A Method for Optimizing Jet-Mill-Bit Hydraulics in Horizontal Drilling
暂无分享,去创建一个
Boyun Guo | Deli Gao | Chen Xuyue | Xuyue Chen | D. Gao | B. Guo | Xuyue Chen
[1] Wan-Shu Chang. Method of Optimal Parameter Ascertainment of Jet Pump , 2004 .
[2] Stuart R. Keller,et al. Torque Reduction Techniques in ERD Wells , 2006 .
[3] Erhu Gao,et al. Hole Cleaning in Extended Reach Wells: Field Experience and Theoretical Analysis Using a Pseudo-Oil (Acetal) Based Mud , 1995 .
[4] F. A. França,et al. Improved Two-Phase Model for Hydraulic Jet Pumps , 1998 .
[5] M. Shaibani,et al. Production of grey cast iron powder via target jet milling , 2012 .
[6] P. V. Suryanarayana,et al. Technical Feasibility and Applicability of a Concentric Jet Pump in Underbalanced Drilling , 2004 .
[7] Frederic Hoffmann,et al. Research on Jet Pumps for Single and Multiphase Pumping of Crudes , 1987 .
[8] Ramadan Ahmed,et al. Transport of Small Cuttings in Extended-Reach Drilling , 2008 .
[9] P. M. Wilson,et al. Jet pumping oil wells , 1983 .
[10] D. A. Shah,et al. Efficiency of Jet Pumps , 2000 .
[11] Kermit E. Brown,et al. The technology of artificial lift methods , 1977 .
[12] C. Crowe,et al. Engineering fluid mechanics , 1975 .
[13] R. G. Cunningham. Gas Compression With the Liquid Jet Pump , 1974 .
[14] G. J. Guild,et al. Hole Cleaning Program for Extended Reach Wells , 1995 .
[15] Arthur G. Hansen,et al. Jet Pump Cavitation , 1970 .