Optimal Scheduling of Material Handling Devices in a PCB Production Line: Problem Formulation and a Polynomial Algorithm
暂无分享,去创建一个
[1] Pierre Baptiste,et al. Resolution Of The Cyclic Multi-Hoists Scheduling Problem With Overlapping Partitions , 1997 .
[2] Chengbin Chu,et al. A polynomial algorithm for no-wait cyclic hoist scheduling in an extended electroplating line , 2005, Oper. Res. Lett..
[3] Ronald D. Armstrong,et al. A greedy algorithm to determine the number of transporters in a cyclic electroplating process , 1996 .
[4] Guoqing Zhang,et al. Optimal cyclic scheduling for printed circuit board production lines with multiple hoists and general processing sequence , 2003, IEEE Trans. Robotics Autom..
[5] Eugene Levner,et al. Minimizing the number of robots to meet a given cyclic schedule , 1997, Ann. Oper. Res..
[6] Zelda B. Zabinsky,et al. An algorithm for scheduling a chemical processing tank line , 1993 .
[7] Chelliah Sriskandarajah,et al. Minimizing Makespan in Flowshops with Pallet Requirements: Computational Complexity , 1997 .
[8] Alessandro Agnetis,et al. Scheduling no-wait robotic cells with two and three machines , 2000, Eur. J. Oper. Res..
[9] Xiaoguang Yang,et al. Optimal Cyclic Multi-Hoist Scheduling: A Mixed Integer Programming Approach , 2004, Oper. Res..
[10] Vadim E. Levit,et al. An improved algorithm for cyclic flowshop scheduling in a robotic cell , 1997 .
[11] H. Neil Geismar,et al. Sequencing and Scheduling in Robotic Cells: Recent Developments , 2005, J. Sched..
[12] A. Che,et al. Single-track multi-hoist scheduling problem: a collision-free resolution based on a branch-and-bound approach , 2004 .
[13] Yun Jiang,et al. An Efficient Optimal Solution to the Two-Hoist No-Wait Cyclic Scheduling Problem , 2005, Oper. Res..
[14] L. W. Phillips,et al. Mathematical Programming Solution of a Hoist Scheduling Program , 1976 .
[15] Eugene Levner,et al. Cyclic scheduling in a robotic production line , 2002 .
[16] L. Lei,et al. DETERMINING OPTIMAL CYCLIC HOIST SCHEDULES IN A SINGLE-HOIST ELECTROPLATING LINE , 1994 .
[17] Lei Lei,et al. Minimizing the fleet size with dependent time-window and single-track constraints , 1993, Oper. Res. Lett..
[18] Chengbin Chu,et al. Cyclic scheduling of a hoist with time window constraints , 1998, IEEE Trans. Robotics Autom..