Determinants for order-fulfilment strategies in engineer-to-order companies: Insights from the machinery industry

Recent empirical studies have refined our understanding of engineer-to-order (ETO) situations, supporting the existence of different order-fulfilment strategies based on the degree of customer involvement in the engineering and production activities, which differs depending on the strategic fit with the environment in which the company operates. Despite the importance of this finding, limited attempts have been made to comprehensively understand the determinants for this strategic choice in ETO companies. To overcome this gap, this study aimed to investigate the sources of differentiation between the environments that ETO companies can face and the ways of reacting to strategically fit the order-fulfilment strategy. Therefore, this research analysed the existing literature through a contingency theory lens and performed a multiple case-study research in a specific ETO sector, i.e. the machinery industry. The study identified five different order-fulfilment strategies implemented in the machinery industry to provide different product families to the market. For each strategy, the different environment characteristics were defined, and the performance outcome was measured, explaining the rationale for the positioning of the product families in different strategies. The findings of this study have two main contributions. First, the study contributes to theory by deepening and refining the analysis of contingencies for choosing different order-fulfilment strategies in the ETO context. Second, the study provides practical guidelines to ETO companies that want to adapt their order-fulfilment strategies to the unexpected or planned changes in their environment.

[1]  Jc Johan Wortmann,et al.  Customer-driven manufacturing , 1996 .

[2]  M. Christopher,et al.  An Integrated Model for the Design of Agile Supply Chains. , 2001 .

[3]  Jan Olhager,et al.  The role of the customer order decoupling point in production and supply chain management , 2010, Comput. Ind..

[4]  Joakim Wikner,et al.  Integrating production and engineering perspectives on the customer order decoupling point , 2005 .

[5]  Jan Ola Strandhagen,et al.  Improving coordination in an engineer-to-order supply chain using a soft systems approach , 2017 .

[6]  Jan Ola Strandhagen,et al.  Strategies for customized shipbuilding with different customer order decoupling points , 2014 .

[7]  Jean Hartley,et al.  Case study research , 2004 .

[8]  Paolo Trucco,et al.  Understanding dynamism and complexity factors in engineer-to-order and their influence on lean implementation strategy , 2016 .

[9]  M. Naim,et al.  Engineer-to-order supply chain management: A literature review and research agenda , 2009 .

[10]  C. Forza,et al.  Leveraging high-involvement practices to develop mass customization capability: A contingent configurational perspective , 2018 .

[11]  Tommaso Rossi,et al.  Engineering and production decoupling configurations: An empirical study in the machinery industry , 2019, International Journal of Production Economics.

[12]  Abd. Rahman Abdul Rahim,et al.  The need for a new product development framework for engineer‐to‐order products , 2003 .

[13]  Martin Rudberg,et al.  Classification of production systems for industrialized building: a production strategy perspective , 2014 .

[14]  K. Eisenhardt Building theories from case study research , 1989, STUDI ORGANIZZATIVI.

[15]  Mohamed Mohamed Naim,et al.  Choice and delivery in housebuilding: lessons from Japan for UK housebuilders , 2003 .

[16]  M. Christopher,et al.  Developing Market Specific Supply Chain Strategies , 2002 .

[17]  D. Lambert,et al.  Issues in Supply Chain Management , 2000 .

[18]  J. Whitney Case Study Research , 1999 .

[19]  Matthew B. Miles,et al.  Qualitative Data Analysis: An Expanded Sourcebook , 1994 .

[20]  N. Venkatraman,et al.  The Concept of Fit in Strategy Research: Towards Verbal and Statistical Correspondence , 2018 .

[21]  Paul Meara,et al.  The rediscovery of vocabulary , 2002 .

[22]  Noemi Sinkovics Pattern matching in qualitative analysis , 2018 .

[23]  Danny Samson,et al.  Effective case research in operations management: a process perspective , 2002 .

[24]  D. P. van Donk,et al.  The impact of the customer order decoupling point on type and level of supply chain integration , 2016 .

[25]  Christopher Earl,et al.  Modelling supply chain management processes in engineer-to-order companies , 1999 .

[26]  Joel Johansson,et al.  Knowledge Objects Enable Mass-Individualization , 2018, Computational Methods in Applied Sciences.

[27]  Mohamed Mohamed Naim,et al.  Extending customer order penetration concepts to engineering designs , 2017 .

[28]  Daryl Powell,et al.  Exploring the archetypes of engineer-to-order: an empirical analysis , 2016 .

[29]  Anders Haug,et al.  From engineer‐to‐order to mass customization , 2009 .

[30]  Richard B. Chase,et al.  Operations Management , 2019, CCSP (ISC)2 Certified Cloud Security Professional Official Study Guide, 2nd Edition.

[31]  Ping Ji,et al.  Positioning multiple decoupling points in a supply network , 2008 .

[32]  F. Luthans,et al.  A General Contingency Theory of Management , 1977 .

[33]  Harry Boer,et al.  Designing and developing OM research – from concept to publication , 2018 .

[34]  Jc Johan Wortmann Production management systems for one-of-a-kind products , 1992 .

[35]  John J. Sviokla,et al.  Staple yourself to an order , 1993 .

[36]  Lars Hvam,et al.  Return on investment from the use of product configuration systems - A case study , 2018, Comput. Ind..

[37]  Christopher Earl,et al.  A Typology of UK Engineer-to-Order Companies , 2001 .

[38]  M. Christopher,et al.  Understanding, Implementing and Exploiting Agility and Leanness , 2002 .

[39]  B. Flyvbjerg What you Should Know about Megaprojects and Why: An Overview , 2014, 1409.0003.

[40]  Pmj Paul Giesberts,et al.  Dynamics of the customer order decoupling point: impact on information systems for production control , 1992 .

