduling algorithm for hybrid flow shop with fuzzy processing time

Increasing costs of energy and environmental pollution is prompting scholars to pay close attention to energy-efficient scheduling. This study constructs a multi-objective model for the hybrid flow shop scheduling problem with fuzzy processing time to minimize total weighted delivery penalty and total energy consumption simultaneously. Setup times are considered as sequence-dependent, and in-stage parallel machines are unrelated in this model, meticulously reflecting the actual energy consumption of the system. First, an energy-efficient bi-objective differential evolution algorithm is developed to solve this mixed integer programming model effectively. Then, we utilize an Nawaz-Enscore-Ham-based hybrid method to generate high-quality initial solutions. Neighborhoods are thoroughly exploited with a leader solution challenge mechanism, and global exploration is highly improved with opposition-based learning and a chaotic search strategy. Finally, problems in various scales evaluate the performance of this green scheduling algorithm. Computational experiments illustrate the effectiveness of the algorithm for the proposed model within acceptable computational time.

[1]  Arianna Alfieri,et al.  Workload simulation and optimisation in multi-criteria hybrid flowshop scheduling: a case study , 2009 .

[2]  Pascal Bouvry,et al.  Improving Classical and Decentralized Differential Evolution With New Mutation Operator and Population Topologies , 2011, IEEE Transactions on Evolutionary Computation.

[3]  Dug Hun Hong,et al.  AN EASY COMPUTATION OF MIN AND MAX OPERATIONS FOR FUZZY NUMBERS , 2006 .

[4]  Wenxin Liu,et al.  A neural network model and algorithm for the hybrid flow shop scheduling problem in a dynamic environment , 2005, J. Intell. Manuf..

[5]  Jin Yi-hui Advances in the Study on Hybrid Flow-shop Scheduling , 2011 .

[6]  E. L. Ulungu,et al.  MOSA method: a tool for solving multiobjective combinatorial optimization problems , 1999 .

[7]  Makoto Fujishima,et al.  A study on energy efficiency improvement for machine tools , 2011 .

[8]  Adriana Giret,et al.  Energy-efficient scheduling for a flexible flow shop using an improved genetic-simulated annealing algorithm , 2013 .

[9]  Savas Balin,et al.  Parallel machine scheduling with fuzzy processing times using a robust genetic algorithm and simulation , 2011, Information Sciences.

[10]  A. Isaksson,et al.  Scheduling and energy - Industrial challenges and opportunities , 2015, Comput. Chem. Eng..

[11]  Guo-Sheng Liu,et al.  Minimizing energy consumption and tardiness penalty for fuzzy flow shop scheduling with state-dependent setup time , 2017 .

[12]  Jianbin Qiu,et al.  A Novel Approach to Reliable Output Feedback Control of Fuzzy-Affine Systems With Time Delays and Sensor Faults , 2017, IEEE Transactions on Fuzzy Systems.

[13]  Mitsuo Gen,et al.  Embedding ant system in genetic algorithm for re-entrant hybrid flow shop scheduling problems with time window constraints , 2017, J. Intell. Manuf..

[14]  Tzung-Pei Hong,et al.  Fuzzy flexible flow shops at two machine centers for continuous fuzzy domains , 2000, Information Sciences.

[15]  Joaquín B. Ordieres Meré,et al.  Optimizing the production scheduling of a single machine to minimize total energy consumption costs , 2014 .

[16]  Jinwoo Park,et al.  Optimization of production scheduling with time-dependent and machine-dependent electricity cost for industrial energy efficiency , 2013 .

[17]  Hui Wang,et al.  A new cuckoo search algorithm with hybrid strategies for flow shop scheduling problems , 2016, Soft Computing.

[18]  Hadi Mokhtari,et al.  An energy-efficient multi-objective optimization for flexible job-shop scheduling problem , 2017, Comput. Chem. Eng..

[19]  Hamid Reza Karimi,et al.  Fuzzy-Affine-Model-Based Memory Filter Design of Nonlinear Systems With Time-Varying Delay , 2018, IEEE Transactions on Fuzzy Systems.

[20]  Rainer Storn,et al.  Differential Evolution – A Simple and Efficient Heuristic for global Optimization over Continuous Spaces , 1997, J. Glob. Optim..

[21]  James C. Bean,et al.  Genetic Algorithms and Random Keys for Sequencing and Optimization , 1994, INFORMS J. Comput..

[22]  Axel Tuma,et al.  Energy-efficient scheduling in manufacturing companies: A review and research framework , 2016, Eur. J. Oper. Res..

[23]  Peng-Jen Lai,et al.  Evaluate the fuzzy completion times in the fuzzy flow shop scheduling problems using the virus-evolutionary genetic algorithms , 2011, Appl. Soft Comput..

