Construction Delays in Clients Opinion – Multivariate Statistical Analysis

Abstract Timely implementation of construction works (at the scheduled time) is vital for both the investor and the contractor. Yet construction projects, even those perfectly planned and organized, run the risk of delays. Despite many tools supporting construction management, delays keep occurring in construction projects. The present paper presents the findings of a survey aimed at identifying the most important causes of delays in construction works from the client's perspective. A factor analysis that was performed allow to interpret the dependencies between them. The knowledge can be helpful for minimizing the risk of delays.

[1]  Agnieszka Leśniak,et al.  Errors in the preparation of design documentation in public procurement in Poland , 2014 .

[2]  R. Cattell The Scree Test For The Number Of Factors. , 1966, Multivariate behavioral research.

[3]  Martin Skitmore,et al.  Causes of delays in Saudi Arabian public sector construction projects , 2009 .

[4]  Ajibade A. Aibinu,et al.  Construction delays and their causative factors in Nigeria , 2006 .

[5]  Monika Płaziak,et al.  Construction Sector in the Czech Republic and Poland: Focus on the Housing Segment in Selected Regions , 2014 .

[6]  H. Kaiser The varimax criterion for analytic rotation in factor analysis , 1958 .

[7]  D. Arditi,et al.  Reasons for delays in public projects in Turkey , 1985 .

[8]  Eva Trinkūnienė,et al.  Knowledge Management in Composition of Construction Contracts , 2014 .

[9]  C. S Lim,et al.  An exploratory study into recurring construction problems , 2000 .

[10]  K. Jöreskog Some contributions to maximum likelihood factor analysis , 1967 .

[11]  Donna Harrington,et al.  Confirmatory Factor Analysis , 2008 .

[12]  Sameh M. El-Sayegh,et al.  Significant factors causing delay in the UAE construction industry , 2006 .

[13]  Jae-On Kim,et al.  Factor Analysis: Statistical Methods and Practical Issues , 1978 .

[14]  Ayman Abu Hammad,et al.  Delays in construction projects: The case of Jordan , 2008 .

[15]  M. Bartlett,et al.  A note on the multiplying factors for various chi square approximations , 1954 .

[16]  Stephen O. Ogunlana,et al.  Problems causing delays in major construction projects in Thailand , 2008 .

[17]  Roderick P. McDonald,et al.  Factor Analysis and Related Methods , 1985 .

[18]  H. Kaiser An index of factorial simplicity , 1974 .

[19]  R. Rummel Applied Factor Analysis , 1970 .