Construction Delays in Clients Opinion – Multivariate Statistical Analysis
暂无分享,去创建一个
[1] Agnieszka Leśniak,et al. Errors in the preparation of design documentation in public procurement in Poland , 2014 .
[2] R. Cattell. The Scree Test For The Number Of Factors. , 1966, Multivariate behavioral research.
[3] Martin Skitmore,et al. Causes of delays in Saudi Arabian public sector construction projects , 2009 .
[4] Ajibade A. Aibinu,et al. Construction delays and their causative factors in Nigeria , 2006 .
[5] Monika Płaziak,et al. Construction Sector in the Czech Republic and Poland: Focus on the Housing Segment in Selected Regions , 2014 .
[6] H. Kaiser. The varimax criterion for analytic rotation in factor analysis , 1958 .
[7] D. Arditi,et al. Reasons for delays in public projects in Turkey , 1985 .
[8] Eva Trinkūnienė,et al. Knowledge Management in Composition of Construction Contracts , 2014 .
[9] C. S Lim,et al. An exploratory study into recurring construction problems , 2000 .
[10] K. Jöreskog. Some contributions to maximum likelihood factor analysis , 1967 .
[11] Donna Harrington,et al. Confirmatory Factor Analysis , 2008 .
[12] Sameh M. El-Sayegh,et al. Significant factors causing delay in the UAE construction industry , 2006 .
[13] Jae-On Kim,et al. Factor Analysis: Statistical Methods and Practical Issues , 1978 .
[14] Ayman Abu Hammad,et al. Delays in construction projects: The case of Jordan , 2008 .
[15] M. Bartlett,et al. A note on the multiplying factors for various chi square approximations , 1954 .
[16] Stephen O. Ogunlana,et al. Problems causing delays in major construction projects in Thailand , 2008 .
[17] Roderick P. McDonald,et al. Factor Analysis and Related Methods , 1985 .
[18] H. Kaiser. An index of factorial simplicity , 1974 .
[19] R. Rummel. Applied Factor Analysis , 1970 .