[24]  René Thomsen,et al.  A comparative study of differential evolution, particle swarm optimization, and evolutionary algorithms on numerical benchmark problems , 2004, Proceedings of the 2004 Congress on Evolutionary Computation (IEEE Cat. No.04TH8753).

[25]  Laine Mears,et al.  Energy, economy, and environment analysis and optimization on manufacturing plant energy supply system , 2016 .

[26]  H. Abbass The self-adaptive Pareto differential evolution algorithm , 2002, Proceedings of the 2002 Congress on Evolutionary Computation. CEC'02 (Cat. No.02TH8600).

[27]  Richard F. Hartl,et al.  A metaheuristic optimization approach for a real-world stochastic flexible flow shop problem with limited buffer , 2013 .

[28]  Min Dai,et al.  Energy-efficient dynamic scheduling for a flexible flow shop using an improved particle swarm optimization , 2016, Comput. Ind..

[29]  Bing-Hai Zhou,et al.  Multi-objective optimization of material delivery for mixed model assembly lines with energy consideration , 2018, Journal of Cleaner Production.

[30]  Rubén Ruiz,et al.  The hybrid flow shop scheduling problem , 2010, Eur. J. Oper. Res..

[31]  John W. Sutherland,et al.  Flow shop scheduling with peak power consumption constraints , 2013, Ann. Oper. Res..

[32]  Inyong Ham,et al.  A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem , 1983 .

[33]  John W. Sutherland,et al.  A new approach to scheduling in manufacturing for power consumption and carbon footprint reduction , 2011 .

[34]  Yuyan Han,et al.  Efficient multi-objective optimization algorithm for hybrid flow shop scheduling problems with setup energy consumptions , 2018 .

[35]  Christoph Herrmann,et al.  Global manufacturing and the embodied energy of products , 2010 .

[36]  S.M.T. Fatemi Ghomi,et al.  Hybrid flow shop scheduling with sequence dependent family setup time and uncertain due dates , 2014 .

[37]  Michael S. Salvador,et al.  A Solution to a Special Class of Flow Shop Scheduling Problems , 1973 .

[38]  Mehmet Fatih Tasgetiren,et al.  A discrete differential evolution algorithm for single machine total weighted tardiness problem with sequence dependent setup times , 2008, IEEE Congress on Evolutionary Computation.

[39]  Ying Wang,et al.  An adaptive chaotic differential evolution for the short-term hydrothermal generation scheduling problem , 2010 .

[40]  Ju-Yong Lee,et al.  A Two-Stage Assembly-Type Flowshop Scheduling Problem for Minimizing Total Tardiness , 2016 .

[41]  Chandrasekharan Rajendran,et al.  Scheduling in n-job, m-stage flowshop with parallel processors to minimize makespan , 1992 .

[42]  Salwani Abdullah,et al.  Fuzzy job-shop scheduling problems: A review , 2014, Inf. Sci..

[43]  Tadeusz Sawik,et al.  Mixed integer programming for scheduling flexible flow lines with limited intermediate buffers , 2000 .

[44]  Jinxing Xie,et al.  Minimum deviation algorithm for two-stageno-wait flowshops with parallel machines , 2004 .

[45]  Moon Sik Jeong,et al.  Simulation Study on Miscibility Effect of CO2/Solvent Injection for Enhanced Oil Recovery at Nonisothermal Conditions , 2016 .

[46]  Kamran Kianfar,et al.  Study of stochastic sequence-dependent flexible flow shop via developing a dispatching rule and a hybrid GA , 2012, Eng. Appl. Artif. Intell..

[47]  Hamid R. Tizhoosh,et al.  Opposition-Based Learning: A New Scheme for Machine Intelligence , 2005, International Conference on Computational Intelligence for Modelling, Control and Automation and International Conference on Intelligent Agents, Web Technologies and Internet Commerce (CIMCA-IAWTIC'06).

[48]  Didier Dubois,et al.  Fuzzy scheduling: Modelling flexible constraints vs. coping with incomplete knowledge , 2003, Eur. J. Oper. Res..

[49]  Wang Shengyao An artificial bee colony algorithm for solving hybrid flow-shop scheduling problem with unrelated parallel machines , 2012 .

[50]  Jatinder N. D. Gupta,et al.  Two-Stage, Hybrid Flowshop Scheduling Problem , 1988 .

[51]  Dong-Ho Lee,et al.  Scheduling algorithms for remanufacturing systems with parallel flow-shop-type reprocessing lines , 2015 .

[52]  Janet M. Twomey,et al.  Operational methods for minimization of energy consumption of manufacturing equipment , 2007 .

[53]  George Q. Huang,et al.  Hybrid flow shop scheduling considering machine electricity consumption cost , 2013 .