Energy-efficient multi-objective scheduling algorithm for hybrid flow shop with fuzzy processing time
暂无分享,去创建一个
[1] Arianna Alfieri,et al. Workload simulation and optimisation in multi-criteria hybrid flowshop scheduling: a case study , 2009 .
[2] Pascal Bouvry,et al. Improving Classical and Decentralized Differential Evolution With New Mutation Operator and Population Topologies , 2011, IEEE Transactions on Evolutionary Computation.
[3] Dug Hun Hong,et al. AN EASY COMPUTATION OF MIN AND MAX OPERATIONS FOR FUZZY NUMBERS , 2006 .
[4] Wenxin Liu,et al. A neural network model and algorithm for the hybrid flow shop scheduling problem in a dynamic environment , 2005, J. Intell. Manuf..
[5] Jin Yi-hui. Advances in the Study on Hybrid Flow-shop Scheduling , 2011 .
[6] E. L. Ulungu,et al. MOSA method: a tool for solving multiobjective combinatorial optimization problems , 1999 .
[7] Makoto Fujishima,et al. A study on energy efficiency improvement for machine tools , 2011 .
[8] Adriana Giret,et al. Energy-efficient scheduling for a flexible flow shop using an improved genetic-simulated annealing algorithm , 2013 .
[9] Savas Balin,et al. Parallel machine scheduling with fuzzy processing times using a robust genetic algorithm and simulation , 2011, Information Sciences.
[10] A. Isaksson,et al. Scheduling and energy - Industrial challenges and opportunities , 2015, Comput. Chem. Eng..
[11] Guo-Sheng Liu,et al. Minimizing energy consumption and tardiness penalty for fuzzy flow shop scheduling with state-dependent setup time , 2017 .
[12] Jianbin Qiu,et al. A Novel Approach to Reliable Output Feedback Control of Fuzzy-Affine Systems With Time Delays and Sensor Faults , 2017, IEEE Transactions on Fuzzy Systems.
[13] Mitsuo Gen,et al. Embedding ant system in genetic algorithm for re-entrant hybrid flow shop scheduling problems with time window constraints , 2017, J. Intell. Manuf..
[14] Tzung-Pei Hong,et al. Fuzzy flexible flow shops at two machine centers for continuous fuzzy domains , 2000, Information Sciences.
[15] Joaquín B. Ordieres Meré,et al. Optimizing the production scheduling of a single machine to minimize total energy consumption costs , 2014 .
[16] Jinwoo Park,et al. Optimization of production scheduling with time-dependent and machine-dependent electricity cost for industrial energy efficiency , 2013 .
[17] Hui Wang,et al. A new cuckoo search algorithm with hybrid strategies for flow shop scheduling problems , 2016, Soft Computing.
[18] Hadi Mokhtari,et al. An energy-efficient multi-objective optimization for flexible job-shop scheduling problem , 2017, Comput. Chem. Eng..
[19] Hamid Reza Karimi,et al. Fuzzy-Affine-Model-Based Memory Filter Design of Nonlinear Systems With Time-Varying Delay , 2018, IEEE Transactions on Fuzzy Systems.
[20] Rainer Storn,et al. Differential Evolution – A Simple and Efficient Heuristic for global Optimization over Continuous Spaces , 1997, J. Glob. Optim..
[21] James C. Bean,et al. Genetic Algorithms and Random Keys for Sequencing and Optimization , 1994, INFORMS J. Comput..
[22] Axel Tuma,et al. Energy-efficient scheduling in manufacturing companies: A review and research framework , 2016, Eur. J. Oper. Res..
[23] Peng-Jen Lai,et al. Evaluate the fuzzy completion times in the fuzzy flow shop scheduling problems using the virus-evolutionary genetic algorithms , 2011, Appl. Soft Comput..
[24] René Thomsen,et al. A comparative study of differential evolution, particle swarm optimization, and evolutionary algorithms on numerical benchmark problems , 2004, Proceedings of the 2004 Congress on Evolutionary Computation (IEEE Cat. No.04TH8753).
[25] Laine Mears,et al. Energy, economy, and environment analysis and optimization on manufacturing plant energy supply system , 2016 .