[41]  P. Lawrence,et al.  Differentiation and Integration in Complex Organizations , 1967 .

[42]  J. C. Wortmann A Classification Scheme for Master Production Scheduling , 1983 .

[43]  Cecil Bozarth,et al.  A contingency view of time‐based competition for manufacturers , 1996 .

[44]  Denis Royston Towill,et al.  Lean, agile or leagile? Matching your supply chain to the marketplace , 2000 .

[45]  Amos H. C. Ng,et al.  Dynamic implications of customer order decoupling point positioning , 2011 .

[46]  Rob Dekkers,et al.  Engineering management and the Order Entry Point , 2006 .

[47]  R. Stake The art of case study research , 1995 .

[48]  Franco Caron,et al.  ‘Engineer to order’ companies: how to integrate manufacturing and innovative processes , 1995 .

[49]  T. Hill Manufacturing Strategy: The Strategic Management of the Manufacturing Function , 1985 .

[50]  B. Kingsman,et al.  Competitive advantage, customisation and a new taxonomy for non make-to-stock companies , 1999 .

[51]  Rob Dekkers,et al.  The interface between “product design and engineering” and manufacturing: A review of the literature and empirical evidence , 2013 .

[52]  Danny Berry,et al.  Leagility: Integrating the lean and agile manufacturing paradigms in the total supply chain , 1999 .

[53]  James D. Thompson Organizations in Action: Social Science Bases of Administrative Theory , 1967 .

[54]  Giovani J.C. da Silveira,et al.  The relationship between servitization and product customization strategies , 2019, International Journal of Operations & Production Management.

[55]  Francesco Ricotta,et al.  Customizing customization: A conceptual framework for interactive personalization , 2007 .

[56]  Tommaso Rossi,et al.  Integrate Customer Order Decoupling Point and Mass Customisation Concepts: A Literature Review , 2018 .

[57]  Jan Olhager,et al.  Differentiating manufacturing focus , 2006 .

[58]  Pa Paul Konijnendijk Dependence and conflict between production and sales , 1993 .

[59]  S. Hoekstra,et al.  Integral Logistic Structures: Developing Customer-Oriented Goods Flow , 1992 .

[60]  Urban Wemmerlöv,et al.  Assemble-to-order manufacturing: Implications for materials management , 1984 .

[61]  D. Towill,et al.  Supply chain migration from lean and functional to agile and customised , 2000 .

[62]  Mohamed Mohamed Naim,et al.  Product, process and customer preference alignment in prefabricated house building , 2017 .

[63]  Lars Hvam,et al.  Understanding the impact of non-standard customisations in an engineer-to-order context: A case study , 2019, Int. J. Prod. Res..

[64]  Msn DHSc Adel F. Almutairi Rn,et al.  Practical guidance for the use of a pattern-matching technique in case-study research: A case presentation , 2013 .

[65]  M. Fisher What is the Right Supply Chain for Your Product , 1997 .

[66]  V. Donk Make to stock or make to order: the decoupling point in the food processing industries , 2001 .

[67]  Federico Adrodegari,et al.  Engineer-to-order (ETO) production planning and control: an empirical framework for machinery-building companies , 2015 .

[68]  Bart L. MacCarthy,et al.  An analysis of order fulfilment approaches for delivering variety and customisation , 2013 .

[69]  Bob Algozzine,et al.  Doing Case Study Research: A Practical Guide for Beginning Researchers. Third Edition. , 2006 .

[70]  G. Kovács,et al.  Abductive reasoning in logistics research , 2005 .

[71]  Bart L. MacCarthy,et al.  Responsiveness of the order fulfilment process , 1999 .

[72]  Christian Hicks,et al.  Supply chain management: A strategic issue in engineer to order manufacturing , 2000 .

[73]  Fredrik Elgh,et al.  Modeling of transdisciplinary engineering assets using the design platform approach for improved customization ability , 2018, Adv. Eng. Informatics.

[74]  Yi Yang,et al.  Decision model of customer order decoupling point on multiple customer demands in logistics service supply chain , 2014 .

[75]  Michel Aldanondo,et al.  Configuration knowledge modeling: How to extend configuration from assemble/make to order towards engineer to order for the bidding process , 2018, Comput. Ind..

[76]  A. A. Alblas,et al.  Managing design variety, process variety and engineering change: a case study of two capital good firms , 2012 .

[77]  Roger Jianxin Jiao,et al.  Mass customization design of engineer-to-order products using Benders’ decomposition and bi-level stochastic programming , 2013, J. Intell. Manuf..

[78]  Christopher A. Voss,et al.  Contingency research in operations management practices , 2008 .

[79]  B. Joseph Pine,et al.  Making mass customization happen: Strategies for the new competitive realities , 1993 .

[80]  Jan Olhager,et al.  Strategic positioning of the order penetration point , 2003 .

[81]  Stanley M. Davis,et al.  From “future perfect”: Mass customizing , 1989 .

[82]  Jan Ola Strandhagen,et al.  Analyzing the factors affecting coordination in engineer-to-order supply chain , 2015 .

[83]  Lars-Erik Gadde,et al.  Systematic combining: an abductive approach to case research , 2002 .

[84]  T. Abma,et al.  qualitative research: is meaning lost in translation? , 2022 .

[85]  Joakim Wikner,et al.  Mass customization in terms of the customer order decoupling point , 2004 .

[86]  Jan Ola Strandhagen,et al.  The role of coordination in avoiding project delays in an engineer-to-order supply chain , 2015 .

[87]  Joakim Wikner,et al.  Production planning and control tools , 2000 .

[88]  M. Christopher,et al.  A taxonomy for selecting global supply chain strategies , 2006 .