Reliability and Maintenance Prioritization Analysis of Combined Cooling, Heating and Power Systems

A combined cooling, heating, and power (CCHP) system is a complex and repairable system containing a large number of components and series of subsystems. When a failure occurs in one component, it might cause a failure of a subsystem or whole system. Traditional maintenance methods might lead to the waste of maintenance resources and a high cost of maintenance. The reliability and maintenance prioritization analyses can help managers optimize maintenance strategies and reduce the total cost. A reliability importance index is one of the factors in maintenance prioritization analysis. This paper aims at selecting the component reliability importance indices to identify the priority of component maintenance of a CCHP system from the perspective of maintenance cost. Failure cost importance index (FCI) and Potential failure cost importance index (PI) are developed for the maintenance prioritization analysis of a CCHP system. A Markov model based on the state–space method (SSM) is used to analyze the reliability and availability of a CCHP system. A set of actual survey reliability data of CCHP systems is used to support the validity of the reliability importance indices. The results indicate that the FCI and PI might lead to different rankings of maintenance prioritization. The FCI and PI will help managers make a reasonable decision for maintenance on a cost basis.

[1]  Ting-Chia Ou,et al.  Design of a Novel Voltage Controller for Conversion of Carbon Dioxide into Clean Fuels Using the Integration of a Vanadium Redox Battery with Solar Energy , 2018 .

[2]  You-Yin Jing,et al.  Life cycle assessment of a solar combined cooling heating and power system in different operation strategies , 2012 .

[3]  Peter Tavner,et al.  Failure Modes and Effects Analysis (FMEA) for wind turbines. , 2010 .

[4]  Rajesh Arya,et al.  Ranking of feeder sections of distribution systems for maintenance prioritization accounting distributed generations and loads using diagnostic importance factor (DIF) , 2016 .

[5]  Ronnie Belmans,et al.  Distributed generation: definition, benefits and issues , 2005 .

[6]  Tao Zhang,et al.  Multi-Objective Optimal Design of Renewable Energy Integrated CCHP System Using PICEA-g , 2018, Energies.

[7]  Zaijun Wu,et al.  Modeling, planning and optimal energy management of combined cooling, heating and power microgrid: A review , 2014 .

[8]  Magdy M. A. Salama,et al.  Distributed generation technologies, definitions and benefits , 2004 .

[9]  Chih-Ming Hong,et al.  Dynamic operation and control of microgrid hybrid power systems , 2014 .

[10]  Chunfa Zhang,et al.  Environmental impact analysis of BCHP system in different climate zones in China , 2010 .

[11]  Mahmud Fotuhi-Firuzabad,et al.  Reliability modeling and availability analysis of combined cycle power plants , 2016 .

[12]  Lei Wang,et al.  Reliability Assessment of Wind Farm Electrical System Based on a Probability Transfer Technique , 2018 .

[13]  Pedro J. Mago,et al.  Combined cooling, heating and power: A review of performance improvement and optimization , 2014 .

[14]  Marcantonio Catelani,et al.  Component Reliability Importance assessment on complex systems using Credible Improvement Potential , 2016, Microelectron. Reliab..

[15]  Behnam Mohammadi-Ivatloo,et al.  Reliability assessment of generating systems containing wind power and air separation unit with cryogenic energy storage , 2018 .

[16]  Jiangjiang Wang,et al.  Reliability and availability analysis of redundant BCHP (building cooling, heating and power) system , 2013 .

[17]  Toshio Ojima,et al.  STUDY ON ESTIMATE FORMULAE OF MAINTENANCE COST AND EVALUATION METHOD OF RENEWAL PERIOD ON AIR CONDITIONING SYSTEM IN OFFICE BUILDING , 2001 .

[18]  Chiou-Jye Huang,et al.  Improvement of Transient Stability in a Hybrid Power Multi-System Using a Designed NIDC (Novel Intelligent Damping Controller) , 2017 .

[19]  Ting-Chia Ou,et al.  A novel unsymmetrical faults analysis for microgrid distribution systems , 2012 .

[20]  S. S. Kachhwaha,et al.  Development of reliability index for combined cycle power plant using graph theoretic approach , 2014 .

[21]  Michel Noussan,et al.  Multicarrier energy systems: Optimization model based on real data and application to a case study , 2018 .

[22]  M.-R. Haghifam,et al.  Reliability and availability modelling of combined heat and power (CHP) systems , 2011 .

[23]  Jin Ma,et al.  Multi-Objective Optimal Energy Management for the Integrated Electrical and Natural Gas Network with Combined Cooling, Heat and Power Plants , 2018 .

[24]  Christos A. Frangopoulos,et al.  Effect of reliability considerations on the optimal synthesis, design and operation of a cogeneration system , 2004 .

[25]  Ali M. El-Nashar,et al.  Optimal design of a cogeneration plant for power and desalination taking equipment reliability into consideration. , 2008 .

[26]  Ferdinando Salata,et al.  Energy retrofitting of residential buildings—How to couple Combined Heat and Power (CHP) and Heat Pump (HP) for thermal management and off-design operation , 2017 .

[27]  Fei Wang,et al.  Search Improvement Process-Chaotic Optimization-Particle Swarm Optimization-Elite Retention Strategy and Improved Combined Cooling-Heating-Power Strategy Based Two-Time Scale Multi-Objective Optimization Model for Stand-Alone Microgrid Operation , 2017 .

[28]  Weijun Gao,et al.  Investigation and Evaluation on District Energy System at Kitakyushu Science and Research Park , 2005 .

[29]  Kai Yao,et al.  Importance Index of Components in Uncertain Reliability Systems , 2016 .

[30]  Amik Garg,et al.  Maintenance management: literature review and directions , 2006 .

[31]  Yang Shi,et al.  Combined cooling, heating and power systems: A survey , 2014 .

[32]  Hamze Hajian-Hoseinabadi Reliability and component importance analysis of substation automation systems , 2013 .