Application of Principal-Component Analysis to Long-Term Reservoir Management

Determining the optimal long-term operating policy of a multireservoir power system requires solution of a stochastic nonlinear programming problem. The paper presents a very efficient procedure for the case where high correlation exists between the reservoirs trajectories and, hence, between the state variables. It consists in performing principal-component analysis (PCA) on the trajectories to find a reduced model of the system. The reduced model is then substituted into the operating problem and the resulting problem is solved by stochastic dynamic programming. The reservoir trajectories on which the PCAs are performed can be obtained by solving the operating problem deterministically for a large number of equally likely flow sequences. The results of applying the manipulation of Quebec's La Grande river, which has five reservoirs, are reported.

[1]  L. Bodin,et al.  Multireservoir Operation Studies , 1970 .

[2]  A. I. Mckerchar Optimal monthly operation of interconnected hydroelectric power storages , 1975 .

[3]  Jakob Rosing,et al.  Composite Representation of a Multireservoir Hydroelectric Power System , 1970 .

[4]  Thomas E. Croley,et al.  Sequential Stochastic Optimization for Reservoir System , 1974 .

[5]  P. Lederer,et al.  Overall control of an electricity supply and demand system: A global feedback for the french system , 1984 .

[6]  Ramanathan Gnanadesikan,et al.  Methods for statistical data analysis of multivariate observations , 1977, A Wiley publication in applied statistics.

[7]  A. Turgeon Optimal operation of multireservoir power systems with stochastic inflows , 1980 .

[8]  André Turgeon A decomposition method for the long-term scheduling of reservoirs in series , 1981 .

[9]  V. Quintana,et al.  A Stochastic Model for Mid-Term Operation Planning of Hydro-Thermal Systems with Random Reservoir Inflows , 1981, IEEE Transactions on Power Apparatus and Systems.

[10]  G. Sanchez,et al.  Optimal Operation of Multireservoir Systems Using an Aggregation-Decomposition Approach , 1985, IEEE Power Engineering Review.

[11]  G. K. Young Finding Reservoir Operating Rules , 1967 .

[12]  K. Moslehi,et al.  Stochastic Long-Term Hydrothermal Optimization for a Multireservoir System , 1985, IEEE Power Engineering Review.

[13]  Mario V. F. Pereira,et al.  OPERATION PLANNING OF LARGE-SCALE HYDROELECTRICAL SYSTEMS , 1984 .

[14]  A. Turgeon An application of parametric mixed‐integer linear programming to hydropower development , 1987 .

[15]  J. Quadrat,et al.  Contribution of stochastic control singular perturbation averaging and team theories to an example of large-scale systems: Management of hydropower production , 1978 .