The Less Agents, the More Schedule Reliability: Examination of Single-Point Responsibility Model in Design Management

Despite its importance, little research, has studied schedule reliability from resource management perspective. This paper studies the association between the task–agent relationship and the reliability of project schedule. Four case studies are presented to examine the effect of task–agent relationships. To do so, the tasks are categorized into two groups according to their relationships with agents: single-agent and multi-agent. The groups are then compared in terms of mean lateness, lateness variance, and schedule reliability. To measure the schedule reliability, the formulations are adapted from the production and manufacturing literature to the context of design and construction. The results show that the schedules of single-agent tasks are more reliable than multi-agent tasks. Statistical tests uphold the significance of this difference, especially in design projects, as well as the projects with similar contexts. It is argued that single-agent tasks take advantage of role clarity, autonomy, and KSA (knowledge, skill, abilities) conformity. In addition, in view of promise theory, single-agent tasks are less subject to agents-in-the-middle effect and benefit from locality. The findings are of practical value to consulting firms, especially design team managers who seek to maximize innovation, competency and quality outcome.

[1]  H. Kaebernick,et al.  Modelling Concurrent Engineering Projects Under Uncertainty , 1999 .

[2]  Wei-Chih Wang,et al.  APPLICATION OF IMPORTANCE-SATISFACTION ANALYSIS AND INFLUENCE-RELATIONS MAP TO EVALUATE DESIGN DELAY FACTORS , 2014 .

[3]  William H. Bommer,et al.  Relationships between leader reward and punishment behavior and subordinate attitudes, perceptions, and behaviors: A meta-analytic review of existing and new research , 2006 .

[4]  S. Washington,et al.  Statistical and Econometric Methods for Transportation Data Analysis , 2010 .

[5]  Shraddha Palikhe,et al.  Critical Success Factors and Dynamic Modeling of Construction Labour Productivity , 2019 .

[6]  Andrew N. Baldwin,et al.  Planning building design by simulating information flow , 1998 .

[7]  D. V. Steward,et al.  The design structure system: A method for managing the design of complex systems , 1981, IEEE Transactions on Engineering Management.

[8]  Keith R. Molenaar,et al.  Sensitivity of Construction Activities under Design Uncertainty , 2009 .

[9]  Luis F. Alarcón,et al.  Achieving Lean Design Process: Improvement Methodology , 2002 .

[10]  Vegard Knotten,et al.  Design Management in the Building Process - A Review of Current Literature , 2015 .

[11]  Peter R. Monge,et al.  Participation, Satisfaction, and Productivity: A Meta-Analytic Review , 1986 .

[12]  Claus W. Langfred,et al.  Effects of task autonomy on performance: an extended model considering motivational, informational, and structural mechanisms. , 2004, The Journal of applied psychology.

[13]  Iris D. Tommelein,et al.  DePlan: a tool for integrated design management , 2004 .

[14]  Richard,et al.  Motivation through the Design of Work: Test of a Theory. , 1976 .

[15]  S. Abourizk,et al.  STATISTICAL PROPERTIES OF CONSTRUCTION DURATION DATA , 1992 .

[16]  Awad S. Hanna,et al.  Best Practices for Integrating the Concurrent Engineering Environment into Multipartner Project Management , 2008 .

[17]  S. Emmitt,et al.  Perceptions of lean design management , 2013 .

[18]  Koshy Varghese,et al.  Application of Dependency Structure Matrix for Activity Sequencing in Concurrent Engineering Projects , 2006 .

[19]  A. J. Clewett,et al.  Introduction to sequencing and scheduling , 1974 .

[20]  Glenn Ballard,et al.  Managing work flow on design projects: a case study , 2002 .

[21]  J. Richard Hackman,et al.  Work redesign and motivation , 1980 .

[22]  Gudela Grote,et al.  Management of Uncertainty: Theory and Application in the Design of Systems and Organizations , 2009 .

[23]  Bon-Gang Hwang,et al.  Rework and schedule performance: A profile of incidence, impact, causes and solutions , 2014 .

[24]  John Kelsey,et al.  What do construction project planners do , 2005 .

[25]  Ali A. Yassine,et al.  Engineering design management: An information structure approach , 1999 .

[26]  Anthony Stentz,et al.  Market-based Multirobot Coordination for Complex Tasks , 2006, Int. J. Robotics Res..

[27]  Hermann Lödding,et al.  Modelling schedule reliability , 2015 .

[28]  Mario Vanhoucke,et al.  Construction and evaluation framework for a real-life project database , 2015 .

[29]  Iris D. Tommelein,et al.  Understanding the role of “tasks anticipated” in lookahead planning through simulation , 2015 .