[26] H. Abbass. The self-adaptive Pareto differential evolution algorithm , 2002, Proceedings of the 2002 Congress on Evolutionary Computation. CEC'02 (Cat. No.02TH8600).
[27] Richard F. Hartl,et al. A metaheuristic optimization approach for a real-world stochastic flexible flow shop problem with limited buffer , 2013 .
[28] Min Dai,et al. Energy-efficient dynamic scheduling for a flexible flow shop using an improved particle swarm optimization , 2016, Comput. Ind..
[29] Bing-Hai Zhou,et al. Multi-objective optimization of material delivery for mixed model assembly lines with energy consideration , 2018, Journal of Cleaner Production.
[30] Rubén Ruiz,et al. The hybrid flow shop scheduling problem , 2010, Eur. J. Oper. Res..
[31] John W. Sutherland,et al. Flow shop scheduling with peak power consumption constraints , 2013, Ann. Oper. Res..
[32] Inyong Ham,et al. A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem , 1983 .
[33] John W. Sutherland,et al. A new approach to scheduling in manufacturing for power consumption and carbon footprint reduction , 2011 .
[34] Yuyan Han,et al. Efficient multi-objective optimization algorithm for hybrid flow shop scheduling problems with setup energy consumptions , 2018 .
[35] Christoph Herrmann,et al. Global manufacturing and the embodied energy of products , 2010 .
[36] S.M.T. Fatemi Ghomi,et al. Hybrid flow shop scheduling with sequence dependent family setup time and uncertain due dates , 2014 .
[37] Michael S. Salvador,et al. A Solution to a Special Class of Flow Shop Scheduling Problems , 1973 .
[38] Mehmet Fatih Tasgetiren,et al. A discrete differential evolution algorithm for single machine total weighted tardiness problem with sequence dependent setup times , 2008, IEEE Congress on Evolutionary Computation.
[39] Ying Wang,et al. An adaptive chaotic differential evolution for the short-term hydrothermal generation scheduling problem , 2010 .
[40] Ju-Yong Lee,et al. A Two-Stage Assembly-Type Flowshop Scheduling Problem for Minimizing Total Tardiness , 2016 .
[41] Chandrasekharan Rajendran,et al. Scheduling in n-job, m-stage flowshop with parallel processors to minimize makespan , 1992 .
[42] Salwani Abdullah,et al. Fuzzy job-shop scheduling problems: A review , 2014, Inf. Sci..
[43] Tadeusz Sawik,et al. Mixed integer programming for scheduling flexible flow lines with limited intermediate buffers , 2000 .
[44] Jinxing Xie,et al. Minimum deviation algorithm for two-stageno-wait flowshops with parallel machines , 2004 .
[45] Moon Sik Jeong,et al. Simulation Study on Miscibility Effect of CO2/Solvent Injection for Enhanced Oil Recovery at Nonisothermal Conditions , 2016 .
[46] Kamran Kianfar,et al. Study of stochastic sequence-dependent flexible flow shop via developing a dispatching rule and a hybrid GA , 2012, Eng. Appl. Artif. Intell..
[47] Hamid R. Tizhoosh,et al. Opposition-Based Learning: A New Scheme for Machine Intelligence , 2005, International Conference on Computational Intelligence for Modelling, Control and Automation and International Conference on Intelligent Agents, Web Technologies and Internet Commerce (CIMCA-IAWTIC'06).
[48] Didier Dubois,et al. Fuzzy scheduling: Modelling flexible constraints vs. coping with incomplete knowledge , 2003, Eur. J. Oper. Res..
[49] Wang Shengyao. An artificial bee colony algorithm for solving hybrid flow-shop scheduling problem with unrelated parallel machines , 2012 .
[50] Jatinder N. D. Gupta,et al. Two-Stage, Hybrid Flowshop Scheduling Problem , 1988 .
[51] Dong-Ho Lee,et al. Scheduling algorithms for remanufacturing systems with parallel flow-shop-type reprocessing lines , 2015 .
[52] Janet M. Twomey,et al. Operational methods for minimization of energy consumption of manufacturing equipment , 2007 .
[53] George Q. Huang,et al. Hybrid flow shop scheduling considering machine electricity consumption cost , 2013